European Railway Agency<br />

Collection <strong>of</strong> examples <strong>of</strong> risk assessments and <strong>of</strong> some possible tools<br />

supporting the <strong>CSM</strong> Regulation<br />

<br />

[G 5] The <strong>CSM</strong> must not be applied if a safety related change is not considered to be significant.<br />

But that does not mean that there is nothing to do. The proposer per<strong>for</strong>ms some kind <strong>of</strong><br />

(preliminary) risk analyses to decide whether the change is significant. These risk analyses,<br />

as well as any justifications and arguments need to be documented in order to enable audits<br />

by the NSA. The evaluation <strong>of</strong> the significance <strong>of</strong> a change, and the decision that a change<br />

is not significant, must not be independently assessed by an assessment body.<br />

Article 5. Risk management process<br />

Article 5 (1)<br />

The risk management process described in the Annex I shall apply:<br />

(a) <strong>for</strong> a significant change as specified in Article 4, including the placing in service <strong>of</strong> structural<br />

sub-systems as referred to in Article 2(2)(b);<br />

(b) where a TSI as referred to in Article 2 (2)(a) refers to this Regulation in order to prescribe the<br />

risk management process described in Annex I.<br />

[G 1] Additional explanation is not judged necessary.<br />

Article 5 (2)<br />

The risk management process described in Annex I shall be applied by the proposer.<br />

[G 1] Additional explanation is not judged necessary.<br />

Article 5 (3)<br />

The proposer shall ensure that risks introduced by suppliers and service providers, including<br />

their subcontractors, are managed. To this end, the proposer may request that suppliers and<br />

service providers, including their subcontractors, participate in the risk management process<br />

described in Annex I.<br />

[G 1] Additional explanation is not judged necessary.<br />

Article 6. Independent assessment<br />

Article 6 (1)<br />

An independent assessment <strong>of</strong> the correct application <strong>of</strong> the risk management process described<br />

in Annex I and <strong>of</strong> the results <strong>of</strong> this application shall be carried out by a body which shall meet<br />

the criteria listed in Annex II. Where the assessment body is not already identified by Community<br />

or national legislation, the proposer shall appoint its own assessment body which may be<br />

another organisation or an internal department.<br />

[G 1] The required level <strong>of</strong> independence necessary <strong>for</strong> the assessment body depends on the<br />

safety level that is required <strong>for</strong> the system under assessment. Waiting <strong>for</strong> the harmonisation<br />

<strong>of</strong> this topic, the best practice on this matter can be found in IEC61508-1:2001 Clause 8 or in<br />

<br />

Reference: <strong>ERA</strong>/GUI/02-2008/SAF Version: 1.1 Page 16 <strong>of</strong> 105<br />

File Name: Collection_<strong>of</strong>_RA_Ex_and_some_tools_<strong>for</strong>_<strong>CSM</strong>_V1.1.doc<br />

European Railway Agency ● Boulevard Harpignies, 160 ● BP 20392 ● F-59307 Valenciennes Cedex ● France ● Tel. +33 (0)3 27 09 65 00 ● Fax +33 (0)3 27 33 40 65 ● http://www.era.europa.eu

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!