Table 13-2: Customer Resources Demand Response <strong>Program</strong> Sampling Strategy for PY3<br />
Stratum<br />
Customer<br />
Resources<br />
Demand<br />
Response<br />
<strong>Program</strong><br />
Total<br />
Strata<br />
Boundaries<br />
Population<br />
Size<br />
Assumed<br />
Coefficient<br />
of Variation<br />
(Cv) or<br />
Proportion<br />
in Sample<br />
Design<br />
Target<br />
Levels of<br />
Confidence<br />
SePrecision<br />
Target<br />
Sample Size<br />
Achieved<br />
Sample Size<br />
Evaluation Activity<br />
n/a n/a n/a n/a n/a n/a n/a<br />
n/a n/a n/a n/a n/a n/a n/a<br />
i<br />
Table 13-3: PY3 Customer Resources Demand Response <strong>Program</strong> Summary of Evaluation Results for<br />
Energy<br />
Stratum<br />
Customer<br />
Resources<br />
Demand<br />
Response<br />
<strong>Report</strong>ed Gross<br />
Energy Savings<br />
Energy Realization<br />
Rate<br />
Observed<br />
Coefficient of<br />
Variation (C v ) or<br />
Proportion<br />
Relative Precision<br />
Verified Gross<br />
Energy Savings<br />
0 n/a n/a n/a 0<br />
<strong>Program</strong> Total 0 0<br />
Table 13-4: PY3 Customer Resources Demand Response <strong>Program</strong> Summary of Evaluation Results for<br />
Demand<br />
Stratum<br />
Customer<br />
Resources<br />
Demand<br />
Response<br />
<strong>Report</strong>ed Gross<br />
Demand Reduction<br />
Demand<br />
Realization Rate<br />
Observed<br />
Coefficient of<br />
Variation (CJ or<br />
Proportion<br />
Relative Precision<br />
Verified Gross<br />
Demand<br />
Reduction<br />
0.0 n/a n/a n/a 0.0<br />
<strong>Program</strong> Total 0.0 0.0<br />
13.3 Impact Evaluation Net Savings<br />
There were no impacts reported for PY3. The gross impact evaluation effort is underway as of this<br />
writing, but preliminary results are not yet available.<br />
<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 86