13.4 Process Evaluation<br />

This program was not implemented in PY3.<br />

13.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 13-5.<br />

Table 13-5: Summary of Customer Resources Demand Response <strong>Program</strong> Finances<br />

IQ<br />

($1,000)<br />

PYTD<br />

($1,000)<br />

CPITD<br />

($1,000).<br />

EDC Incentives to Participants $0 $0 $0<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs $0 $0 $0<br />

Design & Development $4 $7<br />

Administration' 1 ' $13 $51 $83<br />

Management' 21<br />

Marketing 131 $0 $47" * $49<br />

Technical Assistance $3 $352 $374<br />

Subtotal EDC Implementation Costs $17 $454 $512<br />

EDC Evaluation Costs $4 $8 $20<br />

SWE Audit Costs<br />

Total EDC Costs'" 1 $22 $462 $533<br />

Participant Costs' 51<br />

Total TRC Costs' 6 ' $22 $462 $533<br />

Total Lifetime Energy Benefits<br />

Total Lifetime Capacity Benefits<br />

Total TRC Benefits 171<br />

N/A<br />

TRC Ratio' 81<br />

N/A<br />

NOTES<br />

Per PUC direction, TRC inputs and calculations are required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total Resource Cast Test<br />

Order approved July 28, 2011. Please see the "<strong>Report</strong> Definitions" section of this report for more details.<br />

\1\ Includes the administrative CSP (tebate processing), tracking system, and general administration and clerical cost.<br />

|2| Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />

|31 Includes the marketing CSP and marketing costs by program CSPs.<br />

[41 Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

[5| Per the 2011 Total Resource Cost Test Order, the net.Participant Costs are the costs for the end-use customer.<br />

[6| Total TRC Costs includes EDC Evaluation Costs, Total.EDC Implementation Costs and Participant Costs.<br />

[7| Total TRC Benefits equals the sum of TotaLLifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified gross kWh and kW<br />

savings. 'Benefits, inciude: avoided supply costs, including the reduction in costs of electric energy, generation, transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />

[101 TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 87