30.06.2015 Views

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 12-2: Customer Load Response <strong>Program</strong> Sampling Strategy for PY3<br />

Stratum<br />

Customer<br />

Load<br />

Response<br />

<strong>Program</strong><br />

Total<br />

Strata<br />

Boundaries<br />

population<br />

Size<br />

Assumed<br />

Coefficient<br />

of Variation<br />

(CJ or<br />

Proportion<br />

in Sample<br />

Design<br />

Target<br />

Levels of<br />

Confidence<br />

& Precision<br />

Target<br />

Sample Size<br />

Achieved<br />

Sample Size<br />

Evaluation Activity<br />

n/a n/a n/a n/a n/a n/a n/a<br />

n/a n/a n/a n/a n/a n/a n/a<br />

Table 12-3: PY3 Customer Load Response <strong>Program</strong> Summary of Evaluation Results for Energy<br />

Stratum<br />

Customer<br />

Load Response<br />

<strong>Report</strong>ed Gross<br />

Energy Savings<br />

Energy Realization<br />

Rate<br />

Observed<br />

Coefficient of<br />

Variation (c v ) or<br />

Proportion<br />

Relative Precision<br />

Verified Gross<br />

Energy Savings<br />

0 n/a n/a n/a 0<br />

<strong>Program</strong> Total 0 0<br />

Table 12-4: PY3 Customer Load Response <strong>Program</strong> Summary of Evaluation Results for Demand<br />

Stratum<br />

Customer<br />

Load Response<br />

<strong>Report</strong>ed Gross<br />

Demand Reduction<br />

Demand<br />

Realization Rate<br />

Observed<br />

Coefficient of<br />

Variation (CJ or<br />

Proportion<br />

Relative Precision<br />

Verified Gross<br />

Demand<br />

Reduction<br />

0.0 n/a n/a n/a 0.0<br />

<strong>Program</strong> Total 0.0 0.0<br />

12.3 Impact Evaluation Net Savings<br />

There were no impacts reported for PY3. The net impact evaluation effort is underway as of this writing,<br />

but preliminary results are not yet available.<br />

12.4 Process Evaluation<br />

This program was not implemented in PY3.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!