16 Governmental and Institutional <strong>Program</strong><br />

This program, in general prescriptive and performance based incentives will reduce the first cost of high<br />

efficiency equipment thereby encouraging the adoption of high efficient equipment in lieu of standard<br />

equipment at the end of the useful life of measures, or as early replacement.<br />

The program also provides support for:<br />

1. The implementation of cost effective, high efficiency non-standard equipment through the<br />

authorized contractor network and traditional channels. Prescriptive and performance based<br />

incentives are intended to buy down the first cost of selected equipment or overall job scopes<br />

including but not limited to lighting, variable speed drives, custom measures, and other energy<br />

efficiency technologies.<br />

2. The implementation of cost effective, high efficiency standard and non-standard measures<br />

through a CSP for local, state and federal buildings, as well as for institutional customers. For<br />

federal facilities that qualify, costs for the implementation are covered under the Federal Energy<br />

Management <strong>Program</strong>; for others, rebates are intended to buy down selected equipment or<br />

overall job scopes.<br />

The Street Lighting measure is offered to municipalities regardless of ownership of the street lights. This<br />

segment of the program will seek-to convert street lights to high pressure sodium. The company will<br />

pursue an LED street light demonstration project as part of this component to test this emerging<br />

technology.<br />

The Traffic Signal measure is another program targeted at local governments. This component of the<br />

program will seek to convert vehicular signals and pedestrian/cycling signals to LED technology.<br />

The Lighting measures component of this program will seek to convert inefficient lighting technology<br />

with energy efficient lighting technologies. The Implementation Provider and/or <strong>Program</strong> Manager will<br />

provide diagnostic assistance, technical support and rebates necessary for Federal, State, Local,<br />

Institutional and Non-Profit to install high-efficiency measure.<br />

16.1 <strong>Program</strong> Updates<br />

There were no changes to this program during PY3.<br />

16.2 Impact Evaluation Gross Savings<br />

The impact evaluation effort is identical to the 'Small Commercial/lndustriai' program's effort.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 94