09.07.2015 Views

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EPS QUALITY CONTROL FLOW CHARTSUB-CONSULTANT COORDINATION AND COMMUNICATIONEPS will contact its sub-consultants on a weekly basis to ensure that progress is being made according to theproject schedule. Sub-consultant reports will be subjected to the same QC review process described abovebefore they are submitted to MCDOT.TECHNICAL REVIEWWhere production reviews are for the verification <strong>of</strong> the accuracy and completeness <strong>of</strong> documents, atechnical review is for the assessment <strong>of</strong> the overall design concept <strong>of</strong> the project. A technical review willbe conducted by EPS, MCDOT and the Technical Advisory Committee. As a minimum, the technical reviewprocess should: Determine the adequacy <strong>of</strong> the process used to achieve the desired project goals Determine if all opportunities and constraints have been appropriately identified Determine if all viable alternatives have been considered Determine the practicality <strong>of</strong> the design concept Determine if legal and physical restraints were considered Determine if the design theory, concepts, and project layout are logical Determine if technical specifications are sufficiently comprehensive Determine the constructability <strong>of</strong> the selected designDOCUMENT CONTROLAll documents shall be filed in accordance with the standard departmental filing system (modified to eachproject’s scope). The engineer shall write the specific filing section on the document to be filed.All communications, whether written or verbal, that concern the Scope <strong>of</strong> <strong>Work</strong>, contract conditions,regulatory agency information, etc., should be documented. Documentation should include writtenEPS Group – Quality Assurance <strong>Plan</strong>Hidden Waters Parkway CFS2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!