30.06.2015 Views

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

West Penn Power AMENDED Program Year 3 Final Annual Report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16.3 Impact Evaluation Net Savings<br />

Act 129 compliance is based on gross savings, but the Company's Evaluators are presently finalizing a<br />

portfolio-level net to gross survey to inform the program planning for Phase II of Act 129. The<br />

evaluatipn of the legacy FirstEnergy companies included net-to-gross research based on <strong>Program</strong> <strong>Year</strong> 3<br />

{PY3) participants. Given the mid-year transition of <strong>West</strong> <strong>Penn</strong> <strong>Power</strong> programs to FirstEnergy's model,<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> specific net-to-gross research was not conducted. The evaluation team plans to<br />

complete net-to-gross research on <strong>West</strong> <strong>Penn</strong> <strong>Power</strong> program participants starting in February 2013 and<br />

based on six months of PY4 participants. These results will be available in time to inform the final plans<br />

for Phase II. The Net-to-Gross data acquisition will be based on participant self-report surveys and will<br />

follow a similar approach as that used for the FirstEnergy legacy companies.<br />

16.4 Process Evaluation<br />

A process evaluation for the WPP program was not conducted in PY3 due to the transition to the<br />

implementation model of the other three operating companies (Met-Ed, Penelec, and <strong>Penn</strong> <strong>Power</strong>).<br />

<strong>West</strong> <strong>Penn</strong> <strong>Power</strong> Company | Page 99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!