30.06.2015 Views

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 1-5: PYTD Verified Gross Demand Reduction by <strong>Program</strong><br />

<strong>Program</strong><br />

PYTD<br />

<strong>Report</strong>ed<br />

Gross<br />

Demand<br />

Savings<br />

(MW/<strong>Year</strong>)<br />

PYTD<br />

Demand<br />

Realization<br />

Rate<br />

PYTD<br />

Verified<br />

Gross<br />

Demand<br />

Savings<br />

(MW/<strong>Year</strong>)<br />

PYTD<br />

Confidence<br />

PYTD<br />

Achieved<br />

Precision<br />

CPITD<br />

Verified<br />

Gross<br />

Demand<br />

Savings<br />

(MW/<strong>Year</strong>)<br />

Residential Appliance Turn-In <strong>Program</strong> 1,0 77.4% 0.8 90% 8% 1.5<br />

Residential Energy Efficient Products <strong>Program</strong> 2.2 93.2% 2.1 90% 3% 5.7<br />

Residential Energy Efficient HVAC Equipment <strong>Program</strong> 0.5 69.7% 0.3 90% 5% 1.1<br />

Residential Home Performance <strong>Program</strong> 4.8 98,5% 4.8 90% 3% 5.3-<br />

Critical Peak Rebate (CPR) Rate 0.0 n/a 0.0 0 , 0% 0<br />

Limited Income.Energy Efficiency <strong>Program</strong> (LIEEP) • 1.4 80,0% 1.1 90% 6% 2.0<br />

Joint Utility Usage Management <strong>Program</strong> 0.1 93.0% 0.1 90% 8% 0.1<br />

Commercial & Industrial Equipment <strong>Program</strong> - Small 17.6 68.5% « T 2<br />

12.1<br />

90% 0% 14.3<br />

Time of Use (TOU) with Critical Peak Pricing (CPP) Rate 0.0 n/a 0.0 0 0% 0<br />

Commercial & Industrial Equipment <strong>Program</strong> • Large 3.4 104.7% 3.6 90% 0% 4.4<br />

Customer Load Response <strong>Program</strong> 0.0 n/a 0.0 0 0% '0<br />

Customer Resources Demand Response <strong>Program</strong> 0.0 n/a 0.0 0 0% 0<br />

Distributed Generation <strong>Program</strong> 0,0 n/a 0.0 0 0% 0<br />

Conservation Voltage Reduction (CVR) <strong>Program</strong> 0.0 n/a 0.0 0 0% 0<br />

Governmental and Institutional <strong>Program</strong> 10.2 95.4% 40=0<br />

TOTAL PORTFOLIO 41.2 84.4% 34T4'<br />

9.7<br />

34.5<br />

90% 0% ' 13,1<br />

90% 2% 47.4<br />

TOTAL PORTFOLIO INCLUDING LINE LOSSES[l] TBD TBD TBD TBD TBD TBD<br />

NOTES: [1] For cumulative.results, through Plan year 3 demand reductions are at the customer level. <strong>Report</strong>ed results for PY4 will include<br />

the addition of line losses,<br />

1.5 Summary of PY3 Net to Gross Ratios<br />

Per the 2011 TRC Order, EDCs are required to conduct Net-to-Gross (NTG) research. Act 129 compliance<br />

is based on gross savings, but the Company's Evaluators are presently finalizing a portfolio-level net to<br />

gross survey to inform the program planning for Phase II of Act 129. The evaluation of the legacy<br />

FirstEnergy companies included net-to-gross research based on <strong>Program</strong> <strong>Year</strong> 3 (PY3) participants.<br />

Given the mid-year transition of <strong>West</strong> <strong>Penn</strong> <strong>Power</strong> programs to FirstEnergy's model. <strong>West</strong> <strong>Penn</strong> <strong>Power</strong><br />

specific net-to-gross research was not conducted. The evaluation team plans to complete net-to-gross<br />

research on <strong>West</strong> <strong>Penn</strong> <strong>Power</strong> program participants starting in February 2013 and based on six months<br />

of PY4 participants. These results will be available in time to inform the final plans for Phase 11. The Net-<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!