10.07.2015 Views

caldwell county regional water and wastewater planning study

caldwell county regional water and wastewater planning study

caldwell county regional water and wastewater planning study

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12.4 Water System Cost EstimatesVarious studies, reports, <strong>and</strong> recent bids were used to develop cost estimates.Table 12-5 presents a summary of the estimated associated project cost for theproposed transmission lines. Current economic conditions may cause moderatefluctuations in construction costs <strong>and</strong> estimates. Appendix M provides a basis forthe proposed cost estimate.TABLE 12-5Project Summary CostITEMNO. ITEM DESCRIPTION AMOUNT1 Line 1A - Ground<strong>water</strong> Source Route to Lockhart $33,800,0002 Line 1B - Ground<strong>water</strong> Source Route to Luling $30,000,0003 Line 1C - Surface Water Source Route to Luling $51,500,0004 Line 2 - SH 130 North Route $12,000,0005 Line 3 - Northwest Route to Uhl<strong>and</strong> $7,000,0006 Line 4 - SH 130 West $10,000,000It is recommended first to develop wells in the Carrizo/ Wilcox Aquifer initiallywith either Transmission Line 1A or 1B <strong>and</strong> begin to branch out before theexpected growth. As growth occurs, a network of pipelines can begin to beestablished <strong>regional</strong>ly to provide for a <strong>regional</strong> supply. The construction of SH130 presents an opportunity to develop two of the branch network lines to supply<strong>water</strong> in the areas of expected growth. Transmission Line 2 <strong>and</strong> Line 4 arerecommended to parallel SH 130.Klotz Associates Project No. 0972.000.000January 201012-9Caldwell County Regional Water <strong>and</strong> Waste<strong>water</strong> Planning StudyFinal Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!