23.06.2015 Views

Auer SuccessNG The building blocks - AUER - Die Bausoftware ...

Auer SuccessNG The building blocks - AUER - Die Bausoftware ...

Auer SuccessNG The building blocks - AUER - Die Bausoftware ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Product overview<br />

<strong>Auer</strong> Success NG<br />

<strong>The</strong> <strong>building</strong> <strong>blocks</strong><br />

<strong>The</strong> <strong>building</strong> <strong>blocks</strong>


Product overview<br />

<strong>Auer</strong> Success NG<br />

<strong>The</strong> <strong>building</strong> <strong>blocks</strong><br />

<strong>AUER</strong> Success NG<br />

is a registered trademark of <strong>AUER</strong> – <strong>Die</strong> <strong>Bausoftware</strong> GmbH.<br />

Copyright 2009<br />

<strong>AUER</strong> – <strong>Die</strong> <strong>Bausoftware</strong> GmbH


Content<br />

<strong>AUER</strong> <strong>Bausoftware</strong> – about the company 6<br />

Our foundations are quality and competence 8<br />

<strong>The</strong> complete solution 10<br />

Which modules are appropriate for your application? 12<br />

Interfaces 13<br />

Planning 14<br />

Tender 16<br />

Price comparision 18<br />

Building elements 20<br />

Cost Management 22<br />

Meetings manager 24<br />

Auditing 26<br />

Building database 28<br />

Construction schedule 30<br />

Assessment of suppliers 31<br />

Building 32<br />

Calculation 34<br />

Standard calculation / recommended prices 36<br />

Gross average wage 38<br />

EF-sheets 39<br />

Recources search and replace 40<br />

Quick price 41<br />

Planning 42<br />

Quantity surveying / invoice 44<br />

Controlling 46<br />

Manpower specification 48<br />

Book of offers 49<br />

Daily report tool 50<br />

Mobile measuring system 52<br />

Operating 54<br />

Module overview tendering and price comparision 56<br />

Module overview calculation 58<br />

Module overview quantity surveying and accounting 60


4<br />

<strong>AUER</strong> <strong>Bausoftware</strong><br />

We would like to introduce you to the leading IT solution for planing and <strong>building</strong>.


Our software supports your operative<br />

daily business and gives you the<br />

freedom to concentrate on the most<br />

important thing: your success.<br />

<strong>AUER</strong> <strong>Bausoftware</strong> is a subsidiary<br />

of the Nemetschek group with its<br />

registered office in Mondsee. We<br />

currently support approx. 3000 clients<br />

from the <strong>building</strong> and secondary<br />

<strong>building</strong> industry. Amongst them are<br />

architects and planning offices, contracting<br />

companies, companies from<br />

the secondary <strong>building</strong> industry and<br />

public establishments that are concerned<br />

with planning and <strong>building</strong>.<br />

<strong>AUER</strong> <strong>Bausoftware</strong> does not just<br />

offer you software solutions, we also<br />

offer services including training and<br />

hotline services. We would be happy<br />

to advise you and help you to simplify<br />

your work processes.<br />

We look forward to assisting you on<br />

your way to economic success.<br />

"Joy at work is the best path on the<br />

way to success!"<br />

5


<strong>AUER</strong> <strong>Bausoftware</strong> – about the company<br />

Outline<br />

<strong>AUER</strong> <strong>Bausoftware</strong> offers intelligent<br />

IT-solutions in the form of a complete<br />

software package for the planning and<br />

<strong>building</strong> industry. Our clients' requirements<br />

and the demands of the <strong>building</strong><br />

industry form the basis of the continuous<br />

development of a modern, versatile<br />

and stable software. <strong>AUER</strong> <strong>Bausoftware</strong><br />

endeavours to influence economic and<br />

sociological development and to have a<br />

positive effect on the future of the <strong>building</strong><br />

industry.<br />

Visions<br />

■ <strong>Auer</strong> <strong>Bausoftware</strong> will take on challenges<br />

in the future and be open for<br />

new ideas and trends from society<br />

and economy<br />

■ Our main aim is to further the development<br />

of a flexible, user-friendly<br />

and practical software<br />

■ Our clients' satisfaction is our<br />

company's main priority. Services,<br />

such as competent advice and a hotline,<br />

strengthen our relationship with<br />

our clients.<br />

■ <strong>The</strong> permanent quality control and<br />

improvement made by our development<br />

team will expand the performance<br />

of <strong>AUER</strong> <strong>Bausoftware</strong>.<br />

■ All <strong>AUER</strong> <strong>Bausoftware</strong> GmbH's<br />

pillars, such as <strong>AUER</strong> Success are<br />

constantly being adapted to meet the<br />

demands of the market. <strong>The</strong>y cover<br />

the needs of small to medium-sized<br />

companies, as well as those of large<br />

industrial concerns.<br />

■ <strong>AUER</strong> <strong>Bausoftware</strong> will increasingly<br />

establish itself in the <strong>building</strong><br />

services industry and expand the<br />

software's popularity.<br />

6


<strong>AUER</strong> Success NG Large range of modules<br />

■ Market tested solutions<br />

■ Straightforward design<br />

■ Sound advice<br />

■ Hotline support<br />

■ Comprehensive training offer<br />

■ Constant programme maintenance<br />

7<br />

www.bausoftware.at


Our foundations are quality and competence<br />

Administration<br />

is carried out in the style of Windows<br />

Explorer. With the integrated data compression,<br />

you can backup your larger<br />

projects simply on disc or send them<br />

directly by e-mail.<br />

From laptop to server<br />

Naturally, the <strong>AUER</strong> <strong>Bausoftware</strong> is<br />

networkable, which means that the<br />

programmes can be installed on standalone<br />

computers or can be easily networked.<br />

Most of the programme components<br />

allow a project to be dealt with<br />

by several people at the same time. <strong>The</strong><br />

individual license can be converted to<br />

an open licence. <strong>The</strong> software can grow<br />

with you at ease.<br />

Above and beyond that, our programme<br />

is not bound to the constraints of a local<br />

network. Operation as a terminal server<br />

is possible and has been tried out several<br />

times in practice.<br />

Address and document<br />

administration<br />

An integrated address administration<br />

is at your disposal when managing<br />

addresses and fields of work, printing<br />

address lists, labels and individual or<br />

mass letters. Every address can be<br />

assigned to up to one hundred contacts.<br />

This programme is not limited to managing<br />

text documents created by the programme.<br />

It can also manage PDF-files,<br />

Excel spreadsheets, pictures and many<br />

other file types.<br />

Naturally included<br />

Many extra functions are included in<br />

our standard programme packages<br />

and do not have to be bought separately.<br />

<strong>The</strong> following contribute to the<br />

efficiency of <strong>AUER</strong> Success NG<br />

■ Project administration<br />

■ Print preview<br />

■ Central address management<br />

■ Text processing<br />

■ Data interexchange according to the<br />

country-specific norms and standards<br />

■ Integrated character assistant<br />

Communication is important to us<br />

Please so not hesitate to let us know if<br />

there is anything missing in the many<br />

possibilities already listed. We are only<br />

too happy to assist you in finding an<br />

ideal solution to any specific problems.<br />

With your help we can meet our clients’<br />

requirements and incorporate<br />

your ideas into the new version of the<br />

software. Your opinion regarding the<br />

different applications is important to us.<br />

<strong>The</strong> quality of our software can only<br />

be upheld and developed by constant<br />

improvement.<br />

8


At a glance<br />

Print preview<br />

You can either send all your printouts<br />

directly to the printer/plotter, or you can<br />

view them in the print preview. This also<br />

applies to print projects with over 1000<br />

pages. <strong>The</strong> selection of individual pages<br />

saves printing costs, because only the<br />

highlighted pages are printed.<br />

<strong>The</strong> data exchange options included in<br />

the print preview simplify communication<br />

with partners. <strong>The</strong> link to a mailing<br />

programme enables you to send the<br />

information directly. You can also send<br />

it as a PDF; this means that it can be<br />

transferred to workstations that do not<br />

have <strong>AUER</strong> software installed.<br />

■ Standard operating systems<br />

(Windows 2000, XP und Vista)<br />

■ Stand-alone installation<br />

■ Networkable<br />

■ Terminal server installation<br />

■ Projekt management<br />

■ Print preview<br />

■ Central address management<br />

■ Central document management<br />

■ Currency conversation<br />

■ Continuous communication with<br />

the client<br />

Project management with <strong>AUER</strong> Success NG 9


<strong>The</strong> complete Solution<br />

<strong>AUER</strong> Success NG is the complete solution<br />

for planning offices, architects and all<br />

companies dealing with the <strong>building</strong> and<br />

secondary <strong>building</strong> industry as well as<br />

<strong>building</strong> authorities of every size.<br />

Tender and price comparison<br />

Creating Bills of Quantities plays a<br />

central role. Standard solutions and<br />

own elements can be processed with<br />

ease using <strong>AUER</strong> Success NG . <strong>The</strong> price<br />

comparison list can be used to provide<br />

a clear overview of the different tender<br />

prices collected.<br />

Cost management<br />

Cost estimation takes place in <strong>AUER</strong><br />

Success NG on the basis of the <strong>building</strong><br />

elemrnts and the benchmark price database.<br />

<strong>The</strong> clear and concise spreadsheets<br />

give you a clear overview of the<br />

entire cost development process, from<br />

budget via estimates, quoting, cost<br />

determination, to payment release.<br />

<strong>The</strong> mobile measuring system has<br />

revolutionised work processes on the<br />

<strong>building</strong> site.<br />

You can carry out simple auditing by<br />

correcting the incorrect invoice details.<br />

<strong>The</strong> programme independently takes<br />

care of all further processing if invoice<br />

data required, up to and including creating<br />

the corrected final invoice.<br />

Invoicing and Auditing<br />

Quantity calculation is carried out in<br />

object specific measurement sheets.<br />

www.bausoftware.at<br />

10


<strong>AUER</strong> Success NG Modules<br />

Calculation and controlling<br />

Standard calculations help you to get<br />

quick results when dealing with tenders.<br />

<strong>The</strong> "Controlling" module supports you,<br />

during the project, when making strategic<br />

decisions regarding long term turnover,<br />

costs and capacity prognosis.<br />

Project management<br />

You can keep control of your resources<br />

easily and exactly with the module<br />

"Construction Schedule". <strong>AUER</strong><br />

Succes NG integrates the construction<br />

schedule, prices, costs, quantities and<br />

working hours, thus optimising project<br />

specific work. <strong>The</strong> daily progress reports<br />

in the construction log ultimately ensure<br />

the punctual completion of the various<br />

activities on the <strong>building</strong> site.<br />

■ Tender<br />

■ Price comparison<br />

■ Building elements<br />

■ Cost management<br />

■ Construction Schedule<br />

■ Meetings manager<br />

■ Auditing<br />

■ Building project database<br />

■ Quick price<br />

■ Calculation<br />

(with standard calculations and<br />

recommended prices)<br />

■ Gross average wage<br />

■ Planning<br />

■ Quantity surveying / invoice<br />

■ Contractor's rates<br />

■ Construction log<br />

■ Controlling<br />

■ Tender log<br />

■ Mobile measuring system<br />

■ Manpower specification<br />

■ Book of offers<br />

■ Bank guarantee management<br />

■ Daily report tool<br />

11


Which modules are appropriate for your<br />

application?<br />

Module Architect / Construction Planning services<br />

Modul<br />

Planning office company company<br />

Architekt/Planungsbüro Bauunternehmen Baunebengewerbe<br />

Tender ■ ■ ■<br />

Price comparision<br />

■<br />

Building elements<br />

■<br />

Cost management<br />

■<br />

Construction schedule ■ ■<br />

Meeting manager<br />

■<br />

Auditing<br />

■<br />

Building project manager<br />

■<br />

Assessment of suppliers ■ ■<br />

Calculation ■ ■<br />

Standard calculations ■ ■<br />

Recommended prices<br />

■<br />

Gross average wage ■ ■<br />

Resources search & replace ■ ■<br />

Quick price ■ ■ ■<br />

Planning ■ ■<br />

Quantity surveying ■ ■<br />

Controlling<br />

■<br />

Manpower spezification ■ ■<br />

Contractor's rate<br />

■<br />

Book of offers ■ ■<br />

Bank guarantee management ■ ■<br />

Daily report tool ■ ■<br />

Mobile measuring system ■ ■<br />

Interfaces ■ ■ ■<br />

12


Interfaces<br />

At a glance<br />

<strong>The</strong> gateway to the world<br />

<strong>AUER</strong> Success NG has a number of interfaces<br />

in its basic equipment alone. In<br />

addition to these you can extend the<br />

networkability of <strong>AUER</strong> Success NG with<br />

optional interfaces. <strong>The</strong> following interfaces<br />

are standard with the relevant<br />

programme modules:<br />

■ Interexchange of specification logs<br />

and specification catalogues as well<br />

as the export of invoicing data according<br />

to the respectively applicable<br />

country specific norms and standards<br />

■ Import and export of address data in<br />

Excel or CSV format<br />

■ Import and export of the types of<br />

costs from the "Controlling" module<br />

in ACSII format<br />

■ Export of the planning data from<br />

the "planning" module regarding the<br />

transfer to MIS systems in ASCII format.<br />

■ Import of tender prices in the "price<br />

comparison" module according to<br />

current standards and in MS-Excel<br />

format.<br />

■ Import and export of construction<br />

schedules to MS-Excel format<br />

(construction schedule)<br />

■ Import and export of health and safety<br />

plans to MS-Excel format (Safety<br />

Professional)<br />

Other interfaces<br />

<strong>AUER</strong> Success NG is not just limited to<br />

the standard interfaces. <strong>The</strong>re are other<br />

interfaces at your disposal as required.<br />

<strong>AUER</strong> Success NG Application server<br />

Should all of these standards not suffice,<br />

then we can offer you the <strong>AUER</strong><br />

Success NG application server. With the<br />

server you can programme individual<br />

applications and analyses to suit your<br />

individual needs. You receive a basic<br />

programme with numerous methods,<br />

features and examples (VBA).<br />

Connecting <strong>AUER</strong> Success NG to various<br />

diverse external systems (e.g. SAP) is<br />

therefore possible - it's up to you! All<br />

you need is knowledge of programming.<br />

■ Data interexchange according to<br />

the respectively applicable country<br />

specific norms and standards<br />

■ Takeover of dimensions from<br />

Allplan FT<br />

■ Price maintenance according to<br />

ÖBSL and other price lists.<br />

■ MS-Excel and MS-Outlook<br />

■ ASCII and CSV<br />

■ PDF<br />

■ <strong>AUER</strong> Success NG Applikation-<br />

Server<br />

<strong>AUER</strong> <strong>Bausoftware</strong> is a part of the<br />

Nemetscheck Group. <strong>The</strong> interfaces of<br />

this comprehensive family are constantly<br />

being further developed. <strong>The</strong> dimensions<br />

from the CAD software Allplan<br />

FT can be simply transferred to <strong>AUER</strong><br />

Success NG tenders.<br />

13


14<br />

PlaNnING. <strong>AUER</strong> Success NG – Modules designed to meet the demands<br />

of planning and architecture


<strong>AUER</strong> Success NG allows you and your<br />

staff to manage your <strong>building</strong> projects<br />

more effectively, create clearer<br />

costing, compare price offers and use<br />

information together in an efficient<br />

way.<br />

<strong>AUER</strong> Success NG<br />

has been specially<br />

developed to meet the demands of<br />

the planning and <strong>building</strong> industry.<br />

<strong>The</strong> technical, economic software<br />

displays all your business processes<br />

in an integrated way. Information is<br />

readily available; the entire handling<br />

is simpler, quicker and cheaper.<br />

You can keep track of your economic<br />

decisions, and you ensure a surplus<br />

in matters of security and profitability.<br />

Specifications can be viewed quickly<br />

and easily, quantity calculations are<br />

automatically calculated from CAD<br />

drawings, tenders are checked for<br />

miscalculations and the average<br />

wages are calculated exactly. <strong>AUER</strong><br />

Success NG contains every module that<br />

will help you to realise your projects<br />

simply and economically.<br />

15


Tender<br />

<strong>The</strong> main task of a tender programme<br />

is quickly creating specification catalogues.<br />

You should be able to use some<br />

item texts like texts from the standard<br />

specifications (books provided by the<br />

government regulating the jobs to be<br />

carried out by certain workers).<br />

In addition to that you can import supplementary<br />

bills of quantities online.<br />

Tenders for projects of every size<br />

Quantity calculations<br />

For every item you can store the quantity<br />

calculations in a separate window<br />

with a formula of your choice. This<br />

means that the quantities tendered will<br />

be perfectly documented. <strong>The</strong> specification<br />

catalogue quantities can be taken<br />

from the "construction invoice" module.<br />

A conversion factor can adapt all values<br />

to any new situation, if required.<br />

Graphic quantity determination<br />

Special interfaces enable you to take<br />

CAD quantity determinations from<br />

Allplan FT, the graphic quantity determination<br />

programme.<br />

This tool makes it possible to take<br />

item amounts directly from CAD plans.<br />

Architects and master builders will find<br />

calculating quantity needs and specification<br />

catalogue compilation much<br />

easier.<br />

Calculation for the Amount of Debris<br />

An integrated function automatically calculates<br />

the amount of debris according<br />

to the SR-structural engineering (manual<br />

pertaining to structural engineering)<br />

when tendering demolition work. At the<br />

press of a button you will see a correlation<br />

of the stored items in the specification<br />

catalogue.<br />

Pictures illustrating long descriptions<br />

A picture can be placed next to every<br />

item in the specification catalogue, if<br />

required. Using the simple, integrated<br />

graphic programme, you can create the<br />

required sketches or imported existing<br />

graphic files (bitmaps, windows Meta<br />

files, Jpeg and GIF-files). <strong>The</strong> pictures<br />

can also be seen in the printed specifications,<br />

if required.<br />

16


At a glance<br />

■ Access to standard and supplementary<br />

specification manuals<br />

and your own document<br />

■ Specification explorer for a quick<br />

overview<br />

■ Every item type complies with the<br />

respectively applicable country<br />

specific standards<br />

■ Data exchange according to the<br />

espectively applicable country specific<br />

standards<br />

■ Integrated quantity calculation<br />

■ Quantity adoption from the<br />

construction statement (optional)<br />

■ Numerous specification catalogue<br />

print outs<br />

■ Debris calculation<br />

■ Integrated address management<br />

■ CAD quantity adoption from Allplan<br />

FT (graphic quantity establishment)<br />

Highlight the required position<br />

Address and document management<br />

In <strong>AUER</strong> Success NG you can manage<br />

your data according to projects. You<br />

can create and print out address lists,<br />

standard letters or telephone lists.<br />

<strong>The</strong> addresses you have saved can<br />

be accessed by every other module in<br />

the <strong>AUER</strong> <strong>Bausoftware</strong>. You can also<br />

use the addresses with a standard programme<br />

(e.g. MS-Word or MS-Excel),<br />

using an interface.<br />

Changing the data carrier<br />

In accordance with the respectively<br />

applicable country specific norms and<br />

standards, changing the data carrier<br />

is an integral part of our programme,<br />

naturally at no extra cost. <strong>The</strong> file format<br />

is automatically recognised when you<br />

import it. This saves you and your partners'<br />

time and money. <strong>The</strong> data carrier<br />

analysis has been integrated into <strong>AUER</strong><br />

Success NG .<br />

Printing options<br />

<strong>The</strong> print layout is entirely your choice,<br />

whether it is an empty specification<br />

catalogue or one with prices, quantity<br />

calculations, cloze text, transferrals or<br />

grouped sums, with or without a text<br />

description.<br />

17


Price comparision<br />

After sending your invitation to tender,<br />

you receive tenders from various potential<br />

suppliers. You can quickly and simply<br />

enter the names of the companies<br />

submitting the tenders and read the<br />

prices from different data carriers into<br />

<strong>AUER</strong> Success NG . You quickly gain an<br />

overview of the tendering companies’<br />

prices using the price comparison function.<br />

<strong>The</strong> prices will be<br />

revised in a clear and<br />

comprehensive table<br />

Tender variants<br />

You do not have to use the price comparison<br />

just on the basis of the specification<br />

catalogue quantities, but also<br />

with the different forecast amounts and<br />

with actual quantities invoiced. Forecast<br />

amounts can be read in a concise<br />

spreadsheet or in the "construction<br />

costs" module.<br />

Data carrier exchange<br />

For the import of prices we offer an<br />

intelligent data interface, made in accordance<br />

with the respectively applicable<br />

country specific standards. <strong>The</strong> software<br />

automatically recognises different<br />

data formats. <strong>The</strong> prices are imported<br />

including all surcharges and discounts.<br />

Analyses included<br />

Alongside the ABC Analysis, <strong>AUER</strong><br />

Success NG offers you a special heavyduty<br />

deviation analysis. This compares<br />

a tendering company with the average<br />

price or your own price.<br />

Best tender determination<br />

Using the Bundesvergabegesetz<br />

(Purchase contract award act) as a<br />

basis, the best economic offer can be<br />

calculated. In addition to the price, various<br />

other quality criteria can be taken<br />

into account. For the presetting<br />

10 quality criteria are available.<br />

Tender evaluation and price comparison<br />

list<br />

<strong>The</strong> programme checks the tenders for<br />

you in terms of completeness and for<br />

any miscalculations. Miscalculations<br />

will be stored in a protocol, according<br />

to guidelines and calculated to a final<br />

sum. You can then compare your own<br />

prices with the theoretically cheapest<br />

tender and the average sum. When<br />

awarding the contract you can create a<br />

data file with the awarding specification<br />

catalogue. This way, you can exchange<br />

the set prices with your contractual partners.<br />

Alongside that, there are interfaces<br />

which enable you to export the data in<br />

CSV format or as an Excel spreadsheet.<br />

18


<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Compar. of prices / EUR<br />

WWTP Sevlievo<br />

Item number<br />

Item text<br />

Quantity u.<br />

Cost<br />

IVCCegC<br />

03 WWTP Sevlievo<br />

03.01.00.00 Inlet Pump Station Structure<br />

03.01.00.01 Excavation<br />

1.438,00 m3 Z<br />

271,58<br />

4,62<br />

03.01.00.02 Backfilling<br />

426,00 m3 Z<br />

34,66<br />

03.01.00.03 Sheet Piles<br />

03.01.00.04 Driving a. extraction<br />

597,00 m2 Z<br />

23,05<br />

03.01.00.05 Lean Concrete 10 cm C8/10<br />

194,00 m2 Z<br />

136,56<br />

03.01.00.07 Concrete Base Slab<br />

118,00 m3 Z<br />

20,33<br />

03.01.00.08 Reinforcement 120 kg/m³<br />

14.150,00 kg Z<br />

36,66<br />

03.01.00.09 Formwork BS<br />

98,00 m2 Z<br />

45,38<br />

03.01.00.10 Walls Ground floor<br />

175,00 m3 Z<br />

29,94<br />

03.01.00.11 Reinforcement 120 kg<br />

14.708,00 kg Z<br />

36,58<br />

03.01.00.12 Formw. walls<br />

962,00 m2 Z<br />

58,46<br />

03.01.00.14 Concrete Ceilling<br />

48,00 m3 Z<br />

03.01.00.15 Reinforcement 120 kg<br />

5.734,00 kg Z<br />

03.01.00.16 Formwork Ceilling cellar<br />

164,00 m2 Z<br />

Average<br />

4,94<br />

40,22<br />

8,38<br />

90,98<br />

0,78<br />

16,49<br />

93,73<br />

0,78<br />

18,16<br />

93,73<br />

0,78<br />

18,16<br />

Tenderer 4<br />

UP<br />

Item Price<br />

Tenderer 2<br />

UP<br />

Item Price<br />

3,38<br />

3,65<br />

6,82<br />

4.860,44 5.248,70 9.807,16<br />

100,0 % 108,0 % 201,8 %<br />

2,92<br />

2,35<br />

9,54<br />

1.243,92 1.001,10 4.064,04<br />

124,3 % 100,0 % 406,0 %<br />

67,71<br />

25,90<br />

54,53<br />

40.422,87 15.462,30 32.554,41<br />

M 261,4 % 100,0 % 210,5 %<br />

10,36<br />

7,50<br />

7,28<br />

2.009,84 1.455,00 1.412,32<br />

142,3 % 103,0 % 100,0 %<br />

81,48<br />

104,20<br />

87,27<br />

9.614,64 12.295,60 10.297,86<br />

100,0 % 127,9 % 107,1 %<br />

0,72<br />

0,80<br />

0,82<br />

10.188,00 11.320,00 11.603,00<br />

100,0 % 111,1 % 113,9 %<br />

18,46<br />

5,89<br />

25,11<br />

1.809,08<br />

577,22 2.460,78<br />

313,4 % 100,0 % 426,3 %<br />

81,48<br />

112,43<br />

87,27<br />

14.259,00 19.675,25 15.272,25<br />

100,0 % 138,0 % 107,1 %<br />

0,72<br />

0,80<br />

0,82<br />

10.589,76 11.766,40 12.060,56<br />

100,0 % 111,1 % 113,9 %<br />

18,46<br />

10,92<br />

25,11<br />

17.758,52 10.505,04 24.155,82<br />

169,0 % 100,0 % 229,9 %<br />

81,48<br />

112,43<br />

87,27<br />

3.911,04 5.396,64 4.188,96<br />

100,0 % 138,0 % 107,1 %<br />

0,72<br />

0,80<br />

0,82<br />

4.128,48 4.587,20 4.701,88<br />

100,0 % 111,1 % 113,9 %<br />

18,46<br />

10,92<br />

25,11<br />

3.027,44 1.790,88 4.118,04<br />

169,0 % 100,0 % 229,9 %<br />

Comparison on basis BoQ quantities<br />

Tenderer 1<br />

UP<br />

Item Price<br />

UP<br />

Item Price<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />

/ 19.11.2008 15:09 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Deviation analysis<br />

WWTP Sevlievo<br />

Tenderer 1 Our own price<br />

Item number Item text Quantity u. I V CC e g C<br />

ABC-LV Price Tenderer deviation Price Our own price<br />

1 Price Our own price in % to<br />

Aver. price Diff. from average price in %<br />

03 WWTP Sevlievo<br />

03 .0 1. 00.00 Inlet Pump Station Structure<br />

03 .0 1. 00.01 Excavation 1.438,00 m3 Z<br />

8,42 % 6,82 271,58 -97,5 %<br />

3,02 125,8 %<br />

03 .0 1. 00.02 Backfilling 426,00 m3 Z<br />

0,32 % 9,54 34,66 -72,5 %<br />

2,57 271,2 %<br />

03 .0 1. 00.03 Sheet Piles<br />

03 .0 1. 00.04 Driving a. extraction 597,00 m2 Z<br />

0,30 % 54,53 136,6 %<br />

23,05<br />

74,31 -26,6 %<br />

03 .0 1. 00.05 Lean Concrete 10 cm C8/10 194,00 m2 Z<br />

0,57 % 7,28 136,56 -94,7 %<br />

6,45 12,9 %<br />

03 .0 1. 00.07 Concrete Base Slab 118,00 m3 Z<br />

0,05 % 87,27 329,3 %<br />

20,33<br />

67,08 30,1 %<br />

03 .0 1. 00.08 Reinforcement 120 kg/m³ 14.150,00 kg Z<br />

11,19 % 0,82 36,66 -97,8 %<br />

0,61 34,4 %<br />

03 .0 1. 00.09 Formwork BS 98,00 m2 Z<br />

0,10 % 25,11 45,38 -44,7 %<br />

11,34 121,5 %<br />

03 .0 1. 00.10 Walls Ground floor 175,00 m3 Z<br />

0,11 % 87,27 191,5 %<br />

29,94<br />

71,48 22,1 %<br />

03 .0 1. 00.11 Reinforcement 120 kg 14.708,00 kg Z<br />

11,60 % 0,82 36,58 -97,8 %<br />

0,63 30,9 %<br />

03 .0 1. 00.14 Concrete Ceilling 48,00 m3 Z<br />

0,68 % 87,27 656,00 -86,7 %<br />

71,48 22,1 %<br />

03 .0 1. 00.15 Reinforcement 120 kg 5.734,00 kg Z<br />

12,49 % 0,82 101,00 -99,2 %<br />

0,63 30,9 %<br />

03 .0 1. 00.16 Formwork Ceilling cellar 164,00 m2 Z<br />

0,89 % 25,11 252,00 -90,0 %<br />

14,36 74,9 %<br />

03 .0 1. 00.17 Brick Walls 25 cm 295,00 m2 Z<br />

0,98 % 17,48 154,00 -88,6 %<br />

24,05 -27,3 %<br />

03 .0 1. 00.18 Ceilling above Ground floor 46,00 m3 Z<br />

0,47 % 87,27 475,36 -81,6 %<br />

71,83 21,5 %<br />

03 .0 1. 00.19 Reinforcement 120 kg 5.519,00 kg Z<br />

9,76 % 0,82 82,00 -99,0 %<br />

0,63 30,2 %<br />

Price comparison<br />

list in different<br />

layouts<br />

<strong>The</strong> deviation analysis compares<br />

a tendering company<br />

with the average price or with<br />

your own price<br />

At a glance<br />

■ up to 99 tendering companies can<br />

be managed per specification catalogue<br />

■ Reading in of the tendering<br />

company’s prices from applicable<br />

country specific standards and<br />

MS-Excel<br />

■ Supports all possible surcharges<br />

and discounts according to applicable<br />

norms<br />

■ Records forecast amounts<br />

■ Tender inspection and tender protocol<br />

■ Graphic presentation of price differences<br />

■ Comparison with your own price,<br />

ideal tendering company, average<br />

price tendering company and with<br />

forecast quantities<br />

■ Creates allocation specification<br />

catalogue as data medium in<br />

accordance with respectively applicable<br />

standards<br />

■ Deviation analysis<br />

■ Exchange of data media according<br />

to respectively applicable country<br />

specific standards<br />

■ Integrated address and project<br />

management<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />

/ 19.11.2008 15:10 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

19


Building elements<br />

From the idea to the project<br />

Your needs will be met with the correlation<br />

of individual items to <strong>building</strong> elements<br />

and entire constructions.<br />

Comprehensive documentation of the<br />

planned <strong>building</strong>, including its construction,<br />

is created with the cost development.<br />

<strong>The</strong> construction is divided into<br />

objects.<br />

Project development is done in a coherent browser<br />

<strong>The</strong> revolution of <strong>building</strong> elements<br />

Every object can be made up of one or<br />

more elements, a element can also be<br />

made up of different elements or specification<br />

items. Market-tested prices are<br />

linked by optionally depositing a standard<br />

specification log with recommended<br />

prices or calculations.<br />

Our goal is to create the easiest way<br />

for you to complete your quantity determinations<br />

and specifications in one<br />

operation. Along with the specification<br />

catalogue items you can also store specification<br />

and drawings.<br />

Diverse printing options make sure that<br />

your information is put in writing.<br />

Keeping order by division<br />

By means of a logical element link with<br />

the <strong>building</strong>'s dimensions, a comprehensive<br />

quantity list of the individual items<br />

will be drawn up. Parallel to the quantity<br />

calculations, you can create project<br />

specific <strong>building</strong> specifications referring<br />

to the standard specifications for the<br />

<strong>building</strong> elements.<br />

This gives you a greater certainty of<br />

costs and substantially rationalises<br />

your entire working process. By integrating<br />

the programme package <strong>AUER</strong><br />

Success NG , you can create a rough specifications<br />

catalogue using the elements<br />

provided. Further development (specifications,<br />

calculation) is immediately<br />

possible.<br />

Advantages of the element-based<br />

method<br />

■ Project development, from rough to<br />

detailed<br />

■ By changing elements and items,<br />

planning can be flexibly adapted<br />

■ Planning processes are rationalised<br />

(e.g. generation of specification catalogues)<br />

■ Transparency of costs due to the<br />

basis being documented<br />

■ Security of costs by means of access<br />

to items and recommended pricing<br />

■ Flexibility by means of linking macro<br />

and rough elements to smaller, finer<br />

elements<br />

■ Quicker cost comparison when plans<br />

change<br />

20


At a glance<br />

Calculation of costs<br />

<strong>The</strong> prices are taken from the specifications<br />

catalogue linked to the element<br />

and consolidated to create the costs of<br />

the object. Any changes made to the<br />

plan automatically generate other element<br />

values. This affects all sections,<br />

right through to the calculation of costs.<br />

Divergences in quality can be obtained<br />

by changing elements or items.<br />

Recommended Prices<br />

You can also purchase our recommended<br />

price database with approx. 20,000<br />

recommended prices, which is also suitable<br />

for the manual for master builders<br />

of structural engineering.<br />

You obtain the most important result<br />

when you calculate the object as a<br />

rough specification catalogue. Here,<br />

you can carry out analyses on the whole<br />

project or on individual project sections.<br />

Integrating the tender<br />

You can transfer the item quantities<br />

directly from the rough specification<br />

catalogue to the tender without a problem.<br />

Not only every item quantity<br />

but also all higher-level headings and<br />

parent groups will be chosen. (For this<br />

programme you need the programme<br />

module "Tender").<br />

■ Management of master data for<br />

<strong>building</strong> elements<br />

■ Free calculation of quantities with<br />

variables<br />

■ Drawings for construction parts<br />

■ Integrated specifications<br />

■ Selective management of objects<br />

according to construction parts,<br />

phase of construction, storeys,<br />

rooms, axes and trades<br />

■ Correlation of quantities in a rough<br />

specification catalogue<br />

■ Optional - automatic transferral of<br />

the item quantities in the tender<br />

21


Cost management<br />

Keeping track of your costs<br />

An orderly work process during each<br />

stage of the project is essential for keeping<br />

track of costs. <strong>The</strong> main concern is<br />

the sufficient breakdown of the planned<br />

costs.<br />

<strong>The</strong> applicable standard provides you<br />

with two basic concepts with its design<br />

and planning-oriented classification.<br />

Advantages<br />

■ Security through clear structure and<br />

separation of the project stages<br />

■ Multi-stage cost planning from rough<br />

to detailed<br />

■ Universal documentation from budgeting<br />

to the final account<br />

■ Flexible cost structure, which can be<br />

expanded at your discretion<br />

■ Clear analyses at any time<br />

Documented Project Schedule<br />

All stages of every project are permanently<br />

saved. All background information<br />

will be saved during the whole project<br />

period. All costs can be controlled<br />

easily and clearly, from budgeting to the<br />

final statement.<br />

Budget<br />

Your first step is determining the budget<br />

for every cost type. At the same time<br />

as entering the absolute amounts, the<br />

programme calculates the breakdown of<br />

the construction costs in percent.<br />

Cost estimate<br />

Your second step is giving a detailed<br />

estimate for each group. Simply determine<br />

the calculation data and save it in<br />

the background.<br />

Order management<br />

With every type of cost there is the<br />

possibility of managing as many orders,<br />

invoices and payments as you wish.<br />

All relevant information can be saved<br />

separately as a background notice after<br />

the project.<br />

22


At a glance<br />

■ Breakdown of expenses accordingto<br />

currently valid standard<br />

■ Individual breakdown of expenses<br />

■ Prognosis of costs (cost preview)<br />

■ Cost estimation in percent of the<br />

whole or part of the total amount<br />

possible<br />

■ Cost estimates can be imported<br />

from similar projects<br />

■ Predefined calculation structures<br />

according to valid standards<br />

- plan oriented<br />

- performance oriented<br />

All data is presented in a central overview of costs<br />

Invoice management<br />

Here you can create all invoices with an<br />

invoiced amount, set amount and deductions.<br />

This serves as the documentation<br />

for release for payment.<br />

Payment management<br />

Payments are saved according to the<br />

type of payment and the supplier, including<br />

all relevant extra information.<br />

Amount retained<br />

For every project, you can define 20 different<br />

types of retained amount, either<br />

in the form of a lump sum, or as a percentage<br />

of the invoiced amount.<br />

Clear Project Status<br />

<strong>The</strong> project is constantly updated in a<br />

clearly set out table. This makes it possible<br />

for you to see:<br />

■ incomplete work<br />

■ Unpaid payments<br />

■ Open balances<br />

Prognosis<br />

In addition to the data saved from jobs<br />

and invoices, you can gain an insight<br />

into the future, by means of the prognosis<br />

column.<br />

23


Meetings manager<br />

Meetings are part of the everyday life<br />

of every office and construction company.<br />

This leads to a large amount of<br />

protocols that are hard to keep track<br />

of. When the number of documents<br />

increases, keeping track of points and<br />

defects yet to be completed becomes<br />

harder.<br />

<strong>The</strong> meetings manager supports you by<br />

simply and quickly completing project<br />

specific documents such as meeting<br />

protocols, acceptance certificates. It<br />

also helps when following up on defects<br />

and keeping a calendar of appointments<br />

and a list of completed tasks. <strong>The</strong> meetings<br />

manager is the ideal tool for site<br />

agent or supervisor, project managers,<br />

construction supervisors and secretaries,<br />

because of its versatility.<br />

Points yet to be dealt with and defects are often forgotten<br />

Organisation and documentation<br />

All project protocols are sorted into<br />

an index tree. Protocols from a series<br />

of meetings that belong together<br />

(construction meetings, Jour-Fix) can be<br />

managed in a set of meetings. This has<br />

the advantage that all members to be<br />

invited and all points not yet discussed<br />

can be taken from the previous protocol.<br />

Punctual and sufficient preparation for<br />

the meeting is possible.<br />

Every piece of information, from the<br />

invitation to the post details, for every<br />

meeting is saved. Every point of discussion<br />

can be detailed either in detail or in<br />

note form.<br />

Any points still to be discussed can be<br />

saved in a table along with any people<br />

or companies responsible and any<br />

appointments belonging to them.<br />

Alongside that, lists of tasks to be completed<br />

can be saved in their relevant<br />

fields (construction parts, areas of work,<br />

objects).<br />

Search and find<br />

<strong>The</strong> search function enables you to find<br />

specific contents in a store of thousands<br />

of documents and units. Open points of<br />

discussion and tasks to be completed<br />

can be sorted according to person,<br />

company or construction components<br />

and will be combined.<br />

<strong>The</strong> mail-merge letter function supports<br />

you when you are organising meetings.<br />

Via the menu choice "survey list" you<br />

can carry out a selection of meetings<br />

according to certain criteria.<br />

Management<br />

■ Invitations to meetings<br />

■ Protocol<br />

■ Attendance lists<br />

■ Job lists<br />

■ Questions regarding the points of<br />

discussion<br />

24


At a glance<br />

■ Records project specific documents<br />

easily<br />

■ Sends out invitations to the meeting<br />

■ Creates separate and continuous<br />

protocols<br />

■ Creates group discussions (e.g.<br />

following up defects)<br />

■ Searches for content from thousands<br />

of documents<br />

■ Creates attendance and job lists<br />

■ Selects discussion points by<br />

means of a query list<br />

■ Keeps a record of the points of the<br />

meeting<br />

■ Text printouts of all functions<br />

Create meeting protocol<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Record no.: 010001<br />

WWTP Sevlievo<br />

Meeting No.: 010001<br />

Subject M 22.04.2006<br />

City Mondsee<br />

Date 22.04.2006 from13:00 to 16:00<br />

head Mr. Kent<br />

secretary Mrs. Smith<br />

Project no.<br />

Document no.<br />

release<br />

Participant<br />

Type of work Comp. Participant from to<br />

Max Muster Mr. Smith 13:00 16:00<br />

ÖAB Mr. Bauer<br />

loaded<br />

present<br />

Distributor<br />

Discussion points<br />

No. keyword/text State To be completed by<br />

chapter delegated to Main responsibility<br />

010001.1 Inspection of Air-Handling System Ground Floor in progress<br />

Text <strong>The</strong> air-handling system (ground floor) will be inspected on<br />

24.05.2006. Mr. Mayr makes a report about the technical<br />

condition of the air-handling system, which will be sent to the<br />

ÖBA-IMB. <strong>The</strong> ÖBA-IMB decides what happened with the<br />

system (renovate, renew or close).<br />

010001.2 Change of Plan in progress<br />

Text Dining hall, canteen, cafeteria:<br />

Generally doors will be opened outwards. Door canteen<br />

150/200, moving door 100/200 slot axis 40-41: wall, fixture<br />

cloak room in canteen.<br />

handicapted toilet: comletion with a wooden panel to the<br />

window (toilet separating plate).<br />

Send printouts<br />

as a PDF<br />

roof framework<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />

/ 20.11.2008 08:54 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

25


Auditing<br />

Auditing takes place on a second data<br />

level above the contracting agency's<br />

dimensions. If corrections need to be<br />

made to the formula or the item number,<br />

delete the original by pressing the button.<br />

<strong>The</strong> correct basis is then written in<br />

the new line above it. <strong>The</strong> data transfer<br />

is guaranteed in the further linkage.<br />

Calculations are carried out freely or by<br />

using one of the approx. 170 available<br />

formulas.<br />

<strong>The</strong> quantity calculations are either<br />

transferred in <strong>AUER</strong> Success NG format or<br />

via the optional import interface, according<br />

to current norms.<br />

Delete and overwrite items<br />

Quick Analysis<br />

<strong>The</strong> programme automatically creates<br />

analyses such as summary sheets, interim<br />

and final accounts from the quantity<br />

calculations. Changes in the dimension<br />

sheets have an effect on the invoice.<br />

<strong>The</strong> assistant can be activated in every<br />

calculation cell.<br />

Data Protection<br />

Allocate separate passwords to original<br />

calculation and auditing. This ensures<br />

both of the contractual parties that their<br />

data will not be altered. <strong>The</strong> contractual<br />

party can see the corrections but cannot<br />

make any further alterations.<br />

Optimal documentation<br />

All corrections made to the dimension<br />

will be taken into account by every<br />

module up to and including the final<br />

statement, and will also be saved.<br />

Analyses<br />

<strong>The</strong> quantities and corrections recorded<br />

can be selected according to construction<br />

part, performance or invoicing<br />

period, company, party, process or work<br />

phase. <strong>The</strong> quantity comparison enables<br />

you to quickly gain an overview of<br />

the status of the calculations.<br />

Invoice management<br />

You can keep an overview of invoices<br />

sent and payments received in the integrated<br />

invoice management.<br />

26


At a glance<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Correction protocol<br />

WWTP Sevlievo<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Summary Sheet<br />

WWTP Sevlievo<br />

03 .0 1. 00.04 Driving a. extraction m2<br />

0002 Aereted Grit chamber 000 004 21.10.2008 N 459,000 m2<br />

Sum of item 03 .0 1. 00.04 459,000 m2<br />

03 .0 1. 00.05 Lean Concrete 10 cm C8/10 m2<br />

0002 Aereted Grit chamber 000 004 21.10.2008 N 1.020,000 m2<br />

Sum of item 03 .0 1. 00.05 1.020,000 m2<br />

03 .0 1. 00.07 Concrete Base Slab m3<br />

0002 Aereted Grit chamber 000 004 21.10.2008 N 437,500 m3<br />

Sum of item 03 .0 1. 00.07 437,500 m3<br />

03 .0 1. 00.08 Reinforcement 120 kg/m³ kg<br />

0002 Aereted Grit chamber 000 004 21.10.2008 N 119,000 kg<br />

Sum of item 03 .0 1. 00.08 119,000 kg<br />

03 .0 1. 00.09 Formwork BS m2<br />

0002 Aereted Grit chamber 000 004 21.10.2008 N 125,000 m2<br />

Sum of item 03 .0 1. 00.09 125,000 m2<br />

03 .0 1. 00.12 Formw. walls m2<br />

0002 Aereted Grit chamber 000 004 21.10.2008 N 84,000 m2<br />

Sum of item 03 .0 1. 00.12 84,000 m2<br />

03 .0 1. 00.23 Doors a. Gates 200x300 ST<br />

0001 Aereted Grit chamber 000 004 09.10.2008 N 2,000 ST<br />

Sum of item 03 .0 1. 00.23 2,000 ST<br />

MESH Nr. BCC WP IP Note<br />

Measurement 03 .0 sh.title 3. 00.01<br />

Calculation figure<br />

Lean Concrete m2<br />

Line no.Item no. Quantity u.<br />

0001 004 09.10.2008 Aereted Grit chamber 000 N 5,077 m2<br />

Sum of item 03 .0 3. 00.01 5,077 m2<br />

0001 Aereted Grit chamber 004<br />

03 .0 3. 00.02 Base Slabe<br />

(4)<br />

(1,915+0,09625+0,066+0,561)*2<br />

5,277 m2<br />

0001 Aereted Grit chamber 000 004 09.10.2008<br />

m3<br />

m3<br />

N 36,360<br />

5 03.03.00.01 (1,815+0,09625+0,066+0,561)*2<br />

=<br />

of<br />

5,077<br />

item 03<br />

m2<br />

.0 3.<br />

ß<br />

Sum 00.02 36,360 m3<br />

(4,95+0,395+1,65+0,815+0,078+0,51+3,74)*3<br />

36,414 m3<br />

(8)<br />

9 03.03.00.02 (4,95+0,395+1,65+,815+0,06+0,51+3,74)*3<br />

= 36,360 m3 ß<br />

(13)<br />

1*3<br />

3,000 ST<br />

14 03.01.00.23 1*2<br />

= 2,000 ST ß<br />

Original<br />

Item number Item text u.<br />

MESH Nr. Measurement sh.title BCC IP WP State Checked Result u.<br />

■ Checking of the bills of quantities<br />

■ Protocol of corrections<br />

■ Summary sheets with corrections<br />

■ Password protection<br />

■ Catalogue of formulas in accordance<br />

with current standard with<br />

more than 170 formulas<br />

■ Graphic display of the catalogue of<br />

formulas<br />

■ Price conversion according to the<br />

indexing process also for WWF<br />

■ Certificate of threshold value by<br />

price differences with an index<br />

■ Transfer of invoice data from<br />

<strong>AUER</strong> Success projects<br />

■ Data exchange and export according<br />

to the respectively applicable<br />

country specific norms and standards<br />

0002 Aereted Grit chamber 004<br />

(5)<br />

H*R/2<br />

6 03.01.00.04 H*R<br />

(14)<br />

H*R*3,9 ;m*m*m<br />

15 03.01.00.07 H*R*3,5 ;m*m*m<br />

(17)<br />

34*3,2<br />

18 03.01.00.08 34*3,5<br />

(20)<br />

H*R*0,8<br />

21 03.01.00.09 H*R<br />

229,500 m2<br />

= 459,000 m2 ß<br />

487,500 m3<br />

= 437,500 m3 ß<br />

108,800 kg<br />

= 119,000 kg ß<br />

100,000 m2<br />

= 125,000 m2 ß<br />

Billing Address<br />

0003 Aereted Grit chamber 004 No correction<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />

/ 19.11.2008 15:31 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

Partial Invoice Nr. 00001<br />

Mondsee, 19.11.2008<br />

User:<br />

Project<br />

WWTP Sevlievo<br />

Item number<br />

CL Item text<br />

Quantity u. Parts of price Item price<br />

03 .0 1. 00.03 Sheet Piles<br />

03 .0 1. 00.04 Driving a. extraction<br />

Wa.: 22,82<br />

Ot.: 0,23<br />

459,000 m2 UP.: 23,05 EUR 10.579,95<br />

18,04 GBP 8.280,40<br />

Concrete 10 cm C8/10<br />

03 .0 1. 00.05 Lean<br />

Wa.: 135,19<br />

Ot.: 1,37<br />

1.020,000 m2 UP.: 136,56 EUR 139.291,20<br />

106,88 GBP 109.016,26<br />

Concrete Base Slab<br />

03 .0 1. 00.07<br />

Wa.: 17,16<br />

Ot.: 3,17<br />

437,500 m3 UP.: 20,33 EUR 8.894,38<br />

15,91 GBP 6.961,19<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />

/ 19.11.2008 16:22 Reinforcement 120 kg/m³<br />

FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

03 .0 1. 00.08 Printed with <strong>AUER</strong> Success Version 5.00 - License<br />

Wa.: 34,31<br />

Ot.: 2,35<br />

119,000 kg UP.: 36,66 EUR 4.362,54<br />

28,69 GBP 3.414,34<br />

Formwork BS<br />

03 .0 1. 00.09<br />

Wa.: 39,98<br />

Ot.: 5,40<br />

125,000 m2 UP.: 45,38 EUR 5.672,50<br />

35,52 GBP 4.439,58<br />

Formw. walls<br />

03 .0 1. 00.12<br />

Wa.: 54,91<br />

Ot.: 3,56<br />

84,000 m2 UP.: 58,47 EUR 4.911,48<br />

45,76 GBP 3.843,97<br />

a. Gates 200x300<br />

03 .0 1. 00.23 Doors<br />

Wa.: 50,00<br />

Ot.: 785,00<br />

2,000 ST UP.: 835,00 EUR 1.670,00<br />

653,51 GBP 1.307,03<br />

Piles 175.382,05<br />

03 .0 1. 00.03 Sheet<br />

03 .0 1. 00.00 Inlet Pump Station Structure 175.382,05<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 2<br />

/ 19.11.2008 16:31 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

27


Building database<br />

Collecting and sorting data<br />

<strong>The</strong> most important capital in a company<br />

is its experience. <strong>The</strong> database of<br />

construction projects is a central memory<br />

to store your experience.<br />

<strong>The</strong> data is organised according to subject<br />

areas (specification manuals). You<br />

can compare the same items used for<br />

different projects easily and quickly. You<br />

can access all available data from all<br />

<strong>AUER</strong> <strong>Bausoftware</strong>'s modules.<br />

Different data sources<br />

<strong>The</strong> data can come from different sources<br />

e.g. from specification catalogues,<br />

calculations or from memory media of<br />

the respectively applicable standard.<br />

<strong>The</strong> programme extracts the hourly<br />

rates from the calculations and the<br />

results from the post-calculations directly<br />

from the controlling modules. You can<br />

also enter other data manually.<br />

Manage your knowledge<br />

<strong>The</strong> circle is complete<br />

During the calculations, you can download<br />

results from the post-calculations<br />

and pre-calculations. You can see in<br />

which projects the item in question has<br />

already been calculated or post-calculated.<br />

<strong>The</strong> data circuit is complete.<br />

Processing template for an item<br />

28


At a glance<br />

■ Central memory for prices and<br />

hourly rates<br />

■ Direct access to calculations and<br />

specification catalogues lists<br />

■ Import of prices via the respectively<br />

valid standardised interface<br />

■ Transferral of hourly recalculations<br />

from Controlling (module<br />

"Controlling" required)<br />

■ Selection of data according to project<br />

criteria<br />

■ Transferral of the selected prices in<br />

the specification catalogues<br />

List representation of an item<br />

for price estimates<br />

<strong>The</strong> prices in a database enquiry can be<br />

transferred to a specification catalogue.<br />

This module will become your tool for<br />

cost estimation, because it enables you<br />

to directly compare prices with items<br />

in different projects. <strong>The</strong> construction<br />

database is a neutral data basis for the<br />

comparison of prices of similar projects.<br />

Memory for prices for the calculation<br />

of prime contractor projects<br />

<strong>The</strong> calculation for prime contractor projects<br />

is dependent, to a great degree,<br />

on price experience resulting from<br />

similar projects. <strong>The</strong> programme's price<br />

classification system enables you to<br />

compare the projects with each other.<br />

29


Construction schedule<br />

Simple Project Management<br />

Project management is simpler than<br />

ever before with <strong>AUER</strong> Success. You<br />

simply draw your calendar with your<br />

mouse in the same way you did before<br />

with a pencil on paper - only considerably<br />

quicker.<br />

<strong>The</strong> processes shown are defined by<br />

start date and duration. Every process<br />

can be linked to each other.<br />

Work schedule<br />

Using the calendar you can quickly<br />

and easily see your days off work. <strong>The</strong><br />

construction schedule can be implemented<br />

according to the calendar or the<br />

working days.<br />

Entry in tabular form and graphical processing<br />

Resources<br />

You can equip every stage with up to 16<br />

resources. <strong>The</strong> three resources from the<br />

fix programmes - hours, turnover and<br />

costs are taken from the construction<br />

invoices and calculations. With a few<br />

pieces of data, you can create a link<br />

between the spread sheet (construction<br />

schedule) and the quantity calculations<br />

(invoice). <strong>The</strong> resource plan is automatically<br />

updated.<br />

Processing layouts and print options<br />

You can save a number of different processing<br />

layouts and print options which<br />

can also be recreated at any time. <strong>The</strong><br />

plan can be printed using a plotter or a<br />

normal printer. If the plan is too big for<br />

your printer, you can print it in sections.<br />

If required, the construction schedule<br />

can be saved as a graphic file and<br />

exported to another programme.<br />

Integrated resource planning<br />

You can update your resource planning<br />

at the touch of a button when changing<br />

the quantity calculations, invoicing or<br />

basis for calculations. You do not even<br />

need an interface programme. You can<br />

incorporate the files concerning the<br />

construction invoice and the calculation<br />

into the construction schedule.<br />

30


Assessment of suppliers<br />

Construction schedule<br />

at a glance<br />

Finding the right supplier (subcontractor)<br />

for an open contracted service is<br />

not just a question of a well looked<br />

after address database. In addition to<br />

the price, other qualitative factors are<br />

becoming more and more significant.<br />

Documenting and cultivating a relationship<br />

between you and your supplier is<br />

also becoming increasingly important.<br />

A modern supplier management system<br />

therefore has to offer information about<br />

the quality of work offered by a supplier<br />

i.e. how well the work is carried out,<br />

punctuality, co-operation during the offer<br />

phase etc.<br />

Project specific assessment<br />

At first the assessment is project specific.<br />

Every supplier working on a certain<br />

project will be awarded a grade from 1<br />

to 5. Various performance criteria will be<br />

taken into account.<br />

<strong>The</strong> result is taken from the average<br />

scores awarded for the list of criteria.<br />

Once the project has been completed,<br />

and subsequently the assessment, you<br />

can transfer the entire supplier assessment<br />

to the address specific assessment.<br />

Address specific assessment<br />

If you have opened the address<br />

management module, which is under<br />

"Branches", you can see the supplier<br />

assessments ordered according to their<br />

address. Here, you can compare every<br />

supplier belonging to a certain address,<br />

according to their assessment result.<br />

This then creates a total assessment<br />

result.<br />

■ Free or networked spreadsheet<br />

■ Progress supervision<br />

■ Target/actual comparison<br />

■ Turnover and cost planning<br />

■ Liquidity planning<br />

■ Resource planning<br />

■ Interface to specification catalogue,<br />

calculations and quantity<br />

determination<br />

■ Project calendar<br />

■ Data exchange with MS-Excel and<br />

MS-Project<br />

Assessment of suppliers<br />

at a glance<br />

■ Project specific supplier assessment<br />

■ Supplier assessments are exportable<br />

in MS-Excel format<br />

■ Assessments can be read in according<br />

to the supplier's address<br />

■ Total assessment of all suppliers of<br />

a project<br />

Assessed projects according to a supplier's address<br />

31


32<br />

Construction. <strong>AUER</strong> Success NG modules are specially<br />

designed for the requirements of the <strong>building</strong> sector


<strong>AUER</strong> Success NG is the comprehensive<br />

solution for the construction<br />

industry and <strong>building</strong> subcontractors.<br />

This construction engineering<br />

software supports your company<br />

processes, is scalable and can be<br />

quickly and easily integrated in your<br />

working processes.<br />

<strong>AUER</strong> Success NG provides extensive<br />

functionalities for tenders, cost planning,<br />

order management, bookkeeping,<br />

project handling and personnel<br />

management.<br />

<strong>AUER</strong> Success NG was developed and<br />

preconfigured for the requirements<br />

of the construction sector. Only your<br />

company-specific settings must<br />

still be introduced. <strong>The</strong> installation<br />

requires only a few minutes, and a<br />

complete introduction, which includes<br />

the transfer of old data, can be carried<br />

out within a few days. This helps<br />

you to save time, money and nerves.<br />

<strong>The</strong> simple, intuitive user interface<br />

reduces training requirements to a<br />

minimum. You can put your trust in<br />

more than 15 years of experience<br />

and more than 12,000 installed solutions.<br />

33


Calculation<br />

Simple and highly effective<br />

Calculations are of strategic importance<br />

for construction companies. Precision<br />

and speed decide on who the order will<br />

be awarded. Our software which was<br />

developed through everyday practice in<br />

construction calculations supports you in<br />

all calculatory and pricing phases.<br />

Time-saving<br />

<strong>The</strong> bill of quantities forms the basis<br />

and is normally submitted according to<br />

applicable standards on a data medium.<br />

You will only need a few minutes to read<br />

in the bill of quantities and produce a<br />

corresponding trial calculation.<br />

Flexible calculation<br />

Variable calculatory approaches are<br />

used for adapting cost estimates of<br />

a project to concrete facts. <strong>The</strong> programme<br />

can recalculate the entire<br />

calculation in just a few seconds. Highly<br />

optimised searching functions help you<br />

to select items by numbers or text fragments.<br />

One or two syllables are enough<br />

for finding the required material.<br />

<strong>The</strong> most important items come first<br />

ABC analyses sharpen the eye for<br />

important details. <strong>The</strong> most important<br />

positions and materials, and the correspondingly<br />

decisive hourly rates, can<br />

be found quickly and without problems.<br />

<strong>The</strong> ABC analysis has been designed<br />

as an interactive table. This means<br />

that you will be supported in an optimal<br />

manner when revising your calculations.<br />

In combination with our standard calculations<br />

and at the push of a button you<br />

will receive a checklist of all important<br />

calculatory options.<br />

Offers are ready for submission in just a few minutes.<br />

Data exchange<br />

Numerous analyses<br />

<strong>The</strong> provided data interfaces which conform<br />

to country-specific standards allow ■ Overviews of hours and costs<br />

make project handling easier.<br />

to exchange data with your contract ■ Material extracts<br />

partners in a standardised format. As ■ Shopping basket<br />

an option, added data interfaces can be ■ Workgroup price comparisons<br />

made available, such as a CSV format ■ Requests for quotes<br />

for MS-Excel.<br />

■ Checklists<br />

■ ABC analyses<br />

Unlimited information<br />

Project-oriented adaptations<br />

<strong>The</strong> end of a calculation does not only You can easily access previously prepared<br />

calculations, quickly making the<br />

consist of determining the costs. All<br />

required printouts, from K1 up to and necessary adaptations for the current<br />

including the K8 sheets and a bill of project. With modern hardware, a new<br />

quantities, are ready for submission or calculation only takes a few seconds.<br />

can be sent directly as an e-mail.<br />

34


At a glance<br />

Comp.: <strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Price basis:<br />

PRICING -K7<br />

Project: WWTP Sevlievo<br />

Item number Item key word BoQ-quant. u. IVCC<br />

Res.-number Calculation figure / Resources denotation Result Cost/u. Wage (EUR) Other (EUR) Unit price (EUR)<br />

03 WWTP Sevlievo<br />

03.01.00.00 Inlet Pump Station Structure<br />

03.01.00.01 Excavation 1.438,00 m3<br />

L33 1 ;Wages, canal construction 1,0000 h 31,000<br />

31,0000 31,000<br />

115,2879 230,576<br />

M01030 2 ;CEM I 32.5 R, free of C3A, HS, loose 2,0000 t 230,576<br />

1,0000 4,000<br />

L9890 4 ;Gestion Technical Management 4,0000 EUR 3,960 0,040<br />

1,0000 6,004<br />

M01099E 6,004 ;Cement, general 6,0040 EUR 6,004<br />

271,58<br />

Production costs 34,96 236,62<br />

overhead<br />

03.01.00.01 Excavation Unit price per m3 1,0000 h 34,96 236,62 271,58<br />

1.438,00 m3 1.438,0000 h 50.272,48 340.259,56 390.532,04<br />

03.01.00.02 Backfilling 426,00 m3<br />

L9890 34,66 ;Gestion Technical Management 34,6600 EUR 34,313 0,347<br />

1,0000 34,660<br />

34,66<br />

Production costs 34,31 0,35<br />

overhead<br />

03.01.00.02 Backfilling Unit price per m3 34,31 0,35 34,66<br />

426,00 m3 14.616,06 149,10 14.765,16<br />

03.01.00.03 Sheet Piles<br />

03.01.00.04 Driving a. extraction 597,00 m2<br />

L9890 23,05 ;Gestion Technical Management 23,0500 EUR 22,820 0,231<br />

1,0000 23,050<br />

23,05<br />

Production costs 22,82 0,23<br />

overhead<br />

03.01.00.04 Driving a. extraction Unit price per m2 22,82 0,23 23,05<br />

597,00 m2 13.623,54 137,31 13.760,85<br />

03.01.00.05 Lean Concrete 10 cm C8/10 194,00 m2<br />

L9890 136,56 ;Gestion Technical Management 136,5600 EUR 135,194 1,366<br />

1,0000 136,560<br />

136,56<br />

Production costs 135,19 1,37<br />

overhead<br />

03.01.00.05 Lean Concrete 10 cm C8/10 Unit price per m2 135,19 1,37 136,56<br />

194,00 m2 26.226,86 265,78 26.492,64<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />

/ 19.11.2008 16:39 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

■ Master record administration for<br />

wages, materials, equipment and<br />

activities<br />

■ Generation of the calculation<br />

■ Global variables for projects<br />

■ Direct access to calculations<br />

■ Fulltext search in master records,<br />

positions, projects, etc.<br />

■ K-sheets, incl. K1, K4, K5, K7<br />

and K8<br />

■ Price synchronisation and price<br />

allocation, including logging<br />

■ ABC analyses by bill of quantities,<br />

wages, materials, equipment and<br />

hours<br />

■ Exchange rate conversion<br />

■ Creation and editing of bill of<br />

quantities<br />

■ Data media exchange in conformity<br />

with the applicable country-specific<br />

standards and also via MS Excel<br />

Each position shows a detailed calculation.<br />

Shopping basket<br />

<strong>The</strong> shopping basket contains all of<br />

the operating resources used in the<br />

project. <strong>The</strong> quantities of the individual<br />

resources are added up. <strong>The</strong> shopping<br />

basket forms the basis for procurement<br />

and makes historical costing possible.<br />

Calculation overview<br />

Here all cost-relevant data of the calculation<br />

are shown for each position in<br />

a table. This table has been designed<br />

with a browser function. Detailed data<br />

in this table can be edited at any time.<br />

This calculation overview is the control<br />

centre where all the data of the calculation<br />

is collected and condensed<br />

A tool for free markets<br />

A calculation is often only the basis for<br />

pricing. <strong>The</strong> process of synchronising<br />

prices and preparing the final price<br />

offer is carried out in a control centre.<br />

This makes it possible to keep control<br />

of the delivered price and the estimated<br />

invoicing amounts at all times. All<br />

relevant prices and quantities for each<br />

position have their impact here.<br />

Exchange rate conversion<br />

<strong>The</strong> calculation of costs is possible in<br />

various currencies. Each amount can<br />

be immediately displayed in a second<br />

currency, with just a single mouse<br />

click.<br />

35


Standard calculation / recommended prices<br />

<strong>The</strong> best calculation programme can<br />

only develop its capacities in combination<br />

with the know-how of the user. A<br />

standard calculation represents a database<br />

that provides you with support. An<br />

optimal use of high-performance calculatory<br />

software is unthinkable without<br />

corresponding master data.<br />

A standard bill of quantities should be<br />

available for each standard calculation.<br />

<strong>The</strong> process chain, which proceeds<br />

from a tender with a standard bill of<br />

quantities, via data media exchange<br />

and calculations for the presentation of<br />

an offer via data media, must ensure<br />

optimised and rationalised working procedures.<br />

Push-of-the-button project calculations<br />

Standard calculation <strong>building</strong> construction<br />

36


At a glance<br />

Available standard calculations<br />

<strong>The</strong> standard calculations are available<br />

in the current versions of the bill of<br />

quantities.<br />

Read-in of recommended prices<br />

Recommended prices that, depending<br />

on the market situation, are indicated<br />

as being appropriate by pricing authorities,<br />

are made available to you as data<br />

in <strong>AUER</strong> <strong>SuccessNG</strong>. You can read in<br />

such recommended prices as a part of<br />

the preparation of a tender. <strong>The</strong> entire<br />

process only takes a few seconds.<br />

We offer content<br />

Besides numerous programme<br />

modules, our software also offers extensive<br />

content. Standard calculations<br />

and recommended price data can be<br />

purchased from us, depending on your<br />

requirements. High-quality data makes<br />

smooth and above all time-effective<br />

working procedures possible. <strong>The</strong> data<br />

is prepared by experts in the field (for<br />

instance cost calculators of construction<br />

projects) and is always up to date. Our<br />

content provides the heart of the quality<br />

of our software solutions. That is why<br />

<strong>AUER</strong> emphasises high-quality databases<br />

which meet the particular requirements<br />

of our customers.<br />

■ Structure in line with the applicable<br />

standard BOQ<br />

■ Flexible due to variable performance<br />

approaches<br />

■ Pricing security as a result of<br />

detailed costing<br />

■ Uniform master data records for:<br />

- Wages and salaries<br />

- Equipment<br />

- External services<br />

- Equipment<br />

- Activities and procedures<br />

■ Maximal support through the many<br />

features of <strong>AUER</strong> <strong>SuccessNG</strong><br />

■ Predefined construction type codes<br />

for recalculation of worked hours<br />

■ Maintenance contract for continuous<br />

updating and adaptation to new<br />

bill of quantities<br />

■ Recommended price database for<br />

cost estimates<br />

a<br />

Item catalog from the<br />

Austrian government<br />

Item catalog from the<br />

Austrian government<br />

Building construction<br />

LB-Hochbau<br />

Baumeisterarbeiten (LG1-20)<br />

Schwarzdeckerarbeiten (LG21)<br />

Asphaltierungsarbeiten (LG26)<br />

Fänge (LG35)<br />

Zimmermeisterarbeiten (LG36)<br />

Trockenausbau (LG39)<br />

Wärmedämmung (LG44)<br />

LB-Flußbau<br />

Underground construction<br />

LB-Siedlungswasserbau<br />

LB-Verkehrsinfrastruktur<br />

Brückenbau<br />

Eisenbahnbau<br />

Strassenbau<br />

Tunnelbau<br />

LB-Holzbau<br />

37


Gross average wage<br />

<strong>The</strong> basis for every calculation<br />

A precise value of the average wage<br />

is the basis of every good calculation.<br />

Depending on the composition of the<br />

team that works on the construction<br />

site, substantial differences in the gross<br />

average wage are possible. A simple<br />

and quick tool for calculating or checking<br />

the average wage is necessary.<br />

<strong>The</strong> applicable standard provides an<br />

average wage rate for the calculation<br />

of the K2, K3, K3A and K3R calculation<br />

forms. <strong>The</strong> calculation procedure<br />

is substantially speeded up by <strong>AUER</strong><br />

Success NG .<br />

<strong>The</strong> programme module for calculating<br />

the gross average wage, which is provided<br />

by <strong>AUER</strong> Success NG , is recommended<br />

by the Austrian Standards Institute.<br />

MITTELLOHNPREIS<br />

X Firma<br />

FORMBLATT K 3<br />

REGIELOHNPREIS<br />

Seite:<br />

Erstellt am:<br />

GEHALTPREIS<br />

01.05.2007<br />

1<br />

Bau:<br />

Preisbasis laut Angebotsunterlagen<br />

FÜR MONTAGE<br />

X<br />

FÜR VORFERTIGUNG<br />

EUR<br />

Angebot Nr<br />

Währung:<br />

Beschäftigungsgruppe laut KV. Baugewerbe u. Bauindustrie ab 01.05.2007<br />

KV-Gruppe: IIa IIb IIIb IIIc IVa IVb<br />

Kalkulierte Beschäftigte [Anzahl] 10<br />

Kalkulierte Wochenarbeits-Zeit [h] 42,0<br />

11,72 10,68 10,42 10,19 8,17 9,08<br />

KV-Lohn<br />

Anteil in % 20,00 20,00 30,00 20,00 10,00<br />

= 100%<br />

100,00% 50,00% 3,00h Aufzahlung für Mehrarbeit: h % h<br />

% Betrag<br />

9,82<br />

A Kollektivvertraglicher MITTELLOHN - REGIELOHN - GEHALT<br />

100,00<br />

B Umlage unproduktives Personal % von A<br />

C Zulagen aus Zusatzkollektivverträgen % von A + B<br />

9,82<br />

(A+B= )<br />

D Überkollektivvertraglicher Mehrlohn % von A + B<br />

10,00 0,98<br />

E Aufzahlung für Mehrarbeit % von A + B<br />

4,64 0,46<br />

F Aufzahlung für Erschwernisse % von A + B<br />

9,00 0,88<br />

G Andere abgabenpflichtige Lohnbestandteile % von A + B<br />

H MITTELLOHN - REGIELOHN - GEHALT 123,63 12,14<br />

(% = Betrag H *100 / Betrag A) (Betrag = A bis G)<br />

I Andere nicht abgabenpflichtige Lohnbestandteile % von H<br />

19,34 2,35<br />

J Direkte Lohnnebenkosten % von H<br />

26,90 3,27<br />

K Umgelegte Lohnnebenkosten % von H<br />

80,44 9,77<br />

L Andere lohngebundene Kosten % von H<br />

25,30 3,07<br />

311,61 30,60<br />

M MITTELLOHN - REGIELOHN - GEHALT - KOSTEN (% = M * 100 / A) (Betrag = H bis L)<br />

Gesamtzuschlag in % auf: Gerät Material Fremdl. Lohn/Gehalt<br />

N Geschäftsgemeinkosten<br />

7,000 7,000 7,000 7,000<br />

O Bauzinsen<br />

2,000 2,000 2,000 2,000<br />

P Wagnis<br />

2,000 2,000 2,000 2,000<br />

Q Gewinn<br />

2,040 2,040 2,040 2,040<br />

R<br />

S Summe (%) N bis R<br />

13,040 13,040 13,040 13,040<br />

(% auf<br />

T Gesamtzuschlag: S*100/(100-S) % 14,995 14,995 14,995 14,995 15,00 4,59<br />

M)<br />

U MITTELLOHN - REGIELOHN - GEHALT - PREIS (% = U * 100 /A) (Betrag = M + T) 358,35 35,19<br />

V<br />

In Sonderfällen: Umlage der Baustellengemeinkosten auf Leistungsstunden<br />

auf MLP - RLP - GP (Baustellen-Gemeinkosten / h = Betrag in V)<br />

Umgelegt sind:<br />

W MLP - RLP - GP mit Umlage der Gemeinkosten (% = W * 100 / A) (Betrag = U + V)<br />

In Sonderfällen: Umlage auf Preisanteile in % Lohn Sonstiges<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

X UMLAGEPROZENTSATZ<br />

Summe 1 bis 6<br />

Processing is carried out directly<br />

in an ÖNORM form (a form<br />

that conforms to the Austrian<br />

standard). All calculations are<br />

carried out immediately.<br />

Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

Standard form sheets K1 to K3<br />

When a team is set up, you can use<br />

function keys to call up the corresponding<br />

collective wages. <strong>The</strong> direct and<br />

separately calculated social contributions<br />

are entered into your own tables<br />

and transferred to the K2 sheet.<br />

<strong>The</strong> basic settings are stored each time<br />

you create a new sheet so that a quick<br />

generation of new K sheets is possible.<br />

Whenever you need this data, you simply<br />

upload the sheet from any available<br />

project.<br />

Old to new<br />

■ <strong>The</strong> situation: Because of habit, or<br />

because of a more transparent way<br />

of calculating, you usually prefer to<br />

use the old form sheets.<br />

■ <strong>The</strong> problem: You need a new K3<br />

sheet for the calculation of an average<br />

wage.<br />

■ <strong>The</strong> solution: With <strong>AUER</strong> <strong>SuccessNG</strong><br />

you convert old K sheets (K2, K3,<br />

K3A) into a new K3 form that conforms<br />

to the valid standard.<br />

38


EF-sheets<br />

EFB – Preis 1a<br />

Name des Bieters<br />

Baumaßnahme<br />

WWTP Sevlievo<br />

Das der Kalkulationsmethode des Bieters entsprechende EFB-Preis 1a oder 1b ist mit dem Angebot abzugeben;<br />

es wird nicht Vertragsbestandteil. <strong>Die</strong> Nichtabgabe kann dazu führen, daß das Angebot nicht berücksichtigt wird.<br />

Zuschlag in %<br />

1. Angaben über den Kalkulationslohn<br />

Betrag / h<br />

vom ML<br />

1.1 Mittellohn ML<br />

1 2<br />

einschl. - Lohnzulagen, Lohnerhöhungen, wenn keine Gleitklausel vereinbart wird.<br />

1) 1)<br />

- Poliere In ML Im Zuschlag gemäß Nr. 2.<br />

1.2 Sozialkosten gesetzlich, tariflich, freiwillig<br />

1.3 Lohnnebenkosten Auslösungen, Fahrgelder usw.<br />

2)<br />

1.4 Sonstiges<br />

Kalkulationslohn<br />

2. Zuschläge auf die Einzelkosten der Teilleistungen = unmittelbare Herstellungskosten<br />

Zuschläge in % auf<br />

Nachunternehmerleistungen<br />

Lohn Stoffkosten Gerätekosten<br />

2.1 Baustellengemeinkosten<br />

1 2 3 4<br />

Soweit hierfür nicht besondere Ansätze im LV vorgesehen sind.<br />

- Baustelleneinrichtung einschl. Unterkunft, Energie, Bewachung,<br />

Hilfslöhne, Hilfsstoffe, Werkzeuge und Kleingeräte, Materialkosten<br />

für Baustelleneinrichtung<br />

- Pachtung, Wege, Verkehrsregelung usw.<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

- Gehälter für Bauleitung, Abrechung usw.<br />

- Sonderkosten der Baustelle<br />

Baustellengemeinkosten insgesamt<br />

2.2 Allgem. Geschäftskosten<br />

Angaben zur Preisermittlung bei Zuschlagskalkulation<br />

3)<br />

Datum<br />

Angebot für<br />

05.12.2008<br />

EFB price 2 – breakdown of important UPs<br />

WWTP Sevlievo<br />

At a glance<br />

■ Creation of calculation sheets in<br />

conformity with country-specific<br />

standards<br />

■ Automatic conversion of old K<br />

sheets into the new K3 sheet format<br />

■ Wage tables with collective agreement<br />

wages<br />

■ Calculation of project-specific<br />

values for direct and allocated<br />

social security contributions<br />

■ Integration with the calculation project<br />

■ EF sheets for gross average wage<br />

calculation in Germany<br />

2.3 Wagnis und Gewinn<br />

2.4 Gesamtzuschläge<br />

3. Ermittlung der Angebotssumme<br />

3.1 Eigene Lohnkosten Kalkulationslohn x Gesamtstunden<br />

X<br />

3.2 Kosten für Stoffe und Bauhilfsstoffe<br />

3.3 Kosten für Geräte, Energie und Betriebsstoffe<br />

3.4 Nachunternehmerleistungen<br />

Summe der unmittelbaren Herstellungskosten<br />

Angebotssumme ohne Umsatzsteuer<br />

Eventuelle Erläuterungen des Bieters<br />

Object line Short name u. Time estimation<br />

Wage Other Offered UP<br />

Einzelkosten der Zuschläge Angebotssumme<br />

Teilleistungen<br />

gem. 2.4<br />

= unmittelbare<br />

%<br />

(Betrag)<br />

Herstellungskosten<br />

03.01.00.01 Excavation m3 1,00<br />

35,00 236,58 271,58<br />

Backfilling 03.01.00.02 m3<br />

34,66 34,66<br />

Driving 03.01.00.04 a. extracrtion m2<br />

23,05 23,05<br />

Lean Sauberkeit 03.01.00.05 Concrete 10 cm C8/10 m2<br />

136,56 136,56<br />

03.01.00.07 Concrete Base Slab m3<br />

17,33 3,00 20,33<br />

Reinforcement 120 kg/m³ 03.01.00.08 kg<br />

34,66 2,00 36,66<br />

1) 2) 3)<br />

Zutreffendes ankreuzen Vom Bieter zu erläutern ggf. nicht aufgegliedert<br />

03.01.00.09 Formwork BS m2<br />

40,38 5,00 45,38<br />

03.01.00.10 Walls Ground floor m3<br />

28,94 1,00 29,94<br />

Printed with <strong>AUER</strong> 03.01.00.11 Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

Reinforcement 120 kg kg<br />

32,58 4,00 36,58<br />

03.01.00.12 Formw. walls m2<br />

55,46 3,00 58,46<br />

EF sheets for<br />

gross average wage<br />

calculation in Germany<br />

03.01.00.14 Concrete Ceilling m3<br />

45,00 45,00<br />

Reinforcement 03.01.00.15 120 kg kg<br />

20,35 20,35<br />

Formwork cellar 03.01.00.16 Ceilling m2<br />

15,10 15,10<br />

Brick 03.01.00.17 Walls 25 cm m2<br />

112,10 112,10<br />

03.01.00.18 Ceilling above Ground floor m3<br />

12,21 12,21<br />

Reinforcement 03.01.00.19 120 kg kg<br />

48,60 48,60<br />

Formwork 03.01.00.20 m2<br />

29,30 29,30<br />

Attika high 03.01.00.21 20 cm ,60 cm m2<br />

Project: C:\BS4\DAT\Demoprojekt in English_1 Page: 1<br />

/ 05.12.2008 08:34 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

Information on pricing is also possible<br />

with:<br />

■ Markup calculations<br />

■ Calculation via totals<br />

■ Services of the installation trade<br />

■ Performances of mechanical engineering<br />

and electronic industry<br />

Printing EF sheets<br />

Specially selected EF sheets (sheets for<br />

calculating gross average wages) can<br />

be printed out separately. In addition,<br />

the possibility exists of printing out a<br />

list showing a breakdown of unit prices.<br />

<strong>The</strong> scope of such a print order can<br />

be limited to several areas of the bill of<br />

quantities.<br />

39


Resources - search and replace<br />

Automated replacement<br />

In practice it often occurs that the<br />

operating resources of a project<br />

or a standard calculation must be<br />

replaced in all calculations.<br />

Definition of the operating resources to be replaced<br />

In practice it often occurs that the<br />

operating resources of a project<br />

or a standard calculation must be<br />

replaced in all calculations.<br />

With this module you can create a<br />

clearly structured list which shows<br />

the old operating resources and<br />

the resources with which they<br />

were replaced. In another list you<br />

can define which projects will be<br />

impacted by this replacement<br />

action.<br />

This exchange can be started,<br />

after the programme has checked<br />

the feasibility, after which all calculations<br />

will be updated.<br />

Results protocol of the exchange<br />

40


Quick-Price<br />

Recources search and<br />

replace at a glance<br />

■ Definition of the operating resources<br />

to be replaced<br />

■ Definition of the project impacted<br />

by the exchange<br />

■ Plausibility test by the programme<br />

<strong>The</strong> fast way to a correct offer price<br />

Simple pricing<br />

For subcontractors in the <strong>building</strong> industry,<br />

and also in case of smaller offers, an<br />

extensive calculation is frequently not<br />

required. Often a simple and quick entry<br />

of data is much more important.<br />

Quick data entry<br />

<strong>The</strong> price components are entered into<br />

a clearly structured table. <strong>The</strong> share<br />

of labour costs can be optionally calculated<br />

by entering the expected time<br />

expenditure per unit and an average<br />

price. If you own the calculation module<br />

as well, then both modules can be used<br />

in combination.<br />

You calculate the most important positions<br />

and then supplement the remaining<br />

prices in your module Quick-Price.<br />

Quick-Price<br />

at a glance<br />

■ Quick entry of prices<br />

■ Optional calculation of the share of<br />

labour costs, for the expected time<br />

period and average wage<br />

41


Planning<br />

Proper controlling already before the<br />

start of construction works<br />

In connection with invoicing of construction<br />

services and controlling you are<br />

able to use an easy-to-use tool for<br />

the calculation of profit forecasts. By<br />

assigning important positions and item<br />

groups to corresponding time periods, a<br />

calculatory preparation of planning data<br />

is made possible.<br />

<strong>The</strong> solution<br />

A bar chart which focuses on the primary<br />

construction services provides<br />

you with the required information. You<br />

can enter time bars into the flowchart<br />

for important positions or item groups.<br />

This enables the assignment of performance<br />

units to construction months as<br />

well. Depending on the strength of the<br />

bar the programme assigns the performance<br />

aliquot to the corresponding<br />

construction months.<br />

Time-weighted diagrams<br />

In combination with an advance scheduling,<br />

the development of turnover can be<br />

calculated from the bill of quantities.<br />

<strong>The</strong> budget<br />

<strong>The</strong> initial planning is created immediately<br />

after the order has been assigned.<br />

This forms the budget for the construction<br />

site.<br />

Costs, turnover and working hours are<br />

presented as a table. <strong>The</strong> processing<br />

of data in other information systems is<br />

enabled by means of ASCII data transfer.<br />

Planning of turnover and costs<br />

42


At a glance<br />

■ Complete data integration, including<br />

invoicing, calculation and controlling<br />

■ Assignment of performance items<br />

Profit forecast<br />

Further information is obtained during<br />

the execution of the construction<br />

works. <strong>The</strong> actually performed services<br />

are registered during the invoicing for<br />

construction works which are queried on<br />

each key date.<br />

<strong>The</strong> accumulated costs are transmitted<br />

by the programme from cost accounting<br />

in the form of a table.<br />

With this additional information, you<br />

have the possibility of calculating subsequent<br />

plans (profit forecasts) on a<br />

monthly basis. With reference to the initial<br />

planning, all recognisable changes<br />

in costs and turnover are extrapolated<br />

to the end of the construction works.<br />

to time periods by use of bar charts<br />

■ Budgeting of turnover, costs and<br />

working hours<br />

■ Forecast calculations for costs,<br />

turnover and working hours, in<br />

connection with the invoicing of<br />

construction works and actually<br />

registered costs.<br />

■ Direct import of performances from<br />

the settlement of accounts<br />

■ Data export of planning data via<br />

ASCII data media<br />

■ Printout of bar charts<br />

Required programming modules:<br />

- Invoicing<br />

- Calculation<br />

- Controlling<br />

Data exchange<br />

Planning data for budgeting (initial<br />

planning) and forecast calculations can<br />

be read out optionally onto data media,<br />

which can then be processed in your<br />

management information systems.<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

prelim. planing (EUR)<br />

WWTP Sevlievo<br />

section Projekt<br />

cost center:1<br />

20.000<br />

Cost- sales monthly<br />

20.000<br />

Cover monthly<br />

17.500<br />

17.500<br />

15.000<br />

15.000<br />

12.500<br />

12.500<br />

10.000<br />

10.000<br />

7.500<br />

7.500<br />

5.000<br />

5.000<br />

2.500<br />

2.500<br />

Apr 2006<br />

Mai 2006<br />

Jun 2006<br />

Jul 2006<br />

Aug 2006<br />

Sep 2006<br />

Okt 2006<br />

Nov 2006<br />

Dez 2006<br />

Jän 2007<br />

Feb 2007<br />

Mar 2007<br />

Apr 2007<br />

Mai 2007<br />

Jun 2007<br />

Apr 2006<br />

Mai 2006<br />

Jun 2006<br />

Jul 2006<br />

Aug 2006<br />

Sep 2006<br />

Okt 2006<br />

Nov 2006<br />

Dez 2006<br />

Jän 2007<br />

Feb 2007<br />

Mar 2007<br />

Apr 2007<br />

Mai 2007<br />

Jun 2007<br />

Cost Turnover Values in 1000<br />

Values in 1000<br />

200.000<br />

Cost- sales sum<br />

200.000<br />

Sum amount of coverage<br />

175.000<br />

175.000<br />

150.000<br />

150.000<br />

125.000<br />

125.000<br />

100.000<br />

100.000<br />

75.000<br />

75.000<br />

50.000<br />

50.000<br />

25.000<br />

25.000<br />

Apr 2006<br />

Mai 2006<br />

Jun 2006<br />

Jul 2006<br />

Aug 2006<br />

Sep 2006<br />

Okt 2006<br />

Nov 2006<br />

Dez 2006<br />

Jän 2007<br />

Feb 2007<br />

Mar 2007<br />

Apr 2007<br />

Mai 2007<br />

Jun 2007<br />

Apr 2006<br />

Mai 2006<br />

Jun 2006<br />

Jul 2006<br />

Aug 2006<br />

Sep 2006<br />

Okt 2006<br />

Nov 2006<br />

Dez 2006<br />

Jän 2007<br />

Feb 2007<br />

Mar 2007<br />

Apr 2007<br />

Mai 2007<br />

Jun 2007<br />

Cost Turnover Values in 1000<br />

Values in 1000<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 5<br />

/ 19.11.2008 16:41 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

43


Quantity surveying / invoice<br />

On-time invoicing<br />

An on-time invoicing is indispensable for<br />

the commercial success of a construction<br />

project.<br />

<strong>The</strong> volume calculations are prepared<br />

during the execution of the construction<br />

works on measurement sheets.<br />

<strong>The</strong> volume calculation is prepared<br />

either as free text, which is supported<br />

by a collection of approximately 170<br />

formulas, or directly in the invoice. Each<br />

formula is explained by means of an<br />

illustration.<br />

If necessary, these can be transferred<br />

directly to the measurement sheet for<br />

further editing. In addition to formulas<br />

for applicable standards, a number of<br />

other practical formulas are provided,<br />

such as for instance trench dimensions<br />

and asphalt volumes by stages.<br />

Flexible tool<br />

<strong>The</strong> variables that are used in the freetext<br />

formulas provide a flexible tool<br />

which can be used for the automation of<br />

frequent recurring invoicing situations.<br />

All analyses, including the final invoice,<br />

can be created from these volume calculations<br />

by the programme. A change<br />

in the measurement sheet is automatically<br />

updated in all linked items.<br />

Sketches provide a perfect documentation<br />

of the calculations. <strong>The</strong> integrated<br />

drawing assistant generates an appropriate<br />

drawing for each entered calculatory<br />

formula.<br />

Volume calculations are automated through the use of variables.<br />

Data import from the construction An automated solution is also available<br />

diary<br />

for price calculations, which are subject<br />

If you also maintain your construction to several index groups (such as for<br />

diary in <strong>AUER</strong> Success NG the volumes instance WWF). <strong>The</strong> required substantiation<br />

of the threshold value is made<br />

that are logged there can be automatically<br />

entered into the invoice. A new calculation<br />

or manual insertion is therefore<br />

available by a printout function.<br />

no longer required.<br />

Printing and administration of<br />

invoices<br />

Data exchange<br />

All possibilities that conform to the standard,<br />

taking into account all surcharges<br />

<strong>The</strong> provided data interfaces which conform<br />

to country-specific standards allow and discounts, are supported by the<br />

you to exchange data with your contract programme. Cover sheets for invoices<br />

partners in a standardised format. can be designed individually. You are<br />

supported in this way by a text processing<br />

system with numerous field func-<br />

Price recalculation<br />

By linking measured data to time periods,<br />

prices can be automatically recalment<br />

system enables a comfortable<br />

tions. <strong>The</strong> integrated invoice manageculated<br />

for invoicing, after index values management of invoices and received<br />

have been entered.<br />

payments.<br />

44


H<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Measurement sh. 0003<br />

WWTP Sevlievo<br />

Ground floor<br />

a=35 = 35,000<br />

b=34 = 34,000<br />

F=a*b = 1.190,000<br />

03 .0 1. 00.01 Excavation<br />

5*52*566,65 = 147.329,000 m3 * 271,58 = 40.011.609,82<br />

03 .0 1. 00.02 Backfilling<br />

5*45*456,13 = 102.629,250 m3 * 34,66 = 3.557.129,81<br />

03 .0 1. 00.04 Driving a. extraction<br />

F*1,2 = 1.428,000 m2 * 23,05 = 32.915,40<br />

03 .0 1. 00.07 Concrete Base Slab<br />

456+46+48+9-79/89 = 558,112 m3 * 20,33 = 11.346,42<br />

03 .0 1. 00.10 Walls Ground floor<br />

@012 Pyramide<br />

b<br />

Grundfläche<br />

a<br />

H<br />

±H = 15,000 ±a = 12,000 ±b = 15,300 * = 1,000<br />

918,000 m3 29,94 = * = 27.484,92<br />

03 .0 1. 00.14 Concrete Ceilling<br />

@011 Prisma<br />

b<br />

Grundfläche<br />

a<br />

Aereted Grit chamber<br />

BCC : WP : 004 IP : Checked : N<br />

Item number<br />

Item text<br />

Calc.of measurement Result u. Unit price Amount<br />

±H = 15,000 ±a = 156,000 ±b = 56,000 * = 1,000<br />

131.040,000 m3 656,00 = * = 85.962.240,00<br />

See Measurement sh. 0003.1<br />

Created 22.10.2008 for the contractor checked _ _ . _ _ . _ _ _ _ for the client<br />

/ 09.12.2008 11:05 Project: C:\BS4\DAT\Demoprojekt in English Printed with <strong>AUER</strong> Success Version 5.00 - FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

Measurement sheets with<br />

automatically prepared<br />

drawings<br />

At a glance<br />

■ Input of measurement sheets<br />

■ Volume import from the construction<br />

diary<br />

■ Formula catalogue for each valid<br />

standard, including more than 170<br />

formulas<br />

■ Graphic presentation of the formula<br />

catalogue and automatic preparation<br />

of sketches<br />

■ Numerous selection possibilities<br />

for recorded settlement volumes<br />

■ Price recalculation through indexing<br />

method, also for WWF<br />

■ Import of settlement data from<br />

other Success projects<br />

■ Data media exchange and data<br />

export according to the countryspecific<br />

standards<br />

■ E-mail transmission of zipped measurement<br />

sheets<br />

■ Selection of volume calculations by<br />

primary and supplemental orders<br />

Billing Address<br />

Invoice Nr. 00001<br />

Mondsee, 19.11.2008<br />

User:<br />

Invoice printing in one of the<br />

many printing formats<br />

Project<br />

WWTP Sevlievo<br />

Item number<br />

CL Item text<br />

Quantity u. Parts of price Item price<br />

03 .0 1. 00.01 Excavation<br />

Wa.: 34,96<br />

Ot.: 236,62<br />

77.512,500 m3 UP.: 271,58 EUR 21.050.844,75<br />

212,55 GBP 16.475.443,64<br />

03 .0 1. 00.02 Backfilling<br />

Wa.: 34,31<br />

Ot.: 0,35<br />

102.629,250 m3 UP.: 34,66 EUR 3.557.129,81<br />

27,13 GBP 2.783.987,65<br />

03 .0 1. 00.03 Sheet Piles<br />

03 .0 1. 00.04 Driving a. extraction<br />

Wa.: 22,82<br />

Ot.: 0,23<br />

1.615,000 m2 UP.: 23,05 EUR 37.225,75<br />

18,04 GBP 29.134,73<br />

03 .0 1. 00.05 Lean Concrete 10 cm C8/10<br />

Wa.: 135,19<br />

Ot.: 1,37<br />

1.020,000 m2 UP.: 136,56 EUR 139.291,20<br />

106,88 GBP 109.016,26<br />

03 .0 1. 00.07 Concrete Base Slab<br />

Wa.: 17,16<br />

Ot.: 3,17<br />

995,612 m3 UP.: 20,33 EUR 20.240,79<br />

15,91 GBP 15.841,45<br />

03 .0 1. 00.08 Reinforcement 120 kg/m³<br />

Wa.: 34,31<br />

Ot.: 2,35<br />

119,000 kg UP.: 36,66 EUR 4.362,54<br />

28,69 GBP 3.414,34<br />

03 .0 1. 00.09 Formwork BS<br />

Wa.: 39,98<br />

Ot.: 5,40<br />

125,000 m2 UP.: 45,38 EUR 5.672,50<br />

35,52 GBP 4.439,58<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 2<br />

/ 19.11.2008 16:56 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

45


Controlling<br />

Comparison of target and actual<br />

budget<br />

<strong>The</strong> data of the calculation represent<br />

the cost budget of the construction site.<br />

Due to the integration with the invoicing<br />

of construction works, actual costs and<br />

actual working hours are invoiced. By<br />

means of a permanent comparison of<br />

actual vs. target figures, deviations can<br />

be quickly recognised and analysed,<br />

while trends can be calculated in advance.<br />

<strong>The</strong> interaction between the data of the<br />

invoice, costing and cost accounting or<br />

registration of work hours result in two<br />

different controlling possibilities.<br />

<strong>The</strong> data for the target/actual comparison can be replaced by way of an integrated interface.<br />

Target/actual costs<br />

<strong>The</strong> assignment of costs is realised<br />

through an adaptation of calculated<br />

costs to commercial cost accounting.<br />

This allows a comparison with the<br />

results from cost accounting.<br />

After you have created the cost structure,<br />

you can calculate the volumes<br />

from the invoicing data for a cost comparison.<br />

An invoicing shopping basket is<br />

created for the accounted volumes.<br />

By assigning operating resources from<br />

the shopping basket to the costing<br />

structure of cost accounting, a comparison<br />

is achieved with calculated costs.<br />

Target/actual working hours<br />

Working hours are listed separately<br />

by a construction work code (BAS). A<br />

construction work code combines the<br />

same activities from different performance<br />

positions.<br />

Every time unit is already assigned<br />

a BAS number in the calculation. In<br />

combination with the invoiced measurements,<br />

the target working hours are<br />

charged according to the construction<br />

work code. By comparing these with the<br />

actual working hours you can carry out<br />

an analysis by area of activity.<br />

Recalculation of working hours<br />

<strong>The</strong> deviations, which are detected in<br />

comparing the target against the actual<br />

working hours, are processed by running<br />

a recalculation..<br />

Cost allocation follow-up<br />

<strong>The</strong> impact of cost allocations is transparent<br />

at all times. A separate analysis<br />

can be made for providing an overview<br />

of the allocations on the calculation.<br />

46


At a glance<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Speculation check<br />

WWTP Sevlievo<br />

Item no. Item key word I BoQ-quant. u. Spec.- quantity UP-difference Original QS-quant. Rem.quantity speculation Speculation total Deviation<br />

03 WWTP Sevlievo<br />

03.01.00.00 Inlet Pump Station Structure<br />

03.01.00.01 Excavation 1.438,00 m3 1.500,00 77.512,500 76.012,500 10,00 15.000 775.125 760.125<br />

03.01.00.03 Sheet Piles<br />

03.01.00.04 Driving a. extraction 597,00 m2 597,00 1.615,000 1.018,000 1 2 1<br />

03.01.00.05 Lean Concrete 10 cm C8/10 194,00 m2 194,00 1.020,000 826,000<br />

03.01.00.06 Concrete<br />

03.01.00.09 Formwork BS 98,00 m2 98,00 125,000 27,000<br />

03.01.00.10 Walls Ground floor 175,00 m3 175,00 0,000 -175,000<br />

03.01.00.11 Reinforcement 120 kg 14.708,00 kg 14.708,00 0,000 -14.708,000 -6 6<br />

03.01.00.12 Formw. walls 962,00 m2 962,00 84,000 -878,000<br />

03.01.00.13 Ceilling above cellar<br />

03.01.00.14 Concrete Ceilling 48,00 m3 48,00 0,000 -48,000<br />

03.01.00.15 Reinforcement 120 kg 5.734,00 kg 5.734,00 0,000 -5.734,000<br />

03.01.00.16 Formwork Ceilling cellar 164,00 m2 164,00 0,000 -164,000<br />

03.01.00.17 Brick Walls 25 cm 295,00 m2 295,00 0,000 -295,000<br />

03.01.00.18 Ceilling above Ground floor 46,00 m3 46,00 0,000 -46,000<br />

03.01.00.19 Reinforcement 120 kg 5.519,00 kg 5.519,00 0,000 -5.519,000<br />

03.01.00.20 Formwork 184,00 m2 184,00 0,000 -184,000<br />

03.01.00.21 Attika 20 cm ,60 cm high 33,00 m2 33,00 0,000 -33,000<br />

03.01.00.22 Doors a. Gates 200x300 1,00 ST 1,00 0,000 -1,000<br />

03.01.00.23 Doors a. Gates 200x300 5,00 ST 5,00 2,000 -3,000<br />

03.01.00.24 Flat roof 170,00 m² 170,00 0,000 -170,000<br />

03.01.00.03 Sheet Piles -5 2 7<br />

03.01.00.00 Inlet Pump Station Structure 14.995 775.127 760.132<br />

03.02.00.00 Screen House<br />

03.02.00.01 Lean Concrete 148,00 m2 148,00 0,000 -148,000<br />

03.02.00.02 Base Slab 47,00 m3 47,00 0,000 -47,000<br />

03.02.00.03 Reinforcement 100 kg/m³ 4.725,00 kg 4.725,00 0,000 -4.725,000<br />

03.02.00.04 Forwork Base Slab 21,00 m2 21,00 0,000 -21,000<br />

03.02.00.05 Concrete B5 9,00 m3 9,00 0,000 -9,000<br />

03.02.00.06 Wall 1,35 h 17,00 m3 17,00 0,000 -17,000<br />

03.02.00.07 Reinforcement 100 1.733,00 kg 1.733,00 0,000 -1.733,000<br />

kg/m³<br />

03.02.00.08 Formwork Wall 117,00 m2 117,00 0,000 -117,000<br />

03.02.00.09 Intermedite ceiling 7,00 m3 7,00 0,000 -7,000<br />

03.02.00.10 Reinforcement 100 kg/m³ 683,00 kg 683,00 0,000 -683,000<br />

03.02.00.11 Formwork Ceiling 42,00 m2 42,00 0,000 -42,000<br />

03.02.00.12 Brick Walls 25 cm 221,00 m2 221,00 0,000 -221,000<br />

03.02.00.13 Concrete slab a.Groundfloor 38,00 m3 38,00 0,000 -38,000<br />

A B C D=C-B E F=B*E G=C*E H=D*E<br />

■ Complete data integration between<br />

the invoice and the calculation<br />

■ Target cost calculation<br />

■ Registration of actual working<br />

hours<br />

■ Data import and export for BAS<br />

hourly totals<br />

■ Forecast/actual comparison according<br />

to a construction work code<br />

(BAS) and cost types<br />

■ Recalculation of working hours<br />

including a forecast calculation<br />

about the development of working<br />

hours<br />

■ Optional classification of the cost<br />

structure for up to 3 levels<br />

■ Cost allocation follow-up<br />

Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />

/ 19.11.2008 17:01 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

Forecasting included<br />

<strong>The</strong> programme prepares a forecast<br />

calculation for you covering the<br />

expected total working hours until<br />

construction is completed.<br />

You are provided with a recalculation<br />

of the applied working hours for each<br />

invoiced performance position per unit.<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Controlling of hours<br />

Demoprojekt <strong>AUER</strong> Success<br />

Reihenhaussiedlung<br />

Item number Item text ESTIM.h/u. Estim.-amounts<br />

ACTUAL-h/u. ACTUAL-amounts BoQ-quant. Surv. quant. Estim. quant. Delta in h Delta % Estimation<br />

070107S Lateral Formwork Base Panel 0,6933 /m2 16,10<br />

20,00 m2 0,6158 /m2 14,30 23,22 m2 23,22 m2 -1,8 -11,2 % -1,8<br />

Iron Bars Base 0,0105 /kg 70,40<br />

070107V Reinforcement Panel<br />

2.111,00 kg 0,0107 /kg 71,56 6.704,64 kg 6.704,64 kg +1,2 +1,6 % +1,2<br />

Reinforcement Mat Base Panel 0,0085 /kg 42,74<br />

070107W<br />

3.920,00 kg 0,0082 /kg 41,34 5.028,48 kg 5.028,48 kg -1,4 -3,3 % -1,4<br />

Wall H3,2m C16/20 20-30cm thick 0,7273 /m3 12,71<br />

070201B Concrete to<br />

39,00 m3 17,48 0,0805 /m3 1,41 m3 39,00 m3 -11,3 -88,9 % -25,2<br />

H3,2m C20/25 thick 0,7273 /m3 112,12<br />

070201F Concrete Wall to 20-30cm<br />

70,00 m3 154,17 0,0805 /m3 12,42 m3 154,17 m3 -99,7 -88,9 % -99,7<br />

H3,2m C25/30 20-30cm thick 0,7273 /m3 86,95<br />

070201J Concrete Wall to<br />

63,00 m3 119,56 0,0805 /m3 9,63 m3 119,56 m3 -77,3 -88,9 % -77,3<br />

Concrete Wall H3,2m 0,4733 /m2 419,29<br />

070201S Formwork<br />

1.223,00 m2 0,4783 /m2 423,66 885,83 m2 1.223,00 m2 +4,4 +1,0 % +6,0<br />

Reinforcement Iron Bars Concrete H3,2m 0,0108 /kg 183,29<br />

070201V Wall<br />

3.852,00 kg 17.050,68 0,0109 /kg 186,33 kg 17.050,68 kg +3,0 +1,7 % +3,0<br />

Mat Concrete H3,2m 0,0088 /kg 111,90<br />

070201W Reinforcment Wall<br />

8.988,00 kg 12.788,01 0,0085 /kg 108,22 kg 12.788,01 kg -3,7 -3,3 % -3,7<br />

H3,2m C25/30 20cm 1,2000 /m3 26,96<br />

070218D Concrete Balk to<br />

3,00 m3 1,0844 /m3 24,36 22,46 m3 22,46 m3 -2,6 -9,6 % -2,6<br />

Concrete Balk H3,2m 1,3733 /m2 31,31<br />

070218S Formwork<br />

27,00 m2 1,5746 /m2 35,90 22,80 m2 27,00 m2 +4,6 +14,7 % +5,4<br />

Slab/Cnt. Pla. H3,2m b.25cm 0,3089 /m3 65,32<br />

070301C Concrete C25/30<br />

177,00 m3 211,46 0,3376 /m3 71,39 m3 211,46 m3 +6,1 +9,3 % +6,1<br />

Slab/Cantilever Plate 0,5733 /m2 529,00<br />

070301S Formwork H3,2m<br />

887,00 m2 0,5597 /m2 516,40 922,68 m2 922,68 m2 -12,6 -2,4 % -12,6<br />

Iron Bars Slab/Cant. Pl.H3,2m 0,0105 /kg 151,65<br />

070301V Reinforcement<br />

6.208,00 kg 14.442,96 0,0107 /kg 154,15 kg 14.442,96 kg +2,5 +1,6 % +2,5<br />

Slab/Cantilever Plate.H3,2m 0,0085 /kg 92,07<br />

070301W Reinf. Mat<br />

11.530,00 kg 10.832,22 0,0082 /kg 89,05 kg 11.530,00 kg -3,0 -3,3 % -3,2<br />

Stiege/Podest.H3,2m b.20cm 1,7647 /m3 59,66<br />

070325A Beton C20/25<br />

4,00 m3 33,81 1,7283 /m3 58,43 m3 33,81 m3 -1,2 -2,1 % -1,2<br />

Stiege/Podest gerade+Wangen H3,2m 2,4083 /m2 311,74<br />

070325S Schalung<br />

35,00 m2 129,44 m2 2,4119 /m2 312,20 129,44 m2 +0,5 +0,1 % +0,5<br />

Project: C:\BS4\DAT\Demoprojekt_<strong>AUER</strong>_Success_NG_englisch Page: 2<br />

/ 19.11.2008 17:08 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

Working hours recalculation including forecast<br />

47


Manpower specification<br />

Perfect data integration<br />

With this programme module you can<br />

link the measurements that are part of<br />

the construction invoice with the data<br />

of the calculation. You can filter out<br />

the invoicing quantities according to<br />

numerous criteria, all the way to individual<br />

measurement sheets. By linking<br />

time periods, equipment and material<br />

estimates, you define a shopping basket.<br />

This makes it possible to quickly create<br />

the required data without extra effort<br />

which are needed for implementing<br />

performance-oriented piecework wages,<br />

the planning of construction time and<br />

the deployment of men, machines and<br />

materials.<br />

Depending on what you require, you<br />

can apply a conversion factor to the<br />

planned construction time at the site.<br />

Planning of work packages<br />

Construction time planning, staff disposition,<br />

piecework wages and bonus<br />

calculations; all of these working areas<br />

are supported with analyses and working<br />

aids. Adapted printouts have been<br />

made available for various purposes,<br />

such as for instance a summarised list<br />

of guidelines which includes an hourly<br />

value for each construction part, or a<br />

detailed sheet of all volume calculations,<br />

including the time and materials<br />

that have been planned.<br />

For the construction site manager<br />

<strong>The</strong> list of planned working hours is a<br />

useful instrument for planning and coordinating<br />

the deployment of staff on the<br />

construction site. Such a working hour<br />

plan offers the required comparative<br />

data which are needed<br />

for a short-term control<br />

or comparison of performance.<br />

As the construction site<br />

Item number<br />

manager, you will super-<br />

KG<br />

Außenwände<br />

vise the intermediate<br />

objectives of each day<br />

that have been set by<br />

the foreman.<br />

For the foreman<br />

<strong>The</strong> weekly planning is a<br />

helpful basis for the foreman<br />

or team leader, for<br />

distributing the work,<br />

ordering materials and<br />

for supervising<br />

performance.<br />

<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

Hours quota 0003<br />

Demoprojekt <strong>AUER</strong> Success<br />

Reihenhaussiedlung<br />

With this data, which is derived from the<br />

work packages that have been provided<br />

by the construction site management,<br />

the foreman can prepare his own weekly<br />

work plans.<br />

KG/Außenwände<br />

07 02 01 J Concrete Wall H3,2m C25/30 to 20-30cm thick<br />

((28,5*2,7*0,3)+(8,4*2,7*0,3))*2 ;alle KG-Außenwände = 59,778 m3 * 0,7273 = 43,47<br />

07 02 01 S Formwork Concrete Wall H3,2m<br />

(28,5*2,7)*2+(8,4*2,7)*2 = 199,260 m2 * 0,4733 = 94,32<br />

07 02 01 V Reinforcement Iron Bars Concrete Wall H3,2m<br />

80*89,778 = 7.182,240 kg * 0,0108 = 77,21<br />

07 02 01 W Reinforcment Mat Concrete Wall H3,2m<br />

60*89,778 = 5.386,680 kg * 0,0088 = 47,13<br />

07 02 01 F Concrete Wall H3,2m C20/25 to 20-30cm thick<br />

(8,4*0,25*2,7)*4 ;Trennwände der Häuser = 22,680 m3 * 0,7273 = 16,49<br />

L=28,50 = 28,500<br />

B=9,00 = 9,000<br />

H=3,10 = 3,100<br />

Requirements can be queried<br />

with the help of numerous criteria<br />

BCC : 2 WP : 002 IP : 002 Checked : N<br />

Item text<br />

Calc.of measurement Result u. h/u. Total hours<br />

12 15 02 A Perimeterdämm.XPS-G 30/S 50mm<br />

(L*H)*2+(B*H)*2 = 232,500 m2 * 0,1500 = 34,88<br />

Total Hours quota 0003 313,50<br />

Created 09.08.2007 for the contractor checked _ _ . _ _ . _ _ _ _ for the client<br />

19.11.2008 17:17 Project: C:\BS4\DAT\Demoprojekt_<strong>AUER</strong>_Success_NG_englisch Printed with <strong>AUER</strong> Success Version 5.00 FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />

/ -<br />

Working hour definition by work packages<br />

48


Book of offers<br />

Manpower specification<br />

at a glance<br />

Analysis of tenders<br />

A central registration of all requests<br />

for tenders, submitted offers and the<br />

results makes work in the administration<br />

offices easier. Our software provides<br />

statistics and analyses. Surveillance of<br />

competitors and a precise analysis of<br />

the offers that were submitted provides<br />

your management with valuable information<br />

for its own tendering strategies<br />

and policies.<br />

Analyses as a decision-making aid<br />

■ Which calculator signs the most contracts?<br />

■ How do the results of one's own<br />

company compare with those of<br />

one's competitors?<br />

■ For which category of construction<br />

project are the contracts good or<br />

bad?<br />

■ Which competitor has recently made<br />

the lowest offers?<br />

To be able to answer these questions<br />

quickly, the module "Angebotsbuch"<br />

(tender journal) represents an ideal<br />

tool. <strong>The</strong> results of tender offers can<br />

be filtered and sorted by you according<br />

to numerous parameters. Each offer is<br />

linked to a corresponding cover sheet<br />

and formula, including clearly structured<br />

benchmark data.<br />

Many advantages<br />

A tabular form is used for inputting<br />

offers. <strong>The</strong> form is adapted to your<br />

requirements by hiding or displaying<br />

certain columns and lines, and through<br />

the various sorting functions.<br />

<strong>The</strong> administration of your own offer<br />

prices and those of your competitors is<br />

carried out by you.<br />

Important deadlines are passed directly<br />

on to MS Outlook. A perfect follow-up<br />

on deadlines is guaranteed. Due to the<br />

capability for networking the application,<br />

it is assured that your entire team can<br />

access the same database.<br />

■ List of requirements by construction<br />

parts, performance periods<br />

and measurement sheets<br />

■ Classification of planned working<br />

hours by construction work codes<br />

■ Planning grid for personnel, equipment<br />

and material deployment<br />

■ Material and equipment requirements<br />

according to ABC weighting<br />

Required programming modules:<br />

- Calculation<br />

- Invoicing<br />

Book of offers<br />

at a glance<br />

■ Clearly structured administration of<br />

offers<br />

■ Strategic surveillance of competitors<br />

■ Module-independent and therefore<br />

deployable in a flexible manner<br />

■ Networking capacity supports<br />

teamwork<br />

■ Deadline import into MS Outlook<br />

All important information for an offer on a single template<br />

49


Daily report tool<br />

Daily construction site reporting<br />

<strong>The</strong> daily preparation of reports is a<br />

time-consuming chore for engineers and<br />

construction site managers. By means of<br />

basic settings and optimized copy-andpaste<br />

possibilities, daily paperwork is<br />

reduced to a minimum.<br />

All input fields can be parametrised for<br />

frequently returning values. A construction<br />

diary can be prepared in one single<br />

screen mask.<br />

Text processing<br />

This module supports all installed font<br />

types and all important formatting commands.<br />

You can use the integrated text<br />

processing system for describing the<br />

construction performances that have<br />

been carried out.<br />

Direct access to the bill of quantities<br />

Within the text processing module, you<br />

have direct access to the bill of quantities.<br />

A review of this long text document<br />

saves searching of the bill of quantities.<br />

Construction diary in a single well-organised mask<br />

Integrated volume calculation<br />

Each construction diary offers the<br />

possibility of quickly calculating measurements.<br />

You can use these volume<br />

calculations for preparing new measurement<br />

sheets in the "Bauabrechnung"<br />

module (optional). <strong>The</strong> results of these<br />

measurements are inserted into interim<br />

and final invoices.<br />

Construction plan logging<br />

<strong>The</strong> daily deliveries of construction<br />

plans are protocolled in the integrated<br />

construction plan log. This gives you<br />

an overview of the plans that you have<br />

received and passed on. <strong>The</strong> assignment<br />

of recipients and senders of plans<br />

are coordinated in the integrated address<br />

management module.<br />

50


At a glance<br />

Cost registration<br />

Actual costs are recorded in your own<br />

table on the basis of all operating<br />

resources utilised in the calculation.<br />

You are supported by high-performance<br />

searching and copying functions, when<br />

monitoring the actually performed working<br />

hours, material consumption and<br />

actual equipment deployment times<br />

each day.<br />

An analysis of the total cost can be carried<br />

out by operating resource or cost<br />

type criteria. An ongoing and precise<br />

control of costs is made easy with this<br />

tool.<br />

Contract work reporting<br />

This module offers you the same comfort<br />

when preparing your contract work<br />

reports. This report can be integrated in<br />

your construction diary or it can be printed<br />

out separately. <strong>The</strong> data of contract<br />

work performances can be transferred<br />

to the module "Bauabrechnung ".<br />

Investigation<br />

Would you like to know when and in<br />

what connection the word "acceptance"<br />

has, for instance, been used in a report?<br />

You do not longer have to search<br />

through the entire construction diary. Let<br />

your PC do the searching for you. <strong>The</strong><br />

result is a list of the reports, in which the<br />

required term occurs.<br />

In addition, data queries of the construction<br />

plan log will quickly provide an<br />

answer as to who received which plan<br />

and when.<br />

■ Administration of construction diaries<br />

in a single database<br />

■ Storage of workmen, employee<br />

and equipment deployment<br />

■ Direct access to the bill of quantities<br />

■ Fulltext search feature in all prepared<br />

texts<br />

■ Contract work reporting<br />

■ Construction plan logging<br />

■ Cost registration, including access<br />

to master data of the calculation<br />

Optional programme modules:<br />

- Invoicing<br />

- Calculation<br />

- Controlling<br />

<strong>The</strong> text processing module has access to the bill of quantities<br />

51


Mobile measuring system<br />

Bild by Hilti<br />

<strong>AUER</strong> Success NG at the construction<br />

site<br />

Handling projects directly at the<br />

construction site is no longer a problem<br />

with the mobile measuring system.<br />

You can download as many <strong>AUER</strong><br />

Success projects to your Pocket PC<br />

(PDA) as you like, and then take them<br />

along to the construction site. <strong>The</strong>re you<br />

can then prepare your measurement<br />

sheets.<br />

<strong>The</strong> system has a complete bill of quantities<br />

at its disposal.<br />

If a laser measuring device is not available,<br />

then the data can also be entered<br />

manually into each corresponding measurement<br />

sheet.<br />

Recovery of data<br />

<strong>The</strong> measurement sheets that were<br />

prepared at the construction site are<br />

downloaded from your PDA and subsequently<br />

into an <strong>AUER</strong> Success project,<br />

when you are back at the office. This<br />

means that you dispose over a PDA and<br />

a PC version of the mobile measuring<br />

system and can switch between both<br />

without problems. <strong>The</strong> PDA version can<br />

also be used as an optimal supplement<br />

to the <strong>AUER</strong> construction diary.<br />

Laser-controlled measuring<br />

<strong>The</strong> distance measuring device uses<br />

wireless technology, which can be used<br />

without any problems at every construction<br />

site. Distances can be measured in<br />

every direction from a single point. This<br />

work can be carried out by a single person.<br />

<strong>The</strong> measuring device is light and<br />

easy to handle. <strong>The</strong> PDA is linked to the<br />

measuring device and measurements<br />

are immediately recorded there. <strong>AUER</strong><br />

has designed the user interface in its<br />

new software in such a way that everyone<br />

can work with this product after a<br />

short introduction.<br />

52


At a glance<br />

Ideal for construction site managers<br />

and foremen<br />

If you are working at a construction site,<br />

and if measurements must be taken<br />

quickly and processed in a comfortable<br />

way, then the mobile measuring system<br />

from <strong>AUER</strong> is your ideal module. Due<br />

to the laser-controlled distance measuring<br />

device, a manual measurement of<br />

distances belongs to the past.<br />

You can travel back and forth between<br />

the construction site and your office,<br />

and you only need a few operations for<br />

transferring the required data from your<br />

PC to an easily transportable PDA or<br />

vice-versa. This means a substantial<br />

reduction of your daily work.<br />

Fewer working steps<br />

Measuring dimensions and inputting<br />

this data into your software used to<br />

require a number of different operations.<br />

Due to the connection of the laser<br />

distance measuring devices with <strong>AUER</strong><br />

Success NG , you do not longer have to<br />

carry out the time-consuming entry of<br />

data. This also prevents sources of error<br />

due to the wrong acquisition of data.<br />

■ A new module for deployment at<br />

the construction site<br />

■ Load <strong>AUER</strong> Success project into<br />

your PDA and vice-versa<br />

■ Create measurement sheets<br />

directly at the construction site<br />

■ Simple to operate<br />

■ A robust device that can be used at<br />

every construction site<br />

■ Largely independent of light conditions<br />

■ Results are perfectly documentable<br />

in <strong>AUER</strong> <strong>SuccessNG</strong><br />

■ Manual data entry is a thing of the<br />

past<br />

Read in the measured data from the<br />

PDA to <strong>AUER</strong> Success NG<br />

53


54<br />

OPERATING.<br />

<strong>The</strong> interaction of the modules of <strong>AUER</strong> Success NG


<strong>AUER</strong> <strong>Bausoftware</strong> provides software<br />

modules which meet the requirements<br />

of various users in architectural and<br />

planning offices. Below we will provide<br />

an overview of how these modules<br />

interact.<br />

By linking individual programme<br />

modules it is possible to develop a<br />

clear project flow that eliminates problems,<br />

including a tender offer, cost<br />

planning, order management, bookkeeping,<br />

project handling and all the<br />

way to personnel management.<br />

55


Module overview tendering and price comparision<br />

Module Tendering<br />

One-on-one or<br />

group gathering<br />

Module Building components<br />

Build-up with predefined<br />

elements<br />

Recommended prices<br />

Cost estimation with<br />

average prices<br />

Cost<br />

estimation<br />

Create<br />

items<br />

BoQ<br />

Bill of<br />

quantity<br />

Module Building database<br />

Cost estimation with<br />

current market prices<br />

Module Quantity surveying<br />

Quantity calculation<br />

with measurement sheets<br />

Data transfer<br />

ÖNorm GAEB MS-Excel PDF<br />

Module Price comparision<br />

Lowest price and<br />

best value detection<br />

56


At a glance<br />

■ Seamless data exchange between<br />

the modules<br />

■ Data need only be entered once<br />

and is thereafter available for all<br />

other functions<br />

■ <strong>The</strong>se functions can handle the<br />

simplest applications, but also very<br />

complex tasks<br />

■ Different working procedures and<br />

individual requirements are supported<br />

■ Due to the modular structure of<br />

our software, performance can be<br />

expanded whenever needed<br />

Module Minutes of Meeting<br />

Simple compilation and<br />

management of documents<br />

Module Cost management<br />

Order, invoice and<br />

payments management<br />

Module Construction schedule<br />

Project coordination<br />

scheduling<br />

Contract<br />

BoQ<br />

57


Module overview calculation<br />

BoQ<br />

Data transfer<br />

ÖNorm GAEB MS-Excel <strong>Auer</strong><br />

Module Calculation<br />

Automated costing<br />

and pricing<br />

Module Gross average wage<br />

Calculation and control<br />

of gross average wages<br />

Module Recources - search<br />

and replace<br />

Automated interchange<br />

Standardcalculation<br />

Predefined calculation<br />

estimates<br />

58


At a glance<br />

Module Controlling<br />

recalculation including<br />

forecast calculation<br />

■ Simplified calculation due to<br />

recommended prices and standard<br />

calculation templates<br />

■ Individual modules interact with<br />

each other, the modules interact<br />

smoothly<br />

■ Data need only be entered once<br />

and are thereafter available for all<br />

other functions<br />

■ Performance can be expanded<br />

whenever needed due to the<br />

modular structure of our software<br />

Calculation<br />

of<br />

costs<br />

CA<br />

Offer<br />

Strategic<br />

pricing<br />

Module Book of offers<br />

Tender management and<br />

competitor analysis<br />

59


Module overview quantity surveying and accounting<br />

Module Mobile measuring system<br />

Laser-supported generation of<br />

measurement sheets at the site<br />

Module Daily report tool<br />

effort tracking for daily<br />

and contract work reports<br />

Contract<br />

BoQ<br />

Module Accounting<br />

object-oriented quantity calculation<br />

in measurement sheets<br />

Part payment<br />

invoice<br />

RE<br />

Closing invoice<br />

60


At a glance<br />

■ Data exchange with the partner via<br />

defined interfaces<br />

■ Clearly ordered corrections of the<br />

received settlement vouchers<br />

■ <strong>The</strong> individual modules interact<br />

with one another. <strong>The</strong> modules<br />

interact smoothly<br />

■ Due to the modular structure of<br />

our software, performance can be<br />

expanded whenever needed<br />

Data transfer<br />

ÖNorm GAEB MS-Excel PDF<br />

Modul Quantity surveying check<br />

Electr. check and correction<br />

of quantity surveys<br />

Auditing of accounts<br />

61


<strong>AUER</strong> <strong>Bausoftware</strong><br />

A partner for your success<br />

<strong>AUER</strong> <strong>Bausoftware</strong> GmbH is a reliable<br />

partner with long-term experience<br />

whose know-how can help you to assure<br />

your success.<br />

Consulting<br />

A decision for <strong>AUER</strong> <strong>SuccessNG</strong> is also<br />

a decision for tested and well-established<br />

forms of organisation. We will gladly<br />

give you our advice in implementing<br />

your plans and ideas. <strong>The</strong> experience<br />

from thousands of installations at more<br />

than 3,000 customers is at your disposal.<br />

Seminars<br />

<strong>AUER</strong> Software Trainings help to raise<br />

your efficiency. Such training helps you<br />

to become a professional in the use of<br />

the software modules you use daily.<br />

Excellently skilled <strong>AUER</strong> employees<br />

provide trainings that meet your individual<br />

requirements. <strong>The</strong> scheduled<br />

dates of individuals seminar sessions<br />

can be viewed on the <strong>AUER</strong> website at<br />

www.bausoftware.at. We will also gladly<br />

organise customized seminars for you,<br />

or we can make an appointment at your<br />

offices for presenting particular software<br />

applications.<br />

Software maintenance<br />

Protect your software investments by<br />

concluding a maintenance contract with<br />

<strong>AUER</strong>!<br />

Such a maintenance contract puts all<br />

support possibilities at your disposal.<br />

Your benefits:<br />

■ You will always work with the most<br />

up-to-date programme version!<br />

■ Our hotline is at your disposal without<br />

any limits and at no charge!<br />

■ Remote support is provided by<br />

means of Netviewer!<br />

■ Seminars at reduced prices!<br />

Hotline<br />

Things that hinder one in continuing<br />

with one's work are often quite simple:<br />

<strong>The</strong> possibility of working with <strong>AUER</strong><br />

software should be available to everyone.<br />

A simple and fast use of our programme<br />

is the most important objective<br />

of our work! Our hotline staff provides<br />

step-by-step instructions using simple<br />

words that help you to reach your goal.<br />

You do not have to be a computer<br />

expert for this! If anything it is not clear<br />

when using <strong>AUER</strong> construction engineering<br />

software, please do not hesitate<br />

to contact us. We will be happy to assist<br />

you.<br />

Data maintenance<br />

Also the data used in standardized<br />

calculations is subject to permanent<br />

change. Prices, construction methods<br />

and bill of quantities continue to change.<br />

<strong>The</strong> impact of such changes is continuously<br />

reflected in our databases. <strong>AUER</strong><br />

data maintenance makes adapted standard<br />

calculations available whenever<br />

the bill of quantities change.<br />

Project support<br />

Our know-how and our services are<br />

available at all times for implementing<br />

your projects, especially in developing<br />

solutions for extraordinary assignments.<br />

Describe us your situation and requirements,<br />

we will gladly advise you on the<br />

best solution. Our experienced team<br />

will support you in word and deed at all<br />

times.<br />

©<br />

<strong>AUER</strong> – <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />

E-Mail: office@bausoftware.at<br />

www.bausoftware.at

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!