10.5 Financial <strong>Report</strong>ing<br />
A breakdown of the program finances is presented in Table 10-6.<br />
Table 10-5: Summary of Time of Use (TOU) with Critical Peak Pricing (CPP) Rate Finances<br />
IQ<br />
($1*0.00)<br />
PYTD<br />
($1,000)<br />
CPITD<br />
($1,000)<br />
EDC Incentives to Participants $o $0 $0.<br />
EDC Incentives to Trade Allies<br />
Subtotal EDC Incentive Costs $0 $0 $0<br />
Design & Development $3 $6<br />
Administration' 1 ' $8 $17 $45<br />
Management' 2 '<br />
Marketing' 3 ' $0 $3 $17<br />
Technical Assistance $2 $6 $28<br />
Subtotal EDC Implementation Costs $10 $30 $96<br />
EDC Evaiuation Costs $o $7 $12<br />
SWE Audit Costs<br />
Total EDC Costs'" 1 $10 $37 $108<br />
Participant Costs' 5 '<br />
Total TRC Costs' 6 '<br />
Total Lifetime Energy Benefits<br />
Total Lifetime Capacity Benefits<br />
Total TRC Benefits' 7 '<br />
N/A<br />
TRC Ratio' 81<br />
N/A<br />
NOTES<br />
Per PUC direction, TRC inputs and calculations are required in the <strong>Annual</strong> <strong>Report</strong> only ond should .comply with the 2011 Total Resource Cost Test<br />
Order approved July 28, 2011. Please sea the "<strong>Report</strong> Definitions" section of this report for more details.<br />
[1) Includes the administrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />
[2] Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />
[3] Includes the marketing CSP and marketing costs by program CSPs.<br />
(4) Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />
[5] Per the 2011 Total Resource Cost Test Order, the net Participant Costs are the costs for the end-use customer.<br />
[G] Total TRC Costs includes EDC Evaluation Costs, Total EDC Implementation Costs and Participant Costs.<br />
[7) Total TRC Benefits equals the sum of Total Lifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified;Bross kWh and kW<br />
savings. Benefits include: avoided supply costs, including the reduction in costs of electric energy, generation, transmission, and distribution<br />
capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />
[10] TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />
<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 75