18.06.2015 Views

FIELD LEVEL RISK ASSESSMENT

FIELD LEVEL RISK ASSESSMENT

FIELD LEVEL RISK ASSESSMENT

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>FIELD</strong> <strong>LEVEL</strong> <strong>RISK</strong> <strong>ASSESSMENT</strong><br />

DATE:<br />

LOCATION:<br />

PROJECT NAME:<br />

COMPANY:<br />

STEP 1 – IDENTIFY MAIN JOB TASKS STEP 2 – IDENTIFY HAZARDS STEP 3 – ASSESS <strong>RISK</strong><br />

(<strong>RISK</strong> = PROBABILITY X CONSEQUENCE)<br />

STEP 4 – CONTROL HAZARDS<br />

HAZARD WHAT CONTROL BY WHOM WHO CHECKED<br />

FOLLOWUP REQUIRED<br />

ISSUED BY:<br />

SUP/LEADER REVIEW:


STEP 1.<br />

STEP 2.<br />

IDENTIFY MAIN JOB TASKS<br />

IDENTIFY HAZARDS<br />

STEP 3. ASSESS <strong>RISK</strong> (<strong>RISK</strong> = PROBABILITY X CONSEQUENCES)<br />

P R O B A B I L I T I E S<br />

C<br />

O<br />

N<br />

S<br />

E<br />

Q<br />

U<br />

E<br />

N<br />

C<br />

E<br />

S<br />

H M L<br />

H H H M<br />

PROBABILITY<br />

CONSEQUENCE<br />

H. OFTEN H. SERIOUS<br />

M. SOMETIMES M. MODERATE<br />

M H M L L. RARELY L. MINOR<br />

L M L L<br />

HOW TO ASSESS <strong>RISK</strong> TOOL:<br />

a) Ask yourself “how probable” is this hazard to result in loss to people, property, material and<br />

environment, if left uncontrolled.<br />

b) Ask yourself if this uncontrolled hazard was to result in a loss, “how severe would the<br />

consequence be”<br />

c) Locate your answer to probability and consequence questions on the 3 x 3 chart (i.e. high,<br />

medium, low)<br />

d) Put in place the controls appropriate for the level of risk<br />

e) Complete documentation<br />

STEP 4.<br />

STEP 5.<br />

STEP 6.<br />

CONTROL(S)<br />

DOCUMENT<br />

GO TO WORK

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!