09.07.2015 Views

EVA Checklist - NASA

EVA Checklist - NASA

EVA Checklist - NASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ESPAD INSTALL (Cont)IV/RMS EV2 (SSRMS)6. SSRMS: On <strong>EVA</strong> GO, maneuver to APFREGRESS/REMOVAL (ROBOTICS FS, <strong>EVA</strong> 3)7. SSRMS: On <strong>EVA</strong> GO, CLEAR STRUCTURE and performESP2 GRAPPLE (ROBOTICS FS, <strong>EVA</strong> 3)23. PGT[A6, CW2, 10.5] –6Ext-7/16: Lock down port EUTASlock bolt to a torque stall24. Open starboard and port V guide latches25. Perform WVS survey of ESPAD! WVS survey complete26. Give SSRMS GO to APFR EGRESS/RECONFIG27. Egress APFR28. Verify A/L toolbox # 2 WIF is [6, GG]29. Tether to APFR, remove from SSRMS30. Stow APFR in A/L Toolbox # 2 WIF[6, PP, C, 12]31. Remove WIF adapter from SSRMS32. Place waist tether on A/L HR, verify hook locked33. Remove safety tether from SSRMS, attach to A/L HR,verify hook locked34. Remove waist tether from A/L HR35. Give SSRMS GO for ESP2 GRAPPLE36. Stow WIF adapter on fuse tether37. Open socket access flap on A/L FRGF thermal cover38. Deploy ESPAD strut and connect to A/L FRGF. Moveslidelocks into locked position (2)39. Close MLI flap around strut and A/L FRGF40. Open nadir V guide latchFS 7-26<strong>EVA</strong>/114/FIN A

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!