5.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 5-5.<br />

Table 5-5: Summary of Residential Home Performance <strong>Program</strong> Finances<br />

IQ<br />

($1,000)<br />

PYTD<br />

($1,000)<br />

CPITD<br />

($1,000)<br />

EDC Incentives to Participants $365 $5,198 $5,744<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs- $365 $5,198 $5,744<br />

Design & Development $8 $135<br />

Administration' 11 $31 $112 $229<br />

Management' 2 '<br />

Marketing' 31 $121 $125 $847'<br />

Technical Assistance $2,010 $3,773 $3,979<br />

Subtotal EDC Implementation Costs $2,162 $4,019 $5,191<br />

EDC Evaluation Costs $11 $72 $155<br />

SWE Audit Costs<br />

Total EDC Costs'" $2,538 $9,290 $11,089<br />

Participant Costs 151 $365 $5,198 $5,744<br />

Total TRC Costs' 61 $2,538 $9,290 $11,089<br />

Total Lifetime Energy Benefits $3,785 $37,654 $41,618<br />

Total Lifetime Capacity Benefits $75 $706 $811<br />

Total TRC Benefits' 71 N/A $38,360 $42,429<br />

TRC Ratio' 81 N/A 4.13 3.83<br />

NOTES<br />

Per PUC direction, TRC inputs and calculations ore required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total Resource Cost Test<br />

Order approved July 28, 2011. Please see the "<strong>Report</strong> Dejinitions" section of this report for more details.<br />

[1] Includes.the administrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />

[2] Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />

13) Includes the marketing CSP and marketing costs by program CSPs.<br />

|4] Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

(5) Per the 2011 Total Resource Cost Test Order, the net Participant Cost;, are the costs for die end-use customer.<br />

[6] Total TRC Costs includes EDC Evaluation Costs, Total EDC Implementation Costs and Participant Costs.<br />

[7] Total TRC Benefits equal;; tho sum of Total Lifetime Energy Benefils and Total Lifetime Capacity Benefits. Based upon verified gross kWh and.kW<br />

savings. Benefits include: avoided supply costs, including the reduction in costs of electric energy, generation, transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />

[10] TRC Ratio equals Total TRC Benefits divided by Total TRC Costs. —'<br />