09.07.2015 Views

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

□ Hazardous Materials□ Noise Impacts□ Air Quality□ DocumentationTechnical Memorandum #3 – Conceptual Drainage Report□ Obtain and Review Existing Reports,□ Determine the existing <strong>of</strong>f-site concentration points and flow magnitudes affecting the baselinealignment.□ Contact appropriate agency personnel to identify and summarize past drainage problems, subsidenceand fissure areas.Technical Memorandum #4 –Candidate Alignments and Evaluation□ Schematic Drawings□ Flow Concentration Points□ Preliminary Cost Estimates□ Evaluation <strong>of</strong> <strong>Final</strong> Candidate AlignmentsTechnical Memorandum #5 –Preferred Alignment□ Standard cross section,□ <strong>Plan</strong> view with corridor study centerline, right <strong>of</strong> way lines and drainage features shown on an aerialbase map (1” = 200’ scale unless otherwise directed) and printed on 11” x 17” paper,□ Potential areas requiring additional right-<strong>of</strong>-way,□ Implementation <strong>Plan</strong>,□ Compute 50- and 100-year discharges at drainage crossing locations for the preferred corridoralignment.Draft <strong>Final</strong> Report□ Title Page,□ Table <strong>of</strong> Contents,□ List <strong>of</strong> Figures,□ List <strong>of</strong> Tables,□ Executive Summary□ Existing and future corridor features, including:o Corridor Characteristics (natural/man-made),o Roadway Features,o <strong>Transportation</strong> Network/Travel Demand,o Utilities /Constraints mapping,o Land Use, Ownership and Management,o Environmental summary,o Drainage summary,o Special Analysis Areas,o Relevant <strong>Plan</strong>s/Reports and Guidelines,□ Development and Evaluation <strong>of</strong> Candidate Alignmentso Candidate Alignments and Evaluation Matrix,o Alignment Schematic Drawings,o Conclusions and Recommendations.EPS Group – Quality Assurance <strong>Plan</strong>Hidden Waters Parkway CFS4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!