Work Plan - Final - Maricopa County Department of Transportation
Work Plan - Final - Maricopa County Department of Transportation
Work Plan - Final - Maricopa County Department of Transportation
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
□ Hazardous Materials□ Noise Impacts□ Air Quality□ DocumentationTechnical Memorandum #3 – Conceptual Drainage Report□ Obtain and Review Existing Reports,□ Determine the existing <strong>of</strong>f-site concentration points and flow magnitudes affecting the baselinealignment.□ Contact appropriate agency personnel to identify and summarize past drainage problems, subsidenceand fissure areas.Technical Memorandum #4 –Candidate Alignments and Evaluation□ Schematic Drawings□ Flow Concentration Points□ Preliminary Cost Estimates□ Evaluation <strong>of</strong> <strong>Final</strong> Candidate AlignmentsTechnical Memorandum #5 –Preferred Alignment□ Standard cross section,□ <strong>Plan</strong> view with corridor study centerline, right <strong>of</strong> way lines and drainage features shown on an aerialbase map (1” = 200’ scale unless otherwise directed) and printed on 11” x 17” paper,□ Potential areas requiring additional right-<strong>of</strong>-way,□ Implementation <strong>Plan</strong>,□ Compute 50- and 100-year discharges at drainage crossing locations for the preferred corridoralignment.Draft <strong>Final</strong> Report□ Title Page,□ Table <strong>of</strong> Contents,□ List <strong>of</strong> Figures,□ List <strong>of</strong> Tables,□ Executive Summary□ Existing and future corridor features, including:o Corridor Characteristics (natural/man-made),o Roadway Features,o <strong>Transportation</strong> Network/Travel Demand,o Utilities /Constraints mapping,o Land Use, Ownership and Management,o Environmental summary,o Drainage summary,o Special Analysis Areas,o Relevant <strong>Plan</strong>s/Reports and Guidelines,□ Development and Evaluation <strong>of</strong> Candidate Alignmentso Candidate Alignments and Evaluation Matrix,o Alignment Schematic Drawings,o Conclusions and Recommendations.EPS Group – Quality Assurance <strong>Plan</strong>Hidden Waters Parkway CFS4