14.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 14-5.<br />

Table 14-5: Summary of Distributed Generation <strong>Program</strong> Finances<br />

IQ<br />

'($1,000)<br />

PYTD<br />

($1,000)<br />

CPITD<br />

($1,000)<br />

EDC Incentives to Participants $0 $0 $0<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs $0 $o $0<br />

Design & Development $3 $5<br />

Administration' 11 $2 $6 $39<br />

Management^1<br />

Marketing' 31 $2 $2 $3<br />

Technical Assistance $2 $5" $27<br />

Subtotal EDC Implementation Costs $5 $17 $75<br />

EDC Evaluation Costs $1 $1 $1<br />

SWE Audit Costs<br />

Total EDC Costs'" 1 $6 $17 $76<br />

Participant Costs' 51<br />

Total TRC Costs' 61 $6 $17 $76<br />

Total Lifetime Energy Benefits<br />

Total Lifetime Capacity Benefits<br />

Total TRC Benefits' 71<br />

N/A<br />

TRC Ratio 181<br />

N/A<br />

NOTES<br />

Per PUC direction, TRC inputs and calculations are required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 201.1 Total Resource Cost Test<br />

Order approved July 28, 2011. Please see the "<strong>Report</strong> Dejinitions" section ofthis report for more, details.<br />

[11 Includes the administrative CSP (rebate processing),.tracking system, and general administration and clerical cost.<br />

[2| Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />

[31 Includes the marketing CSP and marketing costs by program CSPs.<br />

W Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

[5| Per the 2011 Total Resource Cost Test Order, the net Participant Costs are the costs for the end-use customer.<br />

[61 Total TRC Costs includes EDC Evaluation Costs, Total EDC Implementation Costs and Participant Costs.<br />

[71 Total TRC Benefits equals the sum of Total Lifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified gross kWh and ftW<br />

savings. Benefits include; avoided supply cosls, including the reduction in cosis of electric energy, generation, transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />

[1QJ TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 90