09.07.2015 Views

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

Work Plan - Final - Maricopa County Department of Transportation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.0 Study Process and ApproachThe Hidden Waters Parkway North Study will be divided into two phases (see figure 5-1). Phase I is the planning portion <strong>of</strong> the study. During this phase, technicalmemoranda will be prepared that address parkway corridor features includingenvironmental and drainage overviews.During the second phase <strong>of</strong> the study, candidate parkway alternatives will be developedbased upon the findings <strong>of</strong> Phase I. These alternatives will be objectively evaluated toselect a recommended alignment for further refinement. Preliminary design drawingswill be generated to better evaluate the right-<strong>of</strong>-way and to identify probable drainagefacilities. Phase II will also include a recommended implementation plan for theproposed parkway improvementsFigure 5-1 Study processHidden Waters<strong>Final</strong> <strong>Work</strong> <strong>Plan</strong>Corridor Feasibility Study April, 2011<strong>Maricopa</strong> <strong>County</strong> <strong>Department</strong> <strong>of</strong> <strong>Transportation</strong> 8 EPS Job No. 10-092

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!