09.07.2015 Views

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8.0 Criteria for Evaluation <strong>of</strong> AlternativesThe alignment alternatives will be objectively reviewed based upon defined evaluationcriteria. These criteria may include but are not limited to:Affected ParcelsConsistency with approved Development/MPC <strong>Plan</strong>sAdditional Right <strong>of</strong> Way Required (sf/acre)Estimated Right <strong>of</strong> Way CostBuildings AffectedConstructability IssuesEngineering ComplexityEnvironmental IssuesPotential Utility ConflictsPublic AcceptabilityFunctionalityAs the study progresses, these criteria will be further refined as additional informationbecomes available. Each alignment will be qualitatively scored based upon theevaluation criteria, and the results will be reviewed by the TAC to determine whichalignment/alignments should be carried forward to preliminary design.8.1 Performance MeasuresIn addition to the alternative evaluation criteria identified in the previous section, thecorridor study will be assessed by the following performance measures:Has the purpose for the project been adequately been met?Have all <strong>of</strong> the stakeholders’ concerns/issues been addressed/mitigated?Are the identified key issues satisfied by the study recommendations?Hidden Waters<strong>Final</strong> <strong>Work</strong> <strong>Plan</strong>Corridor Feasibility Study April, 2011<strong>Maricopa</strong> <strong>County</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> 14 EPS Job No. 10-092

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!