• Martindale Regional Waste<strong>water</strong> Treatment Plant in 2040 is expected to treat2.1 million gallons per day receiving 20% of the total waste<strong>water</strong> produced inthe <strong>county</strong>. Approximately 11 miles of main waste<strong>water</strong> collection lines areproposed to service this treatment plant.• Peach Creek Regional Waste<strong>water</strong> Treatment Plant in 2040 is expected totreat 0.6 million gallons per day receiving 5% of the total waste<strong>water</strong>produced. Approximately 9 miles of main waste<strong>water</strong> collection lines areproposed to service this treatment plant.Table 13-3 presents estimated cost for each <strong>regional</strong> treatment plant based on aplant cost of $3.75 per gallon of treatment capacity <strong>and</strong> in-place waste<strong>water</strong> maincost of $125 per linear foot of pipeline. Appendix M presents additionalinformation on the waste<strong>water</strong> cost estimatesTABLE 13-3Regional Waste<strong>water</strong> Collection <strong>and</strong> Treatment Plant Cost EstimatesLockhart PlantEstimated Cost in Millions of DollarsLuling PlantMartindalePlantPeach CreekPlantItem 4.1 mgd 3.6 mgd 2.1 mgd 0.6 mgdPlant Cost $15.3 $13.4 $7.7 $1.9Main Collection Lines $21.1 $20.1 $7.0 $5.7Total $36.4 $33.5 $14.7 $7.6Klotz Associates Project No. 0972.000.000January 201013-13Caldwell County Regional Water <strong>and</strong> Waste<strong>water</strong> Planning StudyFinal Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!