Anatomy <strong>of</strong> a Construction Defect Case<br />
continued from page 9<br />
In the case <strong>of</strong> intrusive testing for structural defects, the<br />
following process should be explained to the homeowner:<br />
1. Carpets will be covered in plastic for protection.<br />
2. All the furniture will moved and covered with plastic.<br />
3. The walls will be cut and inspected.<br />
4. Structural drywall repairs will be made that day, and<br />
an appointment will be made for texturing the walls.<br />
5. The next day, painting will be completed.<br />
6. Furniture will be returned to original positions.<br />
7. If necessary, the process will be redone until the<br />
homeowner is satisfied.<br />
It is vital that homeowners understand this process<br />
to avoid surprises. Watching a crew cut into a wall to<br />
inspect plumbing, wiring, or wall-stud spacing can be a<br />
shock unless the legal assistant exercises great care in<br />
preparing the homeowner.<br />
Expert Reports: The experts then provide a written report<br />
<strong>of</strong> their findings. The information is entered into the database<br />
prepared by the legal assistant to become a continued reference.<br />
In some states, expert witness discovery is non-privileged,<br />
meaning that even letters written by counsel are discoverable.<br />
Great care should be taken in all expert communication.<br />
Filing & Service<br />
If the pre-litigation process did not yield the desired<br />
results in settling the case and a lawsuit is filed, the paralegal<br />
on the plaintiff’s side begins work on identifying whom to<br />
name in the case. A corporate search should be performed to<br />
identify the entities and solvency <strong>of</strong> the<br />
sub-contractors—a suspended corporation<br />
cannot be sued. Service <strong>of</strong> process is made<br />
on each <strong>of</strong> the defendants either through<br />
personal service or by publication.<br />
The defense, as with the plaintiffs, is<br />
busy preparing for cross complaints. The<br />
process for the defense is much the same<br />
as with the plaintiff’s paralegals.<br />
Case Management Orders<br />
Some states do not work with Case<br />
Management Orders (CMOs), but those<br />
that do have an advantage. Large complex<br />
construction defect cases may have hundreds<br />
<strong>of</strong> plaintiffs and defendants, and the<br />
discovery process can be a nightmare if<br />
statutory rules are followed. The following<br />
items are usually listed in the CMO with<br />
the dates they are due:<br />
1. Request for production <strong>of</strong> documents<br />
a) Includes homeowner documents consisting <strong>of</strong><br />
complaints, escrow documents etc.<br />
b) Includes the insurance questionnaire for the<br />
defendants and all associated documents such as<br />
job files, escrow information, etc.<br />
2. Special interrogatories<br />
3. Request for site inspections (in addition to the<br />
pre-litigation testing)<br />
4. Requests for destructive testing (in addition to the<br />
pre-litigation testing)<br />
5. Mediation scheduling<br />
6. Deposition schedule for homeowners<br />
7. Deposition schedule for defendants<br />
(“Persons Most Knowledgeable”)<br />
8. Deposition schedule for plaintiff’s experts<br />
9. Deposition schedule for defendant’s experts<br />
10. Document depository location and procedures<br />
(includes costs to be shared)<br />
11. Name <strong>of</strong> Special Master and cost sharing<br />
11. Trial readiness meeting (depending upon the state)<br />
12. Date <strong>of</strong> trial (if already set by the time the CMO<br />
is approved).<br />
Document Depositories<br />
& Special Masters<br />
Documentation accumulates very quickly in construction<br />
defect cases. It is not unusual by the end <strong>of</strong> the case to have,<br />
literally, more than a million documents. To save money and<br />
tons <strong>of</strong> paper, each party meets early in<br />
the case (usually before any discovery) to<br />
decide on a location for a document<br />
depository. This depository is usually a<br />
court reporting service or copy service<br />
that acts as a third party and stores all the<br />
documents in a single location.<br />
As specified by the CMO, all documents<br />
are to be deposited by certain<br />
dates. All parties agree upon the language<br />
and dates, and the presiding judge signs<br />
<strong>of</strong>f on it.<br />
Even with the organization <strong>of</strong> a<br />
CMO, there may still be conflicts that<br />
arise between attorneys. For this reason,<br />
a “Special Master” is chosen (and cost<br />
shared) during the case management<br />
phase to handle disputes pertaining to<br />
the discovery process.<br />