Research methodology <strong>and</strong> data<br />
project research team (see section 1.2 <strong>for</strong> a description of the research<br />
project). The author of the dissertation was present in 49 of the interviews.<br />
All interviews took place at the case organizations’ premises. In Center <strong>and</strong><br />
Chain, some people were interviewed during both rounds of the interviews,<br />
<strong>and</strong> thus the total number of interviewees was 48. The interviews lasted<br />
between 31 <strong>and</strong> 145 minutes, the average duration being 76 minutes.<br />
Written notes were taken during the interviews, <strong>and</strong> all interviews were<br />
tape-recorded <strong>and</strong> transcribed. In<strong>for</strong>mation on the number of interviews in<br />
each case <strong>and</strong> the <strong>for</strong>mal roles of the interviewees is provided in Table 9.<br />
Table 9 Description of the interviews in each case organization<br />
Number<br />
<strong>and</strong> timing<br />
of<br />
interviews<br />
Interview<br />
duration<br />
Interviewee<br />
roles in the<br />
program<br />
Case Center Case Bureau Case Chain<br />
25 interviews conducted<br />
in two rounds (21<br />
interviewed persons)<br />
Round 1: 10 interviews<br />
during initiation <strong>and</strong><br />
early planning<br />
Round 2: 15 interviews<br />
during later planning<br />
Ranging from 31 to 96<br />
minutes<br />
Average duration<br />
69 minutes<br />
Round 1:<br />
Program manager ,<br />
program coordinator,<br />
six steering group<br />
members (top<br />
managers), a head of a<br />
related subsidiary <strong>and</strong><br />
an expert involved in<br />
program ideation<br />
Round 2:<br />
Program manager,<br />
seven steering group<br />
members, an expert<br />
involved in program<br />
communications,<br />
five peripheral program<br />
participants <strong>and</strong><br />
an expert involved in<br />
program ideation<br />
11 interviews<br />
conducted in one<br />
round, during early<br />
implementation (11<br />
interviewed persons)<br />
Ranging from 44 to<br />
118 minutes<br />
Average duration<br />
75 minutes<br />
Former program<br />
manager, four unit<br />
managers from<br />
related units, two<br />
project managers,<br />
a support group<br />
manager <strong>and</strong> three<br />
project participants<br />
22 interviews conducted<br />
in two rounds (16<br />
interviewed persons)<br />
Round 1: 12 interviews<br />
during initiation <strong>and</strong><br />
planning<br />
Round 2: 10 interviews<br />
during early<br />
implementation<br />
Ranging from 35 to 145<br />
minutes<br />
Average duration<br />
82 minutes<br />
Round 1:<br />
Program coordinator,<br />
chairman of the program<br />
steering group,<br />
two steering group<br />
members, five subprogram<br />
managers,<br />
two project managers <strong>and</strong><br />
an expert involved in<br />
program communications<br />
Round 2:<br />
Program manager (<strong>for</strong>mer<br />
program coordinator),<br />
new chairman of the<br />
program steering group,<br />
three steering group<br />
members, three subprogram<br />
managers,<br />
a project manager <strong>and</strong><br />
an expert involved in<br />
program communications<br />
The interviews were guided by semi-structured interview outlines, meaning<br />
that there was a predefined agenda <strong>for</strong> the interviews, but there was still<br />
room <strong>for</strong> flexibility to emphasize certain themes, based on the interviewee’s<br />
knowledge <strong>and</strong> perspective. At the beginning of each interview, the focus<br />