30.06.2015 Views

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The peak demand reduction compliance target for the GNI sector for <strong>West</strong> <strong>Penn</strong> is 16 MW. Based on<br />

CPITD verified gross demand reduction 12 , <strong>West</strong> <strong>Penn</strong> achieved 83 percent of the target. These values are<br />

shown in Figure 1-4.<br />

Figure 1-4: GNI CPITD Peak Demand Reduction 13<br />

Government, Nonprofit, and Industrial Sectors (CPITD)<br />

Demand Impacts<br />

18<br />

16<br />

14<br />

12<br />

14 MW/yr-<br />

92%<br />

13 MWh/yr<br />

83%<br />

16 MW/yr<br />

100%<br />

ro<br />

10<br />

4 -<br />

.'<br />

ii'i''''<br />

, v -<br />

CPITD <strong>Report</strong>ed Gross<br />

CPITD Verified Gross<br />

May 31 2013<br />

Compliance Targets<br />

See the "<strong>Report</strong> Definitions" section for an explanation of how CPITD verified gross savings are calculated.<br />

For cumulative results through Plan year 3, demand reductions are at the customer level. <strong>Report</strong>ed results for<br />

PY4 will include the addition of line losses.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!