Thermal Solutions Boiler Controller To Building Automatio
Thermal Solutions Boiler Controller To Building Automatio
Thermal Solutions Boiler Controller To Building Automatio
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Thermal</strong> <strong>Solutions</strong> ProtoNode Startup Guide Page 21 of 32<br />
Appendix A.2. LED Diagnostics for Modbus RTU Communications between the ProtoNode and the TSBC<br />
Please see the diagram below for LED Locations<br />
A.2.1 ProtoNode RER LEDs<br />
A.2.2 ProtoNode LER Main Board LEDs<br />
Note: The lid on top of the ProtoNode has to be removed in order to see the LED’s. Pull on the lid while<br />
holding the on to the 6 pin Phoenix connector. Please do not hold the wall mount tabs as these are designed<br />
to break off if not required!<br />
RTC<br />
RUN<br />
ERR<br />
RX<br />
TX<br />
PWR<br />
Light<br />
RTC<br />
RUN<br />
ERR<br />
RX<br />
TX<br />
PWR<br />
Description<br />
Unused<br />
The RUN LED will start flashing 20 seconds after power indicating normal operation.<br />
The SYS ERR LED will go on solid 15 seconds after power up. It will turn off after 5 seconds. A steady<br />
red light will indicate there is a system error on the ProtoNode LER. If this occurs, immediately report the<br />
related “system error” shown in the error screen of the RUI interface to FieldServer Technologies for<br />
evaluation.<br />
The RX LED will flash when a mesTSBC is received on the socket port.<br />
The TX LED will flash when a mesTSBC is sent on the socket port.<br />
This is the power light and should show steady green at all times when the ProtoNode LER is powered.<br />
ProtoCessor 1991 Tarob Court Milpitas, California 95035 USA Web: www.protocessor.com<br />
Tel: (408) 964 4444 Fax: (408) 964 4425 <strong>To</strong>ll Free: (800) 317 8319 x141 email: support@protocessor.com