x111Hidden Waters Parkway: Interstate 10 to SR 74Corridor Feasibility Study - Project #TT005Project PartnersArizona Game & Fish DepartmentArizona State Land DepartmentBelmont - LKY Development Company, Inc.El Dorado Holdings – Douglas RanchEPS GroupLogan Simpson DesignMaricopa Association of GovernmentsMaricopa Department of TransportationSnell & Wilmer – Toyota Technical Testing CenterTown of BuckeyeToyota Technical CenterWVSVF I N A L R E P O R TMEETING DATE: November 1 st , 2010Project #: 1025107.96Facilitator: Renee HoekstraRH & Associates, Inc.1
xAttendeesHidden Waters Parkway: Interstate 10 to SR 74Corridor Feasibility Study - Project #TT005222Arizona Game & Fish7200 W. University DriveMesa, AZ 85201 Phone CellKelly Wolff Habitat Program Manager 480-324-3550 602-697-3988kwolff@azgfd.govArizona State Land Department1616 W. Adams StreetPhoenix, AZ 85007 Phone CellGordon Taylor Stakeholder 602-542-2647gtaylor@land.az.govBelmont - LKY Development Company Inc.5040 E. Shea Blvd., Suite 254Scottsdale, AZ 85254Robyn Calihan Manager 480-951-1281 602-315-5474rcalihan@lkydev.comEl Dorado Holdings – Douglas Ranch426 N. 44 th Street, Suite #100Phoenix, AZ 85008Mike Cronin 602-955-2424 602-679-8013mcronin@eldoradoholdings.netEPS Group2045 S. Vineyard, Suite #101Mesa, AZ 85210Darrell Truitt Project Principle 480-503-2250 480-226-9907darrell.truitt@epsgroupinc.comElijah Williams Project Manager 480-503-2250 480-252-7633elijah.williams@epsgroupinc.comMatt Truitt Engineer 480-503-2250 480-529-3174matt.truitt@epsgroupinc.comLogan Simpson Design51 W. Third Street, Suite 450Tempe, AZ 85281Patrick Higgins Environmental Lead 480-967-1343 602-803-2637phiggins@logansimpson.comRH & Associates, Inc.2
- Page 1 and 2: Hidden Waters Parkway NorthCorridor
- Page 3 and 4: AbbreviationsArizona Department of
- Page 5 and 6: 2.0 Study Area Definition/Project U
- Page 7 and 8: 3.0 Key IssuesThe intent of this st
- Page 9 and 10: 3.2 DrainageThe Hidden Waters Corri
- Page 11 and 12: 5.0 Study Process and ApproachThe H
- Page 13 and 14: Figure 5-2 Project ScheduleHidden W
- Page 15 and 16: Arizona Parkway Intersection/Interc
- Page 17 and 18: 8.0 Criteria for Evaluation of Alte
- Page 19: xHiddenWaters Parkway: Interstate 1
- Page 23 and 24: x444AgendaHidden Waters Parkway:Int
- Page 25 and 26: xHiddenProject GoalsWaters Parkway:
- Page 27 and 28: xHiddenTechnical Advisory Committee
- Page 29 and 30: x111Scope of WorkHidden Waters Park
- Page 31 and 32: ContentsStudy Overview ............
- Page 33 and 34: the first step in the development p
- Page 35 and 36: • Topography from existing source
- Page 37 and 38: Product: Technical Memorandum #2 -
- Page 39 and 40: o CAP drainage studies that address
- Page 41 and 42: 3.1. Technical Advisory Committee (
- Page 43 and 44: o Douglas Rancho Toyota Proving Gro
- Page 45 and 46: • Study Purpose/Need,• Study Go
- Page 47 and 48: The Consultant will prepare the cor
- Page 49 and 50: x222Project NotesProject Budget:$50
- Page 51 and 52: Type First Name Last Name Title Com
- Page 53 and 54: HIDDEN WATERS PARKWAY CFS: QUALITY
- Page 55 and 56: verification of verbal conversation
- Page 57: □ Preferred Alignmento Standard c
x111Hidden Waters Parkway: Interstate 10 to SR 74Corridor Feasibility Study - Project #TT005Project PartnersArizona Game & Fish <strong>Department</strong>Arizona State Land <strong>Department</strong>Belmont - LKY Development Company, Inc.El Dorado Holdings – Douglas RanchEPS GroupLogan Simpson Design<strong>Maricopa</strong> Association <strong>of</strong> Governments<strong>Maricopa</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong>Snell & Wilmer – Toyota Technical Testing CenterTown <strong>of</strong> BuckeyeToyota Technical CenterWVSVF I N A L R E P O R TMEETING DATE: November 1 st , 2010Project #: 1025107.96Facilitator: Renee HoekstraRH & Associates, Inc.1