09.07.2015 Views

guidelines on variations to a registered pharmaceutical product

guidelines on variations to a registered pharmaceutical product

guidelines on variations to a registered pharmaceutical product

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Guidelines <strong>on</strong> Variati<strong>on</strong>s <strong>to</strong> a Registered Pharmaceutical Product4.3 Annual notificati<strong>on</strong> (AN)Applicants must satisfy themselves that they meet all of the prescribed c<strong>on</strong>diti<strong>on</strong>sfor the change. The change should be summarized as part of the notificati<strong>on</strong> butthe indicated documentati<strong>on</strong> is not required <strong>to</strong> be submitted. The documentati<strong>on</strong>indicated for ANs should be available <strong>on</strong> request or at the time of inspecti<strong>on</strong>.ANs should be submitted <strong>to</strong> NDA within 12 m<strong>on</strong>ths of implementati<strong>on</strong> of thechanges. For c<strong>on</strong>venience applicants may group several AN changes as asingle submissi<strong>on</strong>4.4 Immediate notificati<strong>on</strong> (IN)Applicants must satisfy themselves that they meet all of the prescribed c<strong>on</strong>diti<strong>on</strong>sfor the change and submit all required documentati<strong>on</strong> with the notificati<strong>on</strong>applicati<strong>on</strong>. Such changes can be implemented immediately at the time ofsubmissi<strong>on</strong> and they can be c<strong>on</strong>sidered accepted if an objecti<strong>on</strong> is not issuedby NDA within 30 working days of the date of acknowledgement of receipt of theapplicati<strong>on</strong>.4.5 Minor variati<strong>on</strong> (Vmin)Minor variati<strong>on</strong>s are changes that may have minor effects <strong>on</strong> the overall safety,efficacy and quality of the FPP. Applicants must satisfy themselves that theymeet all of the prescribed c<strong>on</strong>diti<strong>on</strong>s for the change and submit all requireddocumentati<strong>on</strong> with the variati<strong>on</strong> applicati<strong>on</strong>.Such variati<strong>on</strong>s can be implemented if no objecti<strong>on</strong> letter has been issuedwithin 60 working days. Should questi<strong>on</strong>s arise during the specified period, thechange can <strong>on</strong>ly be implemented <strong>on</strong> receipt of a letter of acceptance from NDA.4.6 Major variati<strong>on</strong> (Vmaj)Major variati<strong>on</strong>s are changes that could have major effects <strong>on</strong> the overallsafety, efficacy and quality of the FPP. The documentati<strong>on</strong> required for thechanges included in this reporting type should be submitted. Prior acceptanceby NDA following presentati<strong>on</strong> <strong>to</strong> the Licensing and Amendments ReviewCommittee (LARC) is required before the changes can be implemented. Aletter of acceptance will be issued for all major variati<strong>on</strong>s when the variati<strong>on</strong> isc<strong>on</strong>sidered acceptable. These variati<strong>on</strong>s will be handled within a time period of90 working days.Doc. No.: DAR/GDL/005 Revisi<strong>on</strong> Date: 8 th July 2013 Review Due Date: 16 th July 2016Revisi<strong>on</strong> No.: 1 Effective Date : 16 th July 2013 Page 10 of 70

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!