The system peak demand reduction 4<br />

compliance target for <strong>West</strong> <strong>Penn</strong> is 157.3 MW per Act 129 and<br />

must be achieved by September 30, 2012. Based on CPITD verified gross demand reduction 5 , <strong>West</strong> <strong>Penn</strong><br />

has achieved 30 percent of the demand reduction compliance target. These figures are shown in Figure<br />

1-2.<br />

Figure 1-2: Portfolio CPITD Peak Demand Reduction 6<br />

180<br />

160<br />

Cumulative Portfolio Inception to Date (CPITD)<br />

Demand Reduction<br />

157 MWh/yr<br />

100%<br />

140<br />

120<br />

2<br />

100<br />

80 -<br />

60<br />

40<br />

56 MW/yr<br />

35% .47 MWh/yr.<br />

30%<br />

•<br />

20<br />

0 T<br />

CPITD <strong>Report</strong>ed Gross<br />

CPITD Verified Gross<br />

May 31 2013<br />

Compliance Targets<br />

Herein, demand reduction refers to the EDC's system peak demand reduction in the EDC's top 100 hours of<br />

highest demand, as defined by the PA PUC and is measured in kW or MW.<br />

5<br />

See the "<strong>Report</strong> Definitions" section for an explanation of how CPITD verified gross savings are calculated.<br />

6<br />

For cumulative results through Plan year 3, demand reductions are at the customer level. <strong>Report</strong>ed results for<br />

PY4 will include the addition of line losses.<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 12