• Topography from existing sources,• Facilities (airfields, power plants, waste water plants etc.),• Existing and planned utilities (above/below ground) – including:o Identification and mapping <strong>of</strong> major existing and planned utilities(including private wells) and utility owners within the corridoro Identification and documentation <strong>of</strong> potential conflicts between utilitiesand future corridor improvements,• Recreation trails, parks/areas, greenup areas, and clear zones.1.2.2. Existing Corridor Roadway Conditions – Using existing available data, theConsultant will document the existing roadways including alignment, ADT,roadway width, lanes, surface type, existing pavement condition ratings, yearconstructed, horizontal/vertical alignment, intersection configurations, trafficcontrol, and right-<strong>of</strong>-way.1.2.3. Existing Approved Access Conditions and Policies/Guidelines that address:• Land access – driveways,• Median openings and intersections/interchanges.1.2.4. Existing and Future Roadway Network Information within the study area,including at a minimum:• Future functional classification to be used is an Arizona Parkway,• MCDOT will provide Parkway configurations,• Road improvements programmed as under design or under construction,• <strong>Transportation</strong> networks, circulation elements, and site plans fromDMPs/CMP’s, General <strong>Plan</strong>s, MCDOT plans/studies, and other regional/areastudies as available,• If applicable, traffic reports and impact studies conducted by land developersshould be reviewed,• Travel demand 2030 and build-out projections from the I-10/HassayampaValley Roadway Framework Study (use for implementation plan or phasingplan only). The Consultant will request modeling results from MCDOT andMCDOT will work closely with MAG through the formal request process toacquire modeling results from their regional travel demand model and providethis information to the Consultant. No additional traffic modeling or analysisis required.1.2.5. Land Use, Jurisdictional Control, Ownership, and Managementincluding at a minimum:• Property boundaries from <strong>County</strong> Assessor’s maps, the Town <strong>of</strong> Buckeye, andother jurisdictional agencies,• Existing land use and ownership including:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!