Verification/Data Acquisition (DAQ)<br />

ADM used surveys, on-site verification, and/or data logging in order to address uncertainties identified<br />

in the desk review process. ADM determined the requisite level of additional verification by applying<br />

the following general rule-set:<br />

Measure<br />

On-Site Data<br />

Measure Type Survey<br />

Category<br />

Verification Logging<br />

Prescriptive Lighting • X X*<br />

Prescriptive Motors & Drives X X*<br />

Prescriptive Other X X*<br />

Custom All X X<br />

* As required by the TRM<br />

In this way ADM ensures that enough information was gathered to make accurate and robust site<br />

analyses.<br />

Post DAQ analysis<br />

In order to promote consistency and accuracy, ADM created a Microsoft Excel based calculator for each<br />

prescriptive measure rebated in the program that has a stipulated savings algorithm in the <strong>Penn</strong>sylvania<br />

TRM. Each calculator has one spreadsheet that is used to recreate the claimed savings values by<br />

entering in values according to the rebate application and site documentation during the desk review.<br />

There is a second sheet that is then used to calculate ex post verified savings by updating key<br />

parameters according to on-site data collection. In many cases no changes were made between these<br />

two sheets, as all key variables were identified correctly through the desk review. 25<br />

Custom measures were evaluated according to the EM&V'plan that was written during the desk review<br />

and in accordance with IPMVP. Given the nature of these measures, the custom analyses employed<br />

monitored data, cut-sheets, and one-time power measurements to characterize energy use and energy<br />

savings. For measures installed on equipment used in industrial processes, ADM also collected annual<br />

production data (in addition to any production collected during the monitored time period). This was<br />

used to normalize energy savings to production.<br />

<strong>Program</strong> Sampling<br />

25 This is particularly true for rebates incentivized through the "Non-Standard Lighting for Business" program and<br />

whose connected load reduction was less than SO kW. These rebates usually included itemized invoices) an<br />

itemized list of fixtures and their locations, and fixture cut-sheets. Since the TRM stipulates hours of use by space<br />

type for sites whose connected-load reduction is less than 50 kW, this documentation proved sufficient much of<br />

the time.<br />