10.07.2015 Views

QLogic 8 Gb Intelligent Pass-thru Module for IBM BladeCenter ...

QLogic 8 Gb Intelligent Pass-thru Module for IBM BladeCenter ...

QLogic 8 Gb Intelligent Pass-thru Module for IBM BladeCenter ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5 – I/O <strong>Module</strong> ConfigurationTesting a SwitchS• If your workstation has neither an FTP nor a TFTP server, open anFTP session and download the firmware image file by entering FTPcommands:>ftp ip_address or switchnameuser:imagespassword: imagesftp>binftp>put filenameftp>quit2. Display the list of firmware image files on the I/O module to confirm that thefile was loaded.<strong>QLogic</strong>8<strong>Gb</strong>T #> admin start<strong>QLogic</strong>8<strong>Gb</strong>T (admin) $> image list3. Unpack the firmware image file to install the new firmware in flash memory.<strong>QLogic</strong>8<strong>Gb</strong>T (admin) $> image unpack filename4. Wait <strong>for</strong> the unpack to complete.Image unpack command result: <strong>Pass</strong>ed5. A message will prompt you to reset the I/O module to activate the firmware.Use the Hotreset command to attempt a non-disruptive activation.Testing a Switch<strong>QLogic</strong>8<strong>Gb</strong>T (admin) $> hotresetYou can test all ports on a switch using the Test Switch command. There are threetest types: online, offline, and connectivity. Refer to “Testing a Port” on page 6-15<strong>for</strong> in<strong>for</strong>mation about testing individual and ports.The following sections describe the test types, displaying test status, andcancelling a switch test:• Online Tests <strong>for</strong> Switches• Offline Tests <strong>for</strong> Switches• Connectivity Tests <strong>for</strong> Switches• Displaying Switch Test Status• Canceling a Switch Test5-20 59245-01 A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!