09.07.2015 Views

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The Consultant will prepare the corridor Draft and <strong>Final</strong> Reports in generalconformance with the following outline:• Title Page,• Table <strong>of</strong> Contents,• List <strong>of</strong> Figures,• List <strong>of</strong> Tables,• Executive Summaryo Study purpose,o Brief description <strong>of</strong> alignment alternatives, including the preferredalignment evaluation matrix,o Brief description <strong>of</strong> the preferred alignment, planning level estimatedcosts, phasing strategy, and general access management guidelines ifapplicable,o Map(s) depicting the candidate alignment alternatives and the preferredalignment,o Considerations for Future Development,• Existing and future corridor features, including:o Corridor Characteristics (natural/man-made),o Roadway Features,o <strong>Transportation</strong> Network/Travel Demand,o Utilities /Constraints mapping,o Land Use, Ownership and Management,o Environmental summary,o Drainage summary,o Special Analysis Areas,o Relevant <strong>Plan</strong>s/Reports and Guidelines,• Development and Evaluation <strong>of</strong> Candidate Alignmentso Candidate Alignments and Evaluation Matrix,o Alignment Schematic Drawings,o Conclusions and Recommendations.• Preferred Alignmento Standard cross-section,o Design Features,o General Access management guidelines if applicable,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!