West Penn Power AMENDED Program Year 3 Final Annual Report
West Penn Power AMENDED Program Year 3 Final Annual Report
West Penn Power AMENDED Program Year 3 Final Annual Report
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 10-2: Time of Use (TOU) with Critical Peak Pricing (CPP) Rate Sampling Strategy for PY3<br />
Stratum<br />
Strata<br />
Boundaries<br />
Population<br />
Size<br />
Assumed<br />
Coefficient<br />
of Variation<br />
(CJ or<br />
Proportion<br />
in Sample<br />
Design<br />
Target<br />
Levels of<br />
Confidence<br />
& Precision<br />
Target<br />
Sample Size<br />
Achieved<br />
Sample Size<br />
Evaluation Activity<br />
TOU with<br />
CPP n/a n/a n/a n/a n/a n/a n/a<br />
<strong>Program</strong><br />
Total n/a n/a n/a . n/a n/a n/a n/a<br />
Table 10-3: PY3 Time of Use (TOU) with Critical Peak Pricing (CPP) Summary of Evaluation Results for<br />
Stratum<br />
<strong>Report</strong>ed Gross<br />
Energy Savings<br />
Energy Realization<br />
Rate<br />
Energy<br />
Observed<br />
Coefficient of<br />
Variation (C w ) or<br />
Proportion<br />
Relative Precision<br />
Verified Gross<br />
Energy Savings<br />
TOU with CPP 0 n/a n/a n/a 0<br />
<strong>Program</strong> Total 0 0<br />
Table 10-4: PY3 Time of Use (TOU) with Critical Peak Pricing (CPP) Rate Summary of Evaluation Results<br />
for Demand<br />
Stratum<br />
<strong>Report</strong>ed Gross<br />
Demand Reduction<br />
Demand<br />
Realization Rate<br />
Observed<br />
Coefficient of<br />
Variation (CJ or<br />
Proportion<br />
Relative Precision<br />
Verified Gross<br />
Demand<br />
Reduction<br />
TOU with CPP 0.0 n/a n/a n/a 0.0<br />
<strong>Program</strong> Total 0.0 0.0<br />
10.3 Impact Evaluation Net Savings<br />
This program was not implemented.<br />
10.4 Process Evaluation<br />
This program was not implemented.<br />
<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 74