6.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 6-5.<br />

Table 6-5: Summary of Residential Critical Peak Rebate (CPR) <strong>Program</strong> Finances<br />

IQ<br />

($1,000)<br />

PYTD<br />

($1,000)<br />

CPITD<br />

($1,000)<br />

EDC Incentives to Participants $0 $0 $0<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs $0 $0 $0<br />

Design &. Development -$4 $6<br />

Administration' 11 $8 $43 $72<br />

Management 121<br />

Marketing 131 $12 $126 $179<br />

Technical Assistance $4 $11 $32<br />

Subtotal EDC Implementation Costs $24 $184 $289<br />

EDC Evaluation Costs $2 $10 $17<br />

SWE Audit Costs<br />

Total EDC Costs 141 $26 $195 $306<br />

Participant Costs' 51<br />

Total TRC Costs' 61<br />

Total Lifetime Energy Benefits<br />

Total Lifetime Capacity Benefits<br />

Total TRC Benefits' 71<br />

N/A<br />

TRC Ratio' 81<br />

NOTES<br />

N/A<br />

Per PUC direction, TRC inputs and cakulations.are required^in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total .Resource Cost Test<br />

Order approved July 28, 2011. Please see the "<strong>Report</strong> Definitions"section of this report for rnore.details.<br />

[1] Inciudtjs the administrative CSP (rebcite;processing), tracking system, and general administration and clerical cost.<br />

[2] InctuckiS'EDC program management,.CSP program management, general management oversight, and.major accounts.<br />

[3] Includes the marketing CSP and'marketing costs by program CSPs.<br />

[4]'Per thti 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

[5]'Per the- 2011 Total Resource Cost Test Order, the net Participant Costs are the costs for.the end-use customer.<br />

[G] Total TRC CostS'includes EDC Evaluation Costs, Total EDC implementation Costs and^Partidpant.Costs.<br />

[7j Total TRC Benefits equals the sum-of Totai Lifetime,Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified gross'kWh ahd kW<br />

savings. Benefits include: avoided supply .costs, including the reduction.in costs^of electric energy, generation; transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load.reduction.<br />

[10] TRC Ratioiequals Total TRC Benefits divided.by Total TRC Costs.<br />