TRC COMPONENTS 1<br />

Administration Costs<br />

Includes the administrative CSP (rebate processing), tracking system, and general administration and<br />

clerical costs.<br />

EDC Costs<br />

Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenditures<br />

only.<br />

Management Costs<br />

Includes the EDC program management, CSP program management, general management oversight and<br />

major accounts.<br />

Participant Costs<br />

Per the 2011 Total Resource Cost Test Order, the net participant costs are the costs for the end use<br />

customer.<br />

Total TRC Costs<br />

Total TRC Costs includes EDC Evaluation Costs, EDC Implementation Costs and Participant Costs.<br />

Total TRC Benefits<br />

Based upon verified gross kWh and kW savings. Benefits include: avoided supply costs, including the<br />

reduction in costs of electric energy, generation, transmission, and distribution capacity, and natural gas<br />

valued at marginal cost for periods when there is a load reduction.<br />

1<br />

All TRC definitions are subject to the 2011 Total Resource Cost Test Order.<br />