- Page 1: JSC-48024-114EVA ChecklistSTS-114 F
- Page 5 and 6: EVA CHECKLISTSTS-114 FLIGHT SUPPLEM
- Page 7: FS 16-9 ...........................
- Page 11 and 12: EMU LiOH CHANGEOUT ................
- Page 13 and 14: FLIGHT SPECIFIC EVA REFERENCE .....
- Page 15 and 16: EVA PREPMIDDECK PREP...............
- Page 17 and 18: (reduced copy)FS CC 4-11 EVA/114/FI
- Page 19 and 20: TIMELINESEVA 1 (TBD) ..............
- Page 21 and 22: EVA 1TBDEVA 1FS 7-3 EVA/114/FIN A
- Page 23 and 24: EVA 2 INHIBIT PADMCSMCC-M1. √FGB
- Page 25 and 26: EVA 2 BRIEFING CARDEV1 - Soichi EV2
- Page 27 and 28: EVA 2 TOOL CONFIGAIRLOCK! Fuse Teth
- Page 29 and 30: EVA 2 EGRESS/SETUP (Cont)IV/RMS EV1
- Page 31 and 32: CMG R & R (Cont)IV/RMS EV1 (SSRMS)
- Page 33 and 34: CMG R & R (Cont)IV/RMS EV1 (SSRMS)
- Page 35 and 36: CLEANUP/INGRESSIV/RMS EV1 EV21. SSR
- Page 37 and 38: EVA 3 INHIBIT PADMCSMCC-M1. √FGB
- Page 39 and 40: EVA 3 BRIEFING CARDEV1 - Soichi EV2
- Page 41 and 42: EVA 3 TOOL CONFIGAIRLOCK! Fuse Teth
- Page 43 and 44: ESPAD INSTALLIV/RMS EV2 (SSRMS)1. I
- Page 45 and 46: ESPAD INSTALL - TASK DATAEstimated
- Page 47 and 48: MISSE 1 AND 2 RETRIEVALIV/RMS EV1 (
- Page 49 and 50: SECONDARY CABLE ROUTINGIV/RMS EV1 (
- Page 51 and 52: ESP2 INSTALLATIONIV/RMS EV1 (FF) EV
- Page 53 and 54: ESP2 FRGF REMOVE AND STOWIV/RMS EV1
- Page 55 and 56: UNSCHEDULED/CONTINGENCY EVA TASKSLF
- Page 57 and 58: LF1 EVA FAILURE WORKAROUND CRIBSHEE
- Page 59 and 60:
LF1 EVA FAILURE WORKAROUND CRIBSHEE
- Page 61 and 62:
LF1 EVA FAILURE WORKAROUND CRIBSHEE
- Page 63 and 64:
LF1 EVA FAILURE WORKAROUND CRIBSHEE
- Page 65 and 66:
LATCH ROEU LATCHESR13LA6UIV1. √MP
- Page 67 and 68:
MATE ROEU ARMIV1. MPLM ROEU DEACT c
- Page 69 and 70:
MANUALLY OPEN/CLOSE CBM PETAL (00:3
- Page 71 and 72:
REMOVE/REPLACE CBM CONTROLLER ASSEM
- Page 73 and 74:
REMOVE/REPLACE MMOD CENTER COVER (0
- Page 75 and 76:
FLIGHT SPECIFIC EVA REFERENCESTS-11
- Page 77 and 78:
STS-114 PAYLOAD BAY LAYOUTFS 18-3 E
- Page 79 and 80:
ESP2 LAUNCH CONFIGURATION (BOTTOM V
- Page 81 and 82:
ACTIVE ESPADEVA HandrailsHandrails3
- Page 83 and 84:
EUTAS COMPLIANT BOLTSFS 18-9 EVA/11
- Page 85 and 86:
EUTASLock BoltEUTAS BoltFS 18-11 EV
- Page 87 and 88:
ESPAD STRUT DEPLOYLength Adjustment
- Page 89 and 90:
ESPAD V-GUIDE CLOSEUPLock Down Bolt
- Page 91 and 92:
ESP2 POWER FROM ESP2 TO ORBITERLaun
- Page 93 and 94:
ESP2 POWER CABLESNode-1P602Primary
- Page 95 and 96:
ESP2 CABLE TIES20” - 37”1.5”R
- Page 97 and 98:
SECONDARY CABLE INSTALL - PANEL A11
- Page 99 and 100:
SECONDARY CABLE ROUTING (Cont)MTS S
- Page 101 and 102:
PASSIVE ESPAD HR LABELS802880278026
- Page 103 and 104:
HR AND WIF LAYOUT (NADIR)FS 18-29 E
- Page 105 and 106:
ESP2 FRGFTether PointEVA BoltHandho
- Page 107 and 108:
CMG NOMENCLATUREFS 18-33 EVA/114/FI
- Page 109 and 110:
AFT Z1 PRE-LAUNCH WITH BLANKETFS 18
- Page 111 and 112:
CMG SHIMS AT Z1FS 18-37 EVA/114/FIN
- Page 113 and 114:
NEW CMG WITH BLANKETFS 18-39 EVA/11
- Page 115 and 116:
CMG SHIMS ON FSEFS 18-41 EVA/114/FI
- Page 117 and 118:
CMG SWAP IN PLBNewOldFS 18-43 EVA/1
- Page 119:
JSC-48024-114FINAL, REV AEVACHECKLI