30.06.2015 Views

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 4-5.<br />

Table 4-5: Summary of Residential Energy Efficient HVAC Equipment <strong>Program</strong> Finances<br />

IQ<br />

($1,000)<br />

PYTD<br />

($1,000)<br />

CPITD<br />

($1,000)<br />

EDC Incentives to'Participants $126 $277 $631-<br />

EDc Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs $126 $277 $631<br />

Design & Development $4 $123 '<br />

Administration 11 ' $3 $22 $133<br />

Management' 21<br />

Marketing' 31 $32 $49 $200<br />

Technical Assistance $67 $123 $258<br />

Subtotal EDC Implementation Costs $103 $198 $715<br />

EDC Evaluation Costs ($4) $31 $99<br />

SWE Audit Costs<br />

Total EDC Costs' 41 $225 $506 $1,444<br />

Participant Costs' 5 ' $338 $338 $1,017<br />

Total TRC Costs' 6 ' $437 $567 $1,830<br />

Total Lifetime Energy Benefits $745 $745 $2,008<br />

Total Lifetime Capacity Benefits $81 $81 $327<br />

Total TRC Benefits' 71 N/A $826 $2,335<br />

TRC Ratio' 81 N/A 1.46 1.28<br />

NOTES<br />

Per f>uc direction, TRC inputs and calculations are required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total Resource Cost Test<br />

Order approved July 28, 2011. Please see the "<strong>Report</strong> Definitions" section of this report for more details.<br />

[11 Iridudes the administrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />

[21 Includes EDGprogram management, CSP program management, general management oversight, and major accounts.<br />

[3] Includes the marketing CSP and marketing costs by program CSPs.<br />

[4] Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

(5) Per the 2011 Total Resource Cost Test Order, the net Participant Cosls are the costs for the end-use customer.<br />

[6] Total TRC Costs includes EDC Evaluation Costs, Total EDC Implementation Costs and Participant Costs.<br />

[71 Total TRC Benefits equals the sum of Total Lifetime Energy Benefits and Total Lifetime Capacity Benefils. Based upon verified gross kWh and kW<br />

savings. Benefits include: avoided supply costs, including the reduction in cosls of electric energy, generation, transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />

[10] TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!