30.06.2015 Views

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

16.5 Financial <strong>Report</strong>ing<br />

A breakdown of the program finances is presented in Table 16-5.<br />

Table 16-5: Summary of Governmental and Institutional <strong>Program</strong> Finances<br />

CateRorv Quarter 4<br />

($000)<br />

PYTD<br />

($000)<br />

CPITD<br />

($000)<br />

EDC Incentives to Participants<br />

EDC Incentives to Trade Allies<br />

Subtotal EDC Incentive Costs<br />

$320 $782 $1,218<br />

$320 $782 $1,218<br />

Design & Development<br />

Administration<br />

$5 $111<br />

$(16) $73 $373<br />

Management 1^1<br />

Marketing . .<br />

$61 $134 $152<br />

Technical Assistance' 11 $79 $208 $328<br />

Subtotal EDC Implementation Costs<br />

$124 $421 $963<br />

EDC Evaluation Costs<br />

SWE Audit Costs<br />

$7 $71 $243<br />

Total EDC Costs 111 $452 $1,274 $2,425<br />

Participant Costs' 41 $119 $20,053 $20,732<br />

Total TRC Costs<br />

$250 . $20,545 $21,938<br />

Total Lifetime Energy Benefits<br />

Total Lifetime Capacity Benefits<br />

Total TRC Benefits<br />

$33,020 $39,406 $43,513<br />

$2,205 $3,092 $3,806<br />

N/A $42,497 $47,319<br />

TRC Ratio N/A 2.07 2.16<br />

NOTES:<br />

Per PUC direction, TRC inputs ond calculations are required in the <strong>Annual</strong> <strong>Report</strong> only and should comply with the 2011 Total Resource<br />

Cost Test Order approved July 28, 2011. Please see the "<strong>Report</strong> Definitions" section of this repon for more details.<br />

/I) Includes the administrative CSP (rebate processing), tracking system, and general administration and clerical cost.<br />

[2) Includes EDC program management, CSP program management, general management oversight, and major accounts.<br />

[31 Includes the marketing CSP and marketing costs by program CSPs.<br />

(ill.Per the 2011 Total Resource Cost Test Order, the Total EDC Costs refer to EDC incurred expenses only.<br />

[5] Per the 2011 Total Resource Cost Test Order, the net Participant Costs are the costs for the end-use customer.<br />

[G] Total TRC Costs.includes EDC Evaluation Costs, EDC Implementation Costs and Participant Costs,<br />

[71 Total TRC Benefits equals the sum of Total Lifetime Energy Benefits and Total Lifetime Capacity Benefits. Based upon verified gross<br />

kwh and kW savings. Benefits include: avoided supply costs, including the reduction in costs of electric energy, generation,<br />

transmission, and distribution capacity, and natural gas valued at marginal cost for periods when there is a load reduction'<br />

[101 TRC Ratio equals Total TRC Benefits divided by Total TRC Costs. •' I<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!