9.5 Financial <strong>Report</strong>ing<br />
A breakdown of the program finances is presented in Table 9-5.<br />
Table 9-5: Summary of Commercial & Industrial Equipment <strong>Program</strong> - Small Finances<br />
IQ<br />
($1,000)<br />
PYTD<br />
($1,000)<br />
CPITD<br />
($1,000)<br />
EDC Incentives to Participants $1,915 $2,797 $3,285<br />
EDC Incentives to Trade Allies<br />
Subtotal EDC Incentive Costs $1,915 $2,797 $3,285<br />
Design & Development $16 $308<br />
Administration 111 $7 $203 $861<br />
Management 121<br />
Marketing 131 $227 $376 $444<br />
Technical Assistance $370 $791 $1,141<br />
Subtotal EDC Implementation Costs $605 $1,386 $2,754<br />
EDC Evaluation Costs $18 $153 $388<br />
SWE Audit Costs<br />
Total EDC Costs 1,11 $2,538 $4,336 $6,427<br />
Participant Costs 15 ' $1,302 $4,762 $5,593<br />
Total TRC Costs' 61 $1,926 $6,301 $8,735<br />
Total Lifetime Energy Benefits $9,799 $18,437 $25,589<br />
Total Lifetime Capacity Benefits $843 $1,326 $2,135<br />
Total TRC Benefits" 1 N/A $19,762 $27,724<br />
TRC Ratio' 81 N/A 3.14 3.17<br />
NOTES<br />
Per PUC direction, TRC inputs and calculations are required in the <strong>Annual</strong>'<strong>Report</strong> only.and should comply with the 201.1 Total Resource-Cost Test<br />
Order approved My 28, 2011. Please see the"'<strong>Report</strong> Definitions" section of this report for more details.<br />
[1| Includes the administrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />
[2| Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />
[3| Includes the marketing CSP and marketing costs by program CSPs.<br />
14| Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />
[5| Per the 2011 Total Resource Cost Test Order, the net Participant Costs are the costs for the end-use customer. ^<br />
[6| Total TRC Costs includes EDC Evaluation Costs, Total EDC Implementation Costs and Participant Costs.<br />
[71 Total TRC Benefits equals the sunt of Total Lifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified gross kWh and kW<br />
savings. Benefits include: avoided supply costs, incfuding the reduction if) costs of electric energy, generation, transmission, and disiribution<br />
capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />
[10] TRC Ratio equals Total TRC Beneiits divided by Total tRC Costs.<br />