7.5 Financial <strong>Report</strong>ing<br />
A breakdown of the program finances is presented in Table 7-5.<br />
Table 7-5: Summary of Limited Income Energy Efficiency <strong>Program</strong> (LIEEP) Finances<br />
IQ<br />
($1,000)<br />
PYTD<br />
($1,000)<br />
•i<br />
CPITD<br />
($1,000)<br />
EDC Incentives to Participants $829 $4,152 $7,021<br />
EDC Incentives to Trade Allies<br />
Subtotal EDC Incentive Costs $829 $4,152 $7,021<br />
Design & Development $5 $40<br />
Administration' 11 $26 $89 $306<br />
Management' 21<br />
Marketing 131 $2 $6 $17<br />
Technical Assistance $76 $349 $692<br />
Subtotal EDC Implementation Costs $104 $449 $1,056<br />
EDC Evaluation Costs $5 $17 $52<br />
SWE Audit Costs<br />
Total EDC Costs 1 " 1 $938 $4,618 $8,128<br />
Participant Costs' 51 $829 $4,152 $7,021<br />
Total TRC Costs' 61 $938 $4,618 $8,128 .<br />
Total Lifetime Energy Benefits $357 $2,143 $4,512<br />
Total Lifetime Capacity Benefits $24 $153 $307<br />
Total TRC Benefits'" N/A $2,296 $4,819 ,<br />
TRC Ratio' 81 N/A 0.50 0.59<br />
NOTES<br />
Per PUC direction, TRC inputs ond calculations-are required in the Annua! <strong>Report</strong> only and should comply with ihe 2012 Total Resource Cost Test<br />
Order approved July 28, 2031. Please see the "<strong>Report</strong> Definitions" section of this report far more details.<br />
[1| Indudes-the administrative CSP (rebate processing), tracking system, and general administration,and clerical cost.<br />
|21 Inclucies'EDC program management, CSP program.management, general management oversight, and major accounts.<br />
[3]'Includes.the marketing CSP and marketing costs by program CSPs.<br />
[4| Per the 2011 Total Resource Cost Test Order, the Total EDC implementation Costs refer to EDC incurred expenses only.<br />
[51 Per the 2011 Total Resource Cost Test Ordor, the net Participant Costs are the costs for the end-use customer.<br />
[G] Total TRC Costs includes EDC Evaluation Costs, Total EDC Costs and Participant Costs.<br />
[7] Total TRC Benefits.equal? the sum of Total Lifetime Energy.Benefits and Total Lifetime Capacity Benefits. Based upon verified gross'kWh and kW<br />
savings. Benefits include: avoided supply costs, including the reduction in .costs of electric energy, .generation, transmission, and distribution<br />
capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />
[10] TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />
<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 57