10.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 10-6.<br />

Table 10-5: Summary of Time of Use (TOU) with Critical Peak Pricing (CPP) Rate Finances<br />

IQ<br />

($1*0.00)<br />

PYTD<br />

($1,000)<br />

CPITD<br />

($1,000)<br />

EDC Incentives to Participants $o $0 $0.<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs $0 $0 $0<br />

Design & Development $3 $6<br />

Administration' 1 ' $8 $17 $45<br />

Management' 2 '<br />

Marketing' 3 ' $0 $3 $17<br />

Technical Assistance $2 $6 $28<br />

Subtotal EDC Implementation Costs $10 $30 $96<br />

EDC Evaiuation Costs $o $7 $12<br />

SWE Audit Costs<br />

Total EDC Costs'" 1 $10 $37 $108<br />

Participant Costs' 5 '<br />

Total TRC Costs' 6 '<br />

Total Lifetime Energy Benefits<br />

Total Lifetime Capacity Benefits<br />

Total TRC Benefits' 7 '<br />

N/A<br />

TRC Ratio' 81<br />

N/A<br />

NOTES<br />

Per PUC direction, TRC inputs and calculations are required in the <strong>Annual</strong> <strong>Report</strong> only ond should .comply with the 2011 Total Resource Cost Test<br />

Order approved July 28, 2011. Please sea the "<strong>Report</strong> Definitions" section of this report for more details.<br />

[1) Includes the administrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />

[2] Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />

[3] Includes the marketing CSP and marketing costs by program CSPs.<br />

(4) Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

[5] Per the 2011 Total Resource Cost Test Order, the net Participant Costs are the costs for the end-use customer.<br />

[G] Total TRC Costs includes EDC Evaluation Costs, Total EDC Implementation Costs and Participant Costs.<br />

[7) Total TRC Benefits equals the sum of Total Lifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified;Bross kWh and kW<br />

savings. Benefits include: avoided supply costs, including the reduction in costs of electric energy, generation, transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />

[10] TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 75