14.6 Recommended Load ReductionsLoad Duration Curves in the Plum Creek WPP, prepared by the Texas AgriLifeExtension Service, indicate both point and non-point pollution sources should bereduced. Water quantity and quality monitoring stations at Lockhart and Lulingprovided flows and water quality data used to compute existing pollutant loads.The recommended allowable pollutant loads were subtracted from the existingloads to determine the load reduction required. The recommended pollutant loadreductions as a percentage of existing loads are shown in Table 14-1.TABLE 14-1Pollution Reduction NeededLocationParameterE.coli Bacteria Phosphorus NitrateLockhart 65% 27% 43%Luling 15% 49% 80%14.7 Proposed Management MeasuresThe proposed management measures identified in the Plum Creek WPP arespecific to Plum Creek but can be implemented in parts of the county that are notwithin the Plum Creek Watershed. The measures are intended to reduce bacterialloads but will also influence the reduction in nutrient loads. Nutrient loadsassociated from urban landscaping and cropland will also be addressed.Additionally, management measures will also focus on the reduction ofphosphorus loads.Naturally occurring nitrate in groundwater has been reported to discharge intoPlum Creek and create impaired water quality conditions (nitrate concentrationsexceed desired limits). Management efforts directed at nitrates should be focusedon ensuring that additional nitrates from non-groundwater sources are not addedto streams and measures are implemented to prevent further increases in nitrateconcentrations in groundwater.Klotz Associates Project No. 0972.000.000January 201014-6Caldwell County Regional Water and Wastewater Planning StudyFinal Report
14.7.1 Urban Stormwater Management MeasuresA workgroup from the Plum Creek WPP specified implementation goals andplaced emphasis on programs consistent with Municipal Separate Storm SewerSystem (MS4) requirements. Appendix I lists the city specific measures to beimplemented in Lockhart and Luling.A study, “Predicting Effect of Urban Development on Water Quality in the Citiesof New Braunfels, San Marcos, Seguin and Victoria” was completed inNovember 2000 by PBSJ. The study developed a series of equations to predict theimpact of impervious cover on concentrations of four water quality parameters instormwater runoff. These formulas may be useful in predicting water qualityimpacts from the construction of impervious cover in watersheds and assist indetermining pollutant removal required as part of a construction permit.The formulas are:Total Suspended Solids in mg/L, TSS: TSS = 10^(2.41+(0.0149 IC))Total Nitrogen in mg/L, TN: TN = 1.08+(0.0564* IC)Total Phosphorus in mg/L, TP: TP = 0.0231*ICFecal Coliform, FC in CFU/100mL: FC = 10^(4.0+(0.0229* IC))Where IC is impervious cover expressed as a percentage, ^ is the symbol forexponential and * is the symbol for multiplication.It should be noted that the calculated concentration is an “Event MeanConcentration” (EMC) which is defined as a flow-weighted average. The EMC isused because the concentration of any parameter varies greatly in a storm event asthe hydrograph rises (the first flush event), crests and falls in the trailing limb ofthe hydrograph.Klotz Associates Project No. 0972.000.000January 201014-7Caldwell County Regional Water and Wastewater Planning StudyFinal Report
- Page 100 and 101: TABLE 9-6Caldwell County Projected
- Page 102 and 103: 10.3 United States Environmental Pr
- Page 104 and 105: 10.4.3 Source Water ProtectionSourc
- Page 106 and 107: 10.6.1 E.coli PotentialIt is estima
- Page 108 and 109: TABLE 10-4Estimated Loadings from U
- Page 110 and 111: Klotz Associates Project No. 0972.0
- Page 112 and 113: The proposed GBRA Mid-Basin Project
- Page 114 and 115: 11.1.3 Lower Guadalupe Water Supply
- Page 116 and 117: the maximum available groundwater f
- Page 118 and 119: An ASR is a viable solution. Ground
- Page 120 and 121: The water conservation strategy is
- Page 122 and 123: SECTION 12REGIONAL WATER PLANNING12
- Page 124 and 125: TABLE 12-2Caldwell County Water Sup
- Page 126 and 127: Klotz Associates Project No. 0972.0
- Page 128 and 129: 12.3.2 DistributionThe water will b
- Page 130 and 131: 12.4 Water System Cost EstimatesVar
- Page 132 and 133: 300272GRAPH 13-1Caldwell County OSS
- Page 134 and 135: Klotz Associates Project No. 0972.0
- Page 136 and 137: 2. The Martindale Regional Facility
- Page 138 and 139: decentralized system providing sewe
- Page 140 and 141: Unfortunately, the simplicity of O&
- Page 142 and 143: associated costs. Efficient and fun
- Page 144 and 145: Klotz Associates Project No. 0972.0
- Page 146 and 147: 14.3 Water Quality Concerns and Sou
- Page 148 and 149: wastewater plant return flows. The
- Page 152 and 153: 14.7.2 Water Quality Development Or
- Page 154 and 155: 14.8.3 Vegetative Filter StripsVege
- Page 156 and 157: Use constructed wetlands to capture
- Page 158 and 159: 14.12 Implementation Recommendation
- Page 160 and 161: Type II reclaimed water is defined
- Page 162 and 163: Pollutant loading to streams from e
- Page 164 and 165: Future growth in Caldwell County wi
- Page 166 and 167: 14.12.4 OSSF Annual Inspection and
- Page 168 and 169: Water Quality Monitoring Program -
- Page 170 and 171: execute strategies. Local, state, a
- Page 172 and 173: the environment. Funding for the pr
- Page 174 and 175: the watershed organizations should
- Page 176 and 177: water or groundwater to meet future
- Page 178 and 179: Mid-Basin Project and associated fa
- Page 180: C O N S U L T I N G E N G I N E E R
- Page 191 and 192: APPENDIX B
- Page 193 and 194: APPENDIX B0 / ?% '(0 ;6 ) , 6
- Page 195 and 196: APPENDIX B ) ) ) B C * (
- Page 197 and 198: APPENDIX B &# ! % 44' # (0 5#
- Page 199 and 200: APPENDIX B # %# '(=. )1. )@. )
14.7.1 Urban Storm<strong>water</strong> Management MeasuresA workgroup from the Plum Creek WPP specified implementation goals <strong>and</strong>placed emphasis on programs consistent with Municipal Separate Storm SewerSystem (MS4) requirements. Appendix I lists the city specific measures to beimplemented in Lockhart <strong>and</strong> Luling.A <strong>study</strong>, “Predicting Effect of Urban Development on Water Quality in the Citiesof New Braunfels, San Marcos, Seguin <strong>and</strong> Victoria” was completed inNovember 2000 by PBSJ. The <strong>study</strong> developed a series of equations to predict theimpact of impervious cover on concentrations of four <strong>water</strong> quality parameters instorm<strong>water</strong> runoff. These formulas may be useful in predicting <strong>water</strong> qualityimpacts from the construction of impervious cover in <strong>water</strong>sheds <strong>and</strong> assist indetermining pollutant removal required as part of a construction permit.The formulas are:Total Suspended Solids in mg/L, TSS: TSS = 10^(2.41+(0.0149 IC))Total Nitrogen in mg/L, TN: TN = 1.08+(0.0564* IC)Total Phosphorus in mg/L, TP: TP = 0.0231*ICFecal Coliform, FC in CFU/100mL: FC = 10^(4.0+(0.0229* IC))Where IC is impervious cover expressed as a percentage, ^ is the symbol forexponential <strong>and</strong> * is the symbol for multiplication.It should be noted that the calculated concentration is an “Event MeanConcentration” (EMC) which is defined as a flow-weighted average. The EMC isused because the concentration of any parameter varies greatly in a storm event asthe hydrograph rises (the first flush event), crests <strong>and</strong> falls in the trailing limb ofthe hydrograph.Klotz Associates Project No. 0972.000.000January 201014-7Caldwell County Regional Water <strong>and</strong> Waste<strong>water</strong> Planning StudyFinal Report