Guidance for Use of CSM Recommendation - ERA - Europa
Guidance for Use of CSM Recommendation - ERA - Europa
Guidance for Use of CSM Recommendation - ERA - Europa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INDEPENDENT ASSESSMENT<br />
System Definition Review in function<br />
<strong>of</strong> the identified Safety Requirements<br />
HAZARD IDENTIFICATION<br />
AND CLASSIFICATION<br />
HAZARD MANAGEMENT<br />
European Railway Agency<br />
Collection <strong>of</strong> examples <strong>of</strong> risk assessments and <strong>of</strong> some possible tools<br />
supporting the <strong>CSM</strong> Regulation<br />
<br />
PRELIMINARY SYSTEM<br />
DEFINITION<br />
Significant<br />
Change?<br />
YES<br />
SYSTEM DEFINITION<br />
(Scope, Functions, Interfaces, etc.)<br />
RISK ASSESSMENT<br />
HAZARD IDENTIFICATION<br />
(What can happen? When?<br />
Where? How? Etc.<br />
RISK ANALYSIS<br />
HAZARD CLASSIFICATION<br />
(How critical?)<br />
Broadly<br />
Acceptable<br />
Risk?<br />
NO<br />
YES<br />
Selection <strong>of</strong><br />
Risk Acceptance<br />
Principle<br />
CODES OF PRACTICE<br />
Application <strong>of</strong><br />
Codes <strong>of</strong> Practice<br />
SIMILAR REFERENCE<br />
SYSTEM(S)<br />
Similarity Analysis<br />
with Reference<br />
System(s)<br />
EXPLICIT RISK ESTIMATION<br />
Identification <strong>of</strong> Scenarios &<br />
associated Safety Measures<br />
Qualitative<br />
Safety<br />
Criteria?<br />
Quantitative<br />
Estimate<br />
Frequency<br />
Estimate<br />
Severity<br />
Estimate<br />
Risk<br />
Implicit Risk Acceptance Criteria (RAC)<br />
(Conditions to fulfil by CoP & Ref. Syst.)<br />
Comparison<br />
with Criteria<br />
Comparison<br />
with Criteria<br />
Explicit Quantitative or<br />
Qualitative RAC required<br />
Criteria required<br />
RISK EVALUATION<br />
Comparison<br />
with Criteria<br />
NO<br />
Acceptable<br />
Risk?<br />
NO<br />
Acceptable<br />
Risk?<br />
NO<br />
Acceptable<br />
Risk?<br />
YES<br />
YES<br />
YES<br />
Safety Requirements<br />
(i.e. the Safety Measures<br />
to be implemented)<br />
Demonstration <strong>of</strong><br />
Compliance with the<br />
Safety Requirements<br />
Figure 1 : Risk management framework in the <strong>CSM</strong> Regulation {Ref. 3}.<br />
<br />
Reference: <strong>ERA</strong>/GUI/02-2008/SAF Version: 1.1 Page 23 <strong>of</strong> 105<br />
File Name: Collection_<strong>of</strong>_RA_Ex_and_some_tools_<strong>for</strong>_<strong>CSM</strong>_V1.1.doc<br />
European Railway Agency ● Boulevard Harpignies, 160 ● BP 20392 ● F-59307 Valenciennes Cedex ● France ● Tel. +33 (0)3 27 09 65 00 ● Fax +33 (0)3 27 33 40 65 ● http://www.era.europa.eu