11.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 11-5.<br />

Table 11-5: Summary of Commercial & Industrial Equipment <strong>Program</strong> - Large Finances<br />

i<br />

IQ<br />

($1,000)<br />

PYTD<br />

($1,000)<br />

CPITD<br />

($1,000)<br />

EDC Incentives to Participants $21 " $1,495 $1,898<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs $21 $1,495 $1,898<br />

Design & Development $6 $667<br />

Administration' 1 ' $2 $122 $567<br />

Management' 2 '<br />

Marketing' 31 $64 $155 $184<br />

Technical Assistance $190 $533 $1,258<br />

Subtotal EDC Implementation Costs $255 $815 $2,676<br />

EDC Evaluation Costs $9 $49 $88<br />

SWE Audit Costs<br />

Total EDC Costs 1 "' $285 $2,359 $4,611<br />

Participant Costs' 51 $0 $4,066 $4,662<br />

Total TRC Costs' 61 $264 $4,930 $7,426<br />

Total Lifetime Energy Benefits $644 $10,245 $12,825<br />

Total Lifetime Capacity Benefits $50- $1,162 $1,471<br />

Total TRC Benefits" 1 N/A $11,407 $14,296<br />

TRC Ratio 18 '<br />

N/A<br />

1.93<br />

2.31<br />

NOTES<br />

Per PUC direction, TRC inputs ond calculations are required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total Resource Cost Test<br />

Order approved July 28, 2011. Please see the "<strong>Report</strong> Definitions" section of this report for more details.<br />

[1] Includes the administrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />

[2] Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />

[3] Includes the marketing CSP and marketing costs by program CSPs.<br />

[4] Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

[5] Per the 2011 Total Rtisource Cost Test Order, the net Participant Costs are the cosls for the end-use customer.<br />

16] Total TRC-Costs includes EDC Evaluation Costs, Total EDCImplcmentntion Costs and Participant Costs.<br />

[7] Total TRG Benefits equals the sum of'Total Lifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified.gross kWh and kW<br />

savings. Benefits include: avoided supply costs, including the reduction in costs of electric energy, generation, transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />

110] TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 81