3QACMQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTDESIGN REVIEWAMPHITHEATRE DESIGN SEPTEMBER <strong>2012</strong>• OVERVIEW OF CONCEPT MASTER PLAN• OVERVIEW OF SEATING PLAN AND SIGHTLINES• SIDE OF STAGE STORE• PATHWAYS CONNECTION FROM CAFÉ TO STAGE AND CROSSOVER• DISABLED ACCESS/ LIFT• OVERVIEW OF STAGING PLAN AND ASSOCIATED LOGISTICS (I.E. BIO BOX AND OFFICE)CNOVEMBER <strong>2012</strong> REVISION BPG 66


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTNOVEMBER <strong>2012</strong> REVISION BPG 68


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTNOVEMBER <strong>2012</strong> REVISION BPG 69


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTNOVEMBER <strong>2012</strong> REVISION BPG 70


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTNOVEMBER <strong>2012</strong> REVISION BPG 72


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTNOVEMBER <strong>2012</strong> REVISION BPG 73


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTNOVEMBER <strong>2012</strong> REVISION BPG 74


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTDRAFT24/09/12NOVEMBER <strong>2012</strong> REVISION BPG 750 10 20 50 100


POTENTIAL OFF STREET PARKING3POTENTIAL OFF STREET PARKINGNEW CONNECTIONSEXISTING PARKING 15EXISTING PARKING 100EXISTING PARKING 100CONNECTION NODESCNEW CONNECTIONS1000QUARRY AMPHITHEATREDRAFT24/09/12QUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT010 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 76


3#3 Sightline with existing towers#1 ExistingSimplified survey drawing <strong>of</strong> theexisting arrangement showing (inred) the current main stage areawith its centre line and the centreline <strong>of</strong> the auditorium as defined bythe (<strong>of</strong>f centre) aisle#2Aligning stage and auditoriumThis drawing, based as above on a possiblepreferred layout by the <strong>design</strong> team showsthe impact <strong>of</strong> aligning the centre line <strong>of</strong> thenew stage (in red) with the centre line <strong>of</strong> thenew auditorium.This is not feasible without substantialexcavation <strong>of</strong> the existing cliff on stage left/house right and this may be considered aradical (and expensive) action and a lowerpriority than others within the overall level<strong>of</strong> the expenditure likely.Development <strong>of</strong> the above now with lightingtowers (in red) in the downstage corners (inthe position used by WA Ballet) and theeffect on sightlines <strong>of</strong> the extreme seats.This reconfirms the view that the extremesightline from the new seats on houseleft/stage right are obstructed by thelighting tower to a more significant extentthan on stage left.However, the horizontal sightline is alsoaffected by the position <strong>of</strong> the side maskingwhich is explored later in drawing #6.#4 Moving the downstage towers outFurther development to explore the impacton the sightlines <strong>of</strong> moving the downstagelighting towers out from 19m to 23m. It canbe seen that there is no issue on stageleft/house right and arguably sufficientimprovement on stage right/house left.This option would require re<strong>design</strong> <strong>of</strong> thelighting truss system but the adjustmentsare feasible but nevertheless should bediscussed with the WA Ballet beforeirrevocable decisions are takenThis option, with the assumption about thestage lighting towers (FOH towers cannot belocated until the seating settles but theyshould follow the splayed line <strong>of</strong> thoseshown here) restores the possibility that thestage could be slightly angled, not in orderto align centre lines but to improve the stageright sightline further. This is explored in thenext drawing.#5 As above with slight stage orientationThis takes the above version in #4, existingstage but with splayed lighting towersdownstage, and rotates the whole to movethe downstage right tower out <strong>of</strong> the houseleft sightline, this produces good resultswithout detriment to the stage left/houseright sightline.As before this is a matter for valuemanagement but it is the downstage portion<strong>of</strong> the stage and the towers which need tochange not the whole structure. (Notwithstanding earlier comments about publicaccess on stage and a crossover).#6 The sightline corridorThe WA Ballet has indicated that they mask the stage to anopening <strong>of</strong> 15m. At this width the parallel blue lines indicate thearea <strong>of</strong> the auditorium within this width and therefore enjoyingthe best sightlines. Effectively there are more seats within thiscorridor in the new seating arrangement than in the current.However, the angled blue lines indicate the view from theextreme seats, a position which deteriorates (as it currently does)the closer the extreme seats are to the stage.It should be noted that at His Majesty’s Theatre there are 38% <strong>of</strong>seats outside the proscenium width in the stalls and 60% <strong>of</strong> seatsin the circle outside the proscenium width corridor.It may be that, if <strong>of</strong>fstage public access can be addressed at theQuarry the WA Ballet might consider widening the downstageopening to address this matter.CDRAFT24/09/12QUARRY AMPHITHEATRE0 10 20 50 100QUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTNOVEMBER <strong>2012</strong> REVISION BPG 77


3CDRAFTQUARRY AMPHITHEATRE24/09/120QUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTEXISTING PLAN556+2 DISABLE SPACES10 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 78


3310261354CDRAFTQUARRY AMPHITHEATRE24/09/120QUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTOPTIMAL SIGHTLINES925 SPACES10 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 79


3FIXED SEATINGPLAT DEPTH 1000MMFIXED SEATINGPLAT DEPTH 1000MMEXISTINGAV PLAT DEPTH 1800CQUARRY AMPHITHEATREDRAFT24/09/12QUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTPLAN DIAGRAM0 10 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 80


3FIXED SEATINGPLAT DEPTH 1000MMFIXED SEATINGPLAT DEPTH 1000MM01 SECTIONEXISTINGPLAT DEPTH VARIEDFIXED SEATINGPLAT DEPTH 1000MMKEY PLAN02 SECTIONFIXED SEATINGPLAT DEPTH 1000MM01 SECTION NEW UPPER & LOWERSEATING 20 ROWSEXISTINGFIXED SEATINGPLAT DEPTH 1000MMC02 SECTION EXISTING PLATS & NEW LOWERSEATING 16 ROWSQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT DRAFT24/09/12SECTIONAL DIAGRAM0 10 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 81


3CQUARRY AMPHITHEATRE DRAFTQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT24/09/120SECTION 01EXISTING PLATS & NEW LOWER SEATINGNOVEMBER <strong>2012</strong> REVISION BPG 8210 20 50 100


3CQUARRY AMPHITHEATREDRAFT24/09/12QUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT0SECTION 02NEW UPPER PLATS & NEW LOWER SEATINGNOVEMBER <strong>2012</strong> REVISION BPG 8310 20 50 100


TO STAGE3TO BOHPUBLIC BOUNDARYTO PARKINGEXISTING BUILDING261NEW SANITARYFACILITIES414STAGE 1• Rectification to stage works, lighting.• The works to the stage will include a re orientation <strong>of</strong> thestage as per the attached diagrams• Re seating <strong>of</strong> the lower part <strong>of</strong> the existing seating bowl toprovide atleast an additional 100 seats• New toilets to meet BCA requirements – we will provideC• Ramp system to connect BOH to FOH• Stage Lift and storage• New carpark markingQUARRY AMPHITHEATREDRAFTQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT24/09/12STAGE 10 10 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 84


TO STAGE3TO BOHSHARED PATHWAYSPUBLIC BOUNDARYTO PARKING NEW FOH310261354NEW CONTROLROOMStage 2• New seating bowl into the quarry wall to provide additionalseating• Relocation <strong>of</strong> Control Room to rear <strong>of</strong> seating, new toiletsand FOH• Power upgrade – refer Aurecon report• Sewer and water upgrade – refer Aurecon reportCQUARRY AMPHITHEATREDRAFTQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT24/09/12STAGE 20 10 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 85


TO STAGE3TO BOHSHARED PATHWAYS NEW CONNECTIONSPICNIC AREAPUBLIC BOUNDARYTO PARKINGNEW FOH310261354NEW CONTROLROOMStage 3• New picnic areas to banked areas as per Hames Sharleyconcept• New walkways and pathways to connect to road and rampsystem• Additional <strong>of</strong>f street parking and lighting to increase overallcarparking capacityCQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT DRAFT24/09/12ALL STAGES0 10 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 86


3CQUARRY AMPHITHEATREDRAFT24/09/120QUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORT10 20 50 100NOVEMBER <strong>2012</strong> REVISION BPG 87


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTDRAFT24/09/12NOVEMBER <strong>2012</strong> REVISION BPG 880 10 20 50 100


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTDRAFT24/09/12NOVEMBER <strong>2012</strong> REVISION BPG 890 10 20 50 100


3CQUARRY AMPHITHEATREQUARRY AMPHITHEATRE CONCEPT MASTERPLAN REPORTDRAFT24/09/12NOVEMBER <strong>2012</strong> REVISION BPG 900 10 20 50 100