West Penn Power AMENDED Program Year 3 Final Annual Report
West Penn Power AMENDED Program Year 3 Final Annual Report
West Penn Power AMENDED Program Year 3 Final Annual Report
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
13.4 Process Evaluation<br />
This program was not implemented in PY3.<br />
13.5 Financial <strong>Report</strong>ing<br />
A breakdown of the program finances is presented in Table 13-5.<br />
Table 13-5: Summary of Customer Resources Demand Response <strong>Program</strong> Finances<br />
IQ<br />
($1,000)<br />
PYTD<br />
($1,000)<br />
CPITD<br />
($1,000).<br />
EDC Incentives to Participants $0 $0 $0<br />
EDC Incentives to Trade Allies<br />
Subtotal EDC Incentive Costs $0 $0 $0<br />
Design & Development $4 $7<br />
Administration' 1 ' $13 $51 $83<br />
Management' 21<br />
Marketing 131 $0 $47" * $49<br />
Technical Assistance $3 $352 $374<br />
Subtotal EDC Implementation Costs $17 $454 $512<br />
EDC Evaluation Costs $4 $8 $20<br />
SWE Audit Costs<br />
Total EDC Costs'" 1 $22 $462 $533<br />
Participant Costs' 51<br />
Total TRC Costs' 6 ' $22 $462 $533<br />
Total Lifetime Energy Benefits<br />
Total Lifetime Capacity Benefits<br />
Total TRC Benefits 171<br />
N/A<br />
TRC Ratio' 81<br />
N/A<br />
NOTES<br />
Per PUC direction, TRC inputs and calculations are required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total Resource Cast Test<br />
Order approved July 28, 2011. Please see the "<strong>Report</strong> Definitions" section of this report for more details.<br />
\1\ Includes the administrative CSP (tebate processing), tracking system, and general administration and clerical cost.<br />
|2| Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />
|31 Includes the marketing CSP and marketing costs by program CSPs.<br />
[41 Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />
[5| Per the 2011 Total Resource Cost Test Order, the net.Participant Costs are the costs for the end-use customer.<br />
[6| Total TRC Costs includes EDC Evaluation Costs, Total.EDC Implementation Costs and Participant Costs.<br />
[7| Total TRC Benefits equals the sum of TotaLLifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified gross kWh and kW<br />
savings. 'Benefits, inciude: avoided supply costs, including the reduction in costs of electric energy, generation, transmission, and distribution<br />
capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />
[101 TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />
<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 87