09.07.2015 Views

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.0 Study Area Definition/Project UnderstandingThe project study area includes the northern section <strong>of</strong> the Hidden Waters Parkway, asshown on the Hassayampa Framework Study, from Interstate 10 (I-10) north to thefuture alignment <strong>of</strong> State Route 74 (SR74). The study area is approximately 28 mileslong and two miles wide (approximately one mile each side <strong>of</strong> the alignment as shownin the Hassayampa Framework Study) except in the area from Northern Avenue to BellRoad were the study area expands to two miles west <strong>of</strong> the alignment and from thesouth end <strong>of</strong> Douglas Ranch to Patton Road were the study area expands to two mileseast <strong>of</strong> the alignment for a total <strong>of</strong> three miles wide in these two areas (refer to Figure 2-1 for graphic depiction <strong>of</strong> study area).Figure 2-1 Hidden Waters Parkway North Study AreaHidden Waters<strong>Final</strong> <strong>Work</strong> <strong>Plan</strong>Corridor Feasibility Study April, 2011<strong>Maricopa</strong> <strong>County</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> 2 EPS Job No. 10-092

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!