7.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 7-5.<br />

Table 7-5: Summary of Limited Income Energy Efficiency <strong>Program</strong> (LIEEP) Finances<br />

IQ<br />

($1,000)<br />

PYTD<br />

($1,000)<br />

•i<br />

CPITD<br />

($1,000)<br />

EDC Incentives to Participants $829 $4,152 $7,021<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs $829 $4,152 $7,021<br />

Design & Development $5 $40<br />

Administration' 11 $26 $89 $306<br />

Management' 21<br />

Marketing 131 $2 $6 $17<br />

Technical Assistance $76 $349 $692<br />

Subtotal EDC Implementation Costs $104 $449 $1,056<br />

EDC Evaluation Costs $5 $17 $52<br />

SWE Audit Costs<br />

Total EDC Costs 1 " 1 $938 $4,618 $8,128<br />

Participant Costs' 51 $829 $4,152 $7,021<br />

Total TRC Costs' 61 $938 $4,618 $8,128 .<br />

Total Lifetime Energy Benefits $357 $2,143 $4,512<br />

Total Lifetime Capacity Benefits $24 $153 $307<br />

Total TRC Benefits'" N/A $2,296 $4,819 ,<br />

TRC Ratio' 81 N/A 0.50 0.59<br />

NOTES<br />

Per PUC direction, TRC inputs ond calculations-are required in the Annua! <strong>Report</strong> only and should comply with ihe 2012 Total Resource Cost Test<br />

Order approved July 28, 2031. Please see the "<strong>Report</strong> Definitions" section of this report far more details.<br />

[1| Indudes-the administrative CSP (rebate processing), tracking system, and general administration,and clerical cost.<br />

|21 Inclucies'EDC program management, CSP program.management, general management oversight, and major accounts.<br />

[3]'Includes.the marketing CSP and marketing costs by program CSPs.<br />

[4| Per the 2011 Total Resource Cost Test Order, the Total EDC implementation Costs refer to EDC incurred expenses only.<br />

[51 Per the 2011 Total Resource Cost Test Ordor, the net Participant Costs are the costs for the end-use customer.<br />

[G] Total TRC Costs includes EDC Evaluation Costs, Total EDC Costs and Participant Costs.<br />

[7] Total TRC Benefits.equal? the sum of Total Lifetime Energy.Benefits and Total Lifetime Capacity Benefits. Based upon verified gross'kWh and kW<br />

savings. Benefits include: avoided supply costs, including the reduction in .costs of electric energy, .generation, transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />

[10] TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 57