30.06.2015 Views

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11 CommerciaJ & Industrial Equipment <strong>Program</strong> - Large<br />

This program provides prescriptive and performance based incentives which will reduce the first cost of<br />

high efficiency equipment thereby encouraging the adoption of high efficient equipment in lieu of<br />

standard equipment at the end of the useful life of measures, or as early replacement.<br />

This program also provides support for the implementation of cost effective, high efficiency nonstandard<br />

equipment through the authorized contractor network and traditional channels. Prescriptive<br />

and performance based incentives are intended to buy down the first cost of selected equipment or<br />

overall job scopes including but not limited to lighting, variable speed drives, custom measures, and<br />

other energy efficiency technologies.<br />

11.1 <strong>Program</strong> Updates<br />

There were no changes to this program during PY3.<br />

11.2 Impact Evaluation Gross Savings<br />

This program implements both custom measures and prescriptive measures. The great majority of the<br />

gross reported energy savings for this program were attributable to prescriptive and performance<br />

lighting measures. The M&V methodology for this program is identical to the approach used for the<br />

Small C/l equipment program described in section 11.2.<br />

<strong>Program</strong> Sampling<br />

The sampling methodology for this program is identical to the approach used for the Small C/l<br />

equipment program.<br />

Table 11-1: Commercial & Industrial Equipment <strong>Program</strong> - Large <strong>Report</strong>ed Results by Quarter<br />

<strong>Report</strong>ing Period<br />

PY3 Ql*<br />

PY3<br />

PY3Q3<br />

PY3 Q4<br />

Participants<br />

<strong>Report</strong>ed Gross<br />

Energy Savings<br />

(MWh/yr)<br />

- <strong>Report</strong>ed Gross<br />

Demand Reduction<br />

(MW)<br />

Incentives<br />

($1,000)<br />

13 6,583 1.4 $678<br />

14 12,543 2.3 $302<br />

8 3,356 0.4 $538<br />

7 1,262 0.1 $21<br />

PY3 Total** 37 20,064 3.3 $1,494<br />

CPITD Total** 47 24,544 4.2 $1,898<br />

Note: includes results originally reported under Custom Applications <strong>Program</strong> and Commercial & Industrial Drives <strong>Program</strong>.<br />

"Due to Plan change mid PY3: PY3 and CPITD totals include adjustment for Governmental projects reported under Custom Applications<br />

<strong>Program</strong> and Commercial & Industrial Drives <strong>Program</strong> and moved to Governmental & Institutional <strong>Program</strong> amounting lo PYTD (5) participants,<br />

(3,680) MWh, (0.877) MW and ($45) incentives. CPITD (10) participants, (4,162) MWh, (0.94) MWand ($65) incentives.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 76

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!