Course Material of ESDP on Food Processing in Hindi + English
Course Material of ESDP on Food Processing in Hindi + English Course Material of ESDP on Food Processing in Hindi + English
7. The rate quoted in respect
10-11 30 Trial Production11-12 15 CommercialProduction227 days 309 days____________VI. Technical Aspecta. Manufacturing Process:The protein rich biscuits can be manufactured after obtaining Raw
- Page 25 and 26: y/kq m|ksxksa esa dEI;wVj ,oa lwpuk
- Page 27 and 28: vkbZ- ,l- vks- -9000orZeku le; esa
- Page 29 and 30: &&lqj{kk ,oa LokLF; dh lEHkkoukvksa
- Page 31 and 32: fu;kZrd dSls cusafu;kZr gsrq opuc)r
- Page 33 and 34: fu;kZr dks ljy cukuk ek=k HkkM+k Qk
- Page 35 and 36: CLASSIFICATION OF FOOD ON THE BASES
- Page 37 and 38: CHARECTERISTICS OF FEW POPULAR FRUI
- Page 39 and 40: FOOD PACKAGINGWHAT ?“ -AN INTEGRA
- Page 41 and 42: PACKAGE FOR FOOD PRODUCTS1. TIN PLA
- Page 43 and 44: FLOW CHART FOR THE PREPARATION OF G
- Page 45 and 46: FLOW CHART FOR THE PREPARATION OF M
- Page 47 and 48: FLOW CHART FOR THE PREPARATION OF M
- Page 49 and 50: FLOW CHART FOR THE PREPARATION OF P
- Page 51 and 52: 6. Copperm brass or iron equipments
- Page 53 and 54: THE FIRST SCHEDULEFrom ‘A’See c
- Page 55 and 56: provides springboard from the prese
- Page 57 and 58: There are many ways in which one ca
- Page 59 and 60: SALES PROMOTIONAfter the product ha
- Page 61 and 62: PRODUCTION PLANNING & CONTROLProduc
- Page 63 and 64: A PROJECT PROFILE FOR MANUFACTURE O
- Page 65 and 66: 471256810111239Details of</
- Page 67 and 68: has been made in the prof</
- Page 69 and 70: arrangement, collection tank,etc.)
- Page 71 and 72: 6. Consumable 2,000/-7. Sales expen
- Page 73 and 74: X. LIST OF MACHINERY & RAW MATERIAL
- Page 75: II. Market Potential:The per capita
- Page 79 and 80: 6. Oil spraying machine for salted
- Page 81 and 82: VIII.MACHINERY UTILIZATION:It is ex
- Page 83: ISO 9001/14001/HACCP Certification
7. The rate quoted <strong>in</strong> respect <str<strong>on</strong>g>of</str<strong>on</strong>g> mach<strong>in</strong>ery, equipment and raw materials are those prevail<strong>in</strong>g at thetime <str<strong>on</strong>g>of</str<strong>on</strong>g> preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Project Pr<str<strong>on</strong>g>of</str<strong>on</strong>g>ile and are likely to vary from place to place and suppliersto suppliers. When a tailor made project pr<str<strong>on</strong>g>of</str<strong>on</strong>g>ile is prepared, necessary changes are to be made.8. The pay back period may be 5-years after the <strong>in</strong>itial gestati<strong>on</strong> period.9. The gestati<strong>on</strong> period <strong>in</strong> implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the project may be to the tune <str<strong>on</strong>g>of</str<strong>on</strong>g> 6 to 9 m<strong>on</strong>ths which<strong>in</strong>cludes mak<strong>in</strong>g all arrangements, completi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> all formalities, market surveys and tie-ups etc.Once all the above arrangements are made and quality/standards achieved the 100% projectcapacity may be achieved at the end <str<strong>on</strong>g>of</str<strong>on</strong>g> three years. However, a detailed PERT/CPM/chart withimplementati<strong>on</strong> period has been given <strong>in</strong> the report.V. Implementati<strong>on</strong> Schedule:The implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the project <strong>in</strong>cludes various jobs/exercises such as procurement <str<strong>on</strong>g>of</str<strong>on</strong>g> technicalknow how, transfer <str<strong>on</strong>g>of</str<strong>on</strong>g> technology, market surveys and tie-ups, preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> project report, selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g>site, registrati<strong>on</strong>, f<strong>in</strong>anc<strong>in</strong>g <str<strong>on</strong>g>of</str<strong>on</strong>g> project, procurement <str<strong>on</strong>g>of</str<strong>on</strong>g> mach<strong>in</strong>ery and raw materials etc., recruitment <str<strong>on</strong>g>of</str<strong>on</strong>g> staff,erecti<strong>on</strong>/ commissi<strong>on</strong><strong>in</strong>g <str<strong>on</strong>g>of</str<strong>on</strong>g> mach<strong>in</strong>es, trial producti<strong>on</strong> and commercial producti<strong>on</strong> etc. In order to efficientlyand successfully implement the project <strong>in</strong> the shortest period the slack period is curtailed to m<strong>in</strong>imumpossible and as far as possible simultaneous exercises are carried out. In view <str<strong>on</strong>g>of</str<strong>on</strong>g> above a CPM-PERT Charthas been illustrated below, Accord<strong>in</strong>g to which a m<strong>in</strong>imum period <str<strong>on</strong>g>of</str<strong>on</strong>g> 227 days is <strong>in</strong>volved <strong>in</strong> f<strong>in</strong>ally start<strong>in</strong>gthe project <strong>on</strong> commercial basis. By follow<strong>in</strong>g this process a time period <str<strong>on</strong>g>of</str<strong>on</strong>g> 82 days can be saved.4712568101112Details <str<strong>on</strong>g>of</str<strong>on</strong>g> ActivitiesC.P.M.39Activity Days Activity Days Particulars <str<strong>on</strong>g>of</str<strong>on</strong>g> activity1-2 15 1-2 15 Procurement <str<strong>on</strong>g>of</str<strong>on</strong>g> Tech. know how/transfer <str<strong>on</strong>g>of</str<strong>on</strong>g> technology.3-4 15 3-4 15 Market survey, tie up andobta<strong>in</strong><strong>in</strong>g quotati<strong>on</strong>s.4-5 7 2-3 7 Selecti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> site.5-6 70 4-5 7 Preparati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Project report6-7 45 5-6 70 Registrati<strong>on</strong> and f<strong>in</strong>anc<strong>in</strong>g.7-10 30 6-7 45 Placement <str<strong>on</strong>g>of</str<strong>on</strong>g> orders formach<strong>in</strong>ery and receipt <str<strong>on</strong>g>of</str<strong>on</strong>g>mach<strong>in</strong>es.10-11 30 6-8 30 Recruitment <str<strong>on</strong>g>of</str<strong>on</strong>g> staff andtra<strong>in</strong><strong>in</strong>g11-12 15 6-9 30 Additi<strong>on</strong>/Alterati<strong>on</strong> <strong>in</strong>rental premises8-10 15 Procurement <str<strong>on</strong>g>of</str<strong>on</strong>g> raw material/Bought out comp<strong>on</strong>ents7-10 30 Erecti<strong>on</strong>, Electrificati<strong>on</strong> andCommissi<strong>on</strong><strong>in</strong>g74