30.06.2015 Views

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

to-Gross data acquisition will be based on participant self-report surveys and will follow a similar<br />

approach as that used for the FirstEnergy legacy companies.<br />

1.6 Summary of Portfolio Finances and Cost-Effectiveness<br />

A breakdown of the portfolio finances is presented in Table 1-6.<br />

Table 1-6: Summary of Portfolio Finances<br />

IQ<br />

($1,000)<br />

PYTD<br />

($1,000)<br />

CPITD<br />

($1,000)<br />

EDC Incentives to Participants $4,211 $16,813 $24,121<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs $4,211 $16,813 $24,121<br />

Design & Development $79 $1,787<br />

Administration' 1 ' $196 $1,117 $3,551<br />

Management' 2 '<br />

Marketing' 3 ' $693 $1,886 $5,085<br />

Technical Assistance $3,093 $7,354 $10,245<br />

Subtotal EDC Implementation Costs $3,982 $10,436 $20,667<br />

EDC Evaluation Costs $79 $552 $1,515<br />

SWE Audit Costs $350 $950 $1,994<br />

Total EDC Costs 1,11 $8,622 $28,750 $48,298<br />

Participant Costs' 5 ' $3,539 $42,081 $53,193<br />

Total TRC Costs' 61 $7,599 $53,068 $75,376<br />

Total Lifetime Energy Benefits $49,473 $121,671 $161,239<br />

Total Lifetime Capacity Benefits $3,340 $7,111 $10,463<br />

Total TRC Benefits' 71 N/A $128,781 $171,702<br />

TRC Ratio' 81 N/A 2AQ<br />

2.43 2.28<br />

NOTES<br />

Per PUC direction, TRC inputs and calculations are required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total Resource Cost Test<br />

Order approved July 28, 2011- Please see the "<strong>Report</strong> Definitions" section of this report for more details.<br />

[1| Includes the nclministrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />

[2] Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />

|3] Includes the marketing CSP and marketing costs by program CSPs.<br />

[4] Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

[5] Per the 2011 Total Resource Cost Test Order, the'net Participant Costs are the costs.for the end-use customer:<br />

|6| Total TRC Costs includes EDC Evaluation Costs, EDC Implementation Costs and Participant Costs.<br />

[7] Total TRC Benefits equals the sum of Total Lifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified gross kWh and kW<br />

savings. Benefits include: avoided supply costs, including the reduction in costs of electric energy, generation, transmission, and distribution<br />

capacity, and natural gas valued at marginal cost for periods when there is a load reduction.<br />

|S] TRC Ratio equals Total TRC Benefits divided by Total TRC Costs.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!