algorithms and/or ex ante assumptions (i.e. fixture quantities, motor horse-powers, EFLHs, etc), and<br />
identifying key parameters to be researched on-site. This review informed ADM's fieldwork by<br />
identifying missing data and sites at which ADM needed to install monitoring equipment. The desk<br />
review was also used to flag sites that were claimed using prescriptive algorithms, but whose savings<br />
needed to be calculated using a custom approach. This Is the case for several of 'Motors & Drives'<br />
rebates which were flagged late in the fourth quarter.<br />
Many prescriptive applications with rebate amounts under $10,000 were submitted through the<br />
"Standard Lighting for Business" program component. This program component targeted smaller<br />
rebates and strived to simplify the application process for small commercial applicants who may not<br />
have the required time or skill to fill out a detailed inventory of the lighting projects. At the time of<br />
program design, the 2009 PA TRM was the prevailing guidance document, and Table 12 of" that<br />
"deemed" the baseline fixtures based on the new efficient fixtures. ADM evaluated all sampled<br />
"Standard Lighting for Business" (SLB) projects by applying Appendix C from the 2010 PA TRM and by<br />
determining the baseline fixtures through on-site inspection (post only), site contact interviews, and by<br />
baseline fixture descriptions available in rebate project documentation. The SLB projects tended to<br />
have high verification rates and much of the variability in the realization rates was attributable to<br />
differences between Appendix C of the 2010 TRM and Table 12 of the 2009 TRM. The SLB rebate forms<br />
are being phased out in favor of the "Non-Standard Lighting for Business" rebate forms described below.<br />
The great majority (over 80% of all prescriptive lighting savings in the C/l sector) of lighting projects<br />
were submitted through the "Non-Standard Lighting for Business" (NSLB) program. The NSLB<br />
application process requires the applicant to fill out a version of the Appendix C calculator from the<br />
2010 TRM. As such, these projects generally conformed with TRM-algorithms. Inconsistencies were<br />
limited to discrepancies in EFLH claims and occasionally, usage of 'cut-sheets' for novel lighting<br />
fixtures 2 "* The overall realization rates for the prescriptive lighting measures are near unity across all<br />
three operating companies, indicating that for the most part, results are reported in accordance to TRM<br />
protocols-<br />
For custom projects, desk reviews were performed in order to create an Evaluation, Measurement, &<br />
Verification plan for each sampled site. ADM used the project documentation and site contact to<br />
determine what monitoring equipment needed to be installed and if baseline monitoring was required.<br />
ADM worked closely with SAIC and WPP to identify custom sites at which pre-rnonitoring would be<br />
required by reviewing site documentation for sites early in SAlC's approval process and flagging sites<br />
which would only be evaluable with monitored baseline data. ADM reviewed each Custom Incentive<br />
application before its approval to ensure its evaluabifity.<br />
34<br />
The general guidance used in this impact evaluation is that if one can find a similar fixture in Appendix C with a<br />
connected load within 5% of the proposed fixture, then one should defer to Appendix C.<br />
<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 65