West Penn Power AMENDED Program Year 3 Final Annual Report
West Penn Power AMENDED Program Year 3 Final Annual Report
West Penn Power AMENDED Program Year 3 Final Annual Report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
16.5 Financial <strong>Report</strong>ing<br />
A breakdown of the program finances is presented in Table 16-5.<br />
Table 16-5: Summary of Governmental and Institutional <strong>Program</strong> Finances<br />
CateRorv Quarter 4<br />
($000)<br />
PYTD<br />
($000)<br />
CPITD<br />
($000)<br />
EDC Incentives to Participants<br />
EDC Incentives to Trade Allies<br />
Subtotal EDC Incentive Costs<br />
$320 $782 $1,218<br />
$320 $782 $1,218<br />
Design & Development<br />
Administration<br />
$5 $111<br />
$(16) $73 $373<br />
Management 1^1<br />
Marketing . .<br />
$61 $134 $152<br />
Technical Assistance' 11 $79 $208 $328<br />
Subtotal EDC Implementation Costs<br />
$124 $421 $963<br />
EDC Evaluation Costs<br />
SWE Audit Costs<br />
$7 $71 $243<br />
Total EDC Costs 111 $452 $1,274 $2,425<br />
Participant Costs' 41 $119 $20,053 $20,732<br />
Total TRC Costs<br />
$250 . $20,545 $21,938<br />
Total Lifetime Energy Benefits<br />
Total Lifetime Capacity Benefits<br />
Total TRC Benefits<br />
$33,020 $39,406 $43,513<br />
$2,205 $3,092 $3,806<br />
N/A $42,497 $47,319<br />
TRC Ratio N/A 2.07 2.16<br />
NOTES:<br />
Per PUC direction, TRC inputs ond calculations are required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total Resource<br />
Cost Test Order approved July 28, 2011. Please see the "<strong>Report</strong> Definitions" section of this repon for more details.<br />
/I) Includes the administrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />
[2) Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />
[31 Includes the marketing CSP and marketing costs by program CSPs.<br />
(ill.Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />
[5] Per the 2011 Total Resource Cost Test Order, the net Participant Costs are the costs for the end-use customer.<br />
[G] Total TRC Costs.includes EDC Evaluation Costs, EDC Implementation Costs and Participant Costs,<br />
[71 Total TRC Benefits equals the sum of Total Lifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified gross<br />
kwh and kW savings. Benefits include: avoided supply costs, including the reduction in costs of electric energy, generation,<br />
transmission, and distribution capacity, and natural gas valued at marginal cost for periods when there is a load reduction'<br />
[101 TRC Ratio equals Total TRC Benefits divided by Total TRC Costs. •' I<br />
<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 100