Annual Report 2012 - Cadogan
Annual Report 2012 - Cadogan
Annual Report 2012 - Cadogan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CHIEF ExECUTIVE’S REVIEW 31 DECEMBER <strong>2012</strong><br />
Developments<br />
Development expenditure rose in <strong>2012</strong>, as compared to<br />
a relatively quiet year in 2011. Total development<br />
expenditure in <strong>2012</strong> was a shade under £20 million and<br />
covered a wide variety of small and medium-size projects.<br />
There was significant activity also in planning and<br />
preparatory work on a number of future schemes, most<br />
notable of which is the redevelopment of Liscartan and<br />
Granville Houses at 127 – 135 Sloane Street.<br />
Major completed projects include the reconfiguration of<br />
the three large retail units at 201 – 206 Sloane Street. Our<br />
work on these units was completed in the autumn and all<br />
three were handed over to their new tenants before the<br />
year end. We completed the major refurbishment of 18<br />
serviced apartments units at 13 – 19 Sloane Gardens<br />
which are subject to a management contract. We also<br />
completed the refurbishment of a number of houses in<br />
Oakley Gardens and the conversion into three flats of a<br />
house in Tedworth Square.<br />
We are also nearing completion of two residential<br />
schemes at 107/109 <strong>Cadogan</strong> Gardens and 21/22 Hans<br />
Place. Completion of the 13 residential units will provide<br />
a substantial boost to the quality of our residential letting<br />
portfolio.<br />
As noted above we have been working hard preparing for<br />
the redevelopment of 127 – 135 Sloane Street. We have<br />
met our original timetable for the commencement of this<br />
development and the site was handed over to the<br />
contractor, Mace, in February of this year. The<br />
development programme envisages completion in the first<br />
half of 2015. Once complete, this scheme will provide<br />
45,000 ft.² of Grade A office space over five floors, and<br />
approximately 50,000 ft.² of retail space, including six<br />
large retail units fronting onto Sloane Street, and a new<br />
restaurant unit on Pavilion Road.<br />
This high quality development will further enhance the<br />
attraction of the Sloane Square area, which has seen the<br />
opening of Café Colbert and Rag and Bone in <strong>2012</strong>, and<br />
where we have a number of other attractive retail lettings<br />
in the pipeline.<br />
8