20.06.2015 Views

CMX 2004 - Plumbing & HVAC

CMX 2004 - Plumbing & HVAC

CMX 2004 - Plumbing & HVAC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

tekmar’s Complete Line of Multiple Boiler<br />

Controls with Outdoor Reset & DHW Control<br />

Boiler Control 265<br />

• Up to 3 Modulating Boilers<br />

• 0-20 mA or 4-20 mA Outputs<br />

• Parallel or Sequential Modulation<br />

Boiler Control 268<br />

• Up to 9 On/Off Stages<br />

• 1, 2, 3 or 4 Stage Boilers<br />

Boiler Control 264<br />

• Up to 4 On/Off Stages<br />

• 1, 2, 3 or 4 Stage Boilers<br />

Common Features<br />

• Characterized Heating Curves<br />

• Pump Exercising<br />

• Supply and Return Sensors<br />

• Automatic Boiler Differential<br />

• Equal Run-Time Rotation<br />

• Fixed Last Rotation<br />

• Boiler Mass Setting<br />

• Fire Delay Setting<br />

• Fixed Lead Rotation<br />

• Combustion Air or Alarm Contact<br />

• Boiler Running Hours<br />

• Setpoint Priority Operation<br />

• DHW Pump or Valve<br />

Operation<br />

Domestic Hot Water Modes<br />

• Parallel or Primary-<br />

Secondary Piping<br />

• DHW Priority<br />

Boiler Pump Operation<br />

• Individual boiler pumps provide pre-purging and post-purging of each boiler<br />

External Input (265 and 268)<br />

• For 0 - 10 V (dc) signal from a Building Automation System (BAS)<br />

visit the tekmar web site at www.tekmarcontrols.com<br />

tekmar Control Systems Ltd., Canada, tekmar Control Systems, Inc., U.S.A.<br />

Head Office: 5100 Silver Star Road, Vernon, B.C. Canada, V1B 3K4 Tel. (250) 545-7749 Fax. (250) 545-0650<br />

Circle Number 122 for More Information

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!