Architecture Program Report Tulane University New Orleans ...

Architecture Program Report Tulane University New Orleans ... Architecture Program Report Tulane University New Orleans ...

architecture.tulane.edu
from architecture.tulane.edu More from this publisher
27.06.2015 Views

external relations, with the principal goal being an increase in fundraising. With the goal of both sustaining and increasing fundraising levels substantially beyond the School's historical ability, the Dean of the School of Architecture also takes twelve (12) national trips per year, as well as six (6) regional trips per year. In addition, the School now has a formal Financial Strategic Plan, which seeks to double projected income to the School's annual fund. Gifts to the School have increased substantially and are now nearing the $120,000 mark. This increase is despite the School having been 'open' this past year only for the past few months.

Physical Facilities Another primary concern of the most recent Visiting Team Report was the condition of the Physical Facilities. As determined by the most recent VTR: "Past visiting teams have noted the problems with Richardson Memorial Hall, and some changes have been made and noted. Much, much more needs to be done as the state of the building is now clearly adversely affecting the program and the education Tulane can provide. There are no or limited faculty offices, institutional support space, and modern shop quarters, material lab spaces, mock-up spaces, and spray booths. The studio spaces reflect times past and will not support computer connections and peripherals. Code violations, including the lack of sprinkler systems and ADA violations are rampant. A $10 million building campaign is being devised that should finally allow the school of capitalize on all the many benefits intrinsic to the historic structure. It could not be soon enough. The profession of architecture is exceedingly competitive. The state of the building restricts the school's ability to produce students that can excel in it. The team has no doubts about the university's capacity to resolve the building's problems. In the last several years, the university has built new law, business and medical buildings...As stated in the most recent Visiting Team Report of 2002, significant progress has been made in this area, but there is still some way to go. This is no longer considered a deficiency, certainly not with respect to the studios." Nonetheless, the assumption of further progress was a substantial part of the most recent VTR, and is continuing in the following areas: ● The Capital Campaign continues, with expected funding levels to reach a goal of $8.2 million. After a recent $1.2 million dollar renovation, $600,000 in new funding has been achieved towards the stated goal. There is also a recent $400,000 bequest by an esteemed alumnus of the School. ● As noted, the studios are now fully operational in terms of computer connections and peripherals (all studios feature fully wireless—as well as wired —access to the School's vastly increased networks and servers). With new desks and a new heating, ventilation and air conditioning system, the studios have been fully "modernized" and are now commensurate with the School's peer institutions. Server capacity has been increased, and the School is in the midst of purchasing CNC milling

external relations, with the principal goal being an increase in<br />

fundraising. With the goal of both sustaining and increasing fundraising<br />

levels substantially beyond the School's historical ability,<br />

the Dean of the School of <strong>Architecture</strong> also takes twelve (12)<br />

national trips per year, as well as six (6) regional trips per year. In<br />

addition, the School now has a formal Financial Strategic Plan,<br />

which seeks to double projected income to the School's annual<br />

fund. Gifts to the School have increased substantially and<br />

are now nearing the $120,000 mark. This increase is despite<br />

the School having been 'open' this past year only for the past<br />

few months.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!